| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹24.8 CrAdmitted-Finance | L1 | Admitted-Finance | ||
| 2 | L2₹25.5 Cr+₹62.0 L (2.50%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹26.7 Cr+₹1.8 Cr (7.35%)Admitted-Finance | L3 | Admitted-Finance | ||
| 4 | L4₹28.0 Cr+₹3.1 Cr (12.6%)Admitted-Finance AA CLASS RUDRA COMPLEX 100 FEET ROAD SRIGANGANAGAR RAJASTHAN | SRIGANGANAGAR | SRIGANGANAGAR | RAJASTHAN | L4 | Admitted-Finance |
Tender Value
₹27.0 Cr
EMD Value
₹53.9 L
Closing Date
6 Nov 2025, 6:00 pmClosed
ACE PWD Zone Bikaner
ACE PWD Zone Bikaner
Widening and construction of road Sri Karanpur to Kesrisinghpur via Dhanoor m 0/0 to 27/0
2025_CEPWD_499685_1
ACE_BKN_Majorwork_SGNR
Open Tender
Civil Works - Roads
Percentage
365 days
Sri Ganganagar
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,000
Through challan DDO code 10566
₹53.9 L
Yes
ACE PWD Zone Bikaner
27 Nov 2025
9 Sept 2025
7 Nov 2025
9 Sept 2025
6 Nov 2025
9 Sept 2025
27 Oct 2025
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Part- 'A' : Earth work, GSB & WMM Work | |||||
| - | Clearing and Grubbing Road Land Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per MoRTH Specification Clause 201. By Mechanical Means In area of non-thorny jungle | 24.3 | Hect. | 12,513 | ₹3,04,065.9 |
| - | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per MoRTH Specification Clause 301.3 | 93,942.04 | Cum | 31 | ₹29,12,203.24 |
| - | Construction of Subgrade and Earthen Shoulders Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300-2 with lead upto 50 m as per MoRTH Specification Clause 305.3 | 93,942.04 | Cum | 59 | ₹55,42,580.36 |
| - | Granular Sub-base with Well Graded Material (Table 400-1) By Mix in Place Method Construction of granular sub-base by providing well graded material, spreading in uniform layers with Tractor Mount Grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per MoRTH Specification Clause 401. For Grading III Material | 23,301.75 | Cum | 976 | ₹2,27,42,508 |
| - | Milling of distress bitumenous layer upto 70mm depth in a single pass with suitable milling machine (capable of milling @ 200&300 sqm of area per hr) fitted with loading conveyer of loading the filled material directly on the trucks i/c hauling and stock pilling the reclaiming to bring to required specification to reuse with the approval of engineer - in - charge for safe disposal; with all leads and lifts complete in all respect as directly by Engineer - in- charge.
*Note : The unutilized quality of reclaimed bituminous mix material shall be recovered. | 79,210 | Sqm | 26 | ₹20,59,460 |
| - | Wet Mix Macadam Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with smooth wheel roller of 80 to 100kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400-12 & 400-13 and MoRTH Specification Clause 406. By Mechanical Means with 1 km lead | 40,664.5 | Cum | 1,900 | ₹7,72,62,550 |
| 2Part- 'B' : Bituminous Work | |||||
| 2.01 | Prime Coat Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base(WBM/WMM) including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per MoRTH Specification Clause 502 | 1,94,850 | Sqm | 31 | ₹60,40,350 |
| - | Tack Coat Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per MoRTH Specification Clause 503. | 1,94,850 | Sqm | 11 | ₹21,43,350 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.89 MB
BIDdhanoor.pdf
Tender Documents • 15.28 MB
BOQ_890801.xls
BOQ • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .