Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹4.3 LAccepted-Finance D NO 4 6 92 PERIYAR NAGAR THANGAMAPURIPATTINAM METTUR DAM 636402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | 1 | Accepted-Finance Satisfied | |
| 2 | 2₹4.9 L+₹58,415 (13.5%)Accepted-Finance 36 204 N NO 52 204 V O C NAGAR THANGAMAPURIPATTINAM METTUR DAM 636 402 | METTUR DAM | SALEM | TAMIL NADU | 636402 | 2 | Accepted-Finance Satisfied | |
| 3 | 3₹5.9 L+₹1.5 L (35.5%)Accepted-Finance M 18 HOUSING BOARD UNIT MADAYANKUTTAI POST METTUR DAM 636 452 | METTUR DAM | SALEM | TAMIL NADU | 636452 | 3 | Accepted-Finance Satisfied |
| Sl No | Description | Qty | Unit | THIAGARAJAN ENGINEERING CONTRACTOR L3 | ARR AND CO L1 | KEEN ERECTORS L2 |
|---|---|---|---|---|---|---|
| 1.00 | Charges for buffing water wall tubes for tube thickness survey | 225 | Mtr | 490 ₹1,10,250 | 384 ₹86,400 Lowest | 429 ₹96,525 |
| 2.00 | Charges for providing assistance in Boiler tube thickness Survey | 4,500 | Points | 18 ₹81,000 | 14 ₹63,000 Lowest | 16 ₹72,000 |
| 3.00 | Charges for conducting Boiler tube thickness survey and hire charges for ultrasonic thickness gauge. | 4,500 | Points | 7 ₹31,500 | 4.5 ₹20,250 Lowest | 5 ₹22,500 |
| 4.00 | Charges for conducting tube thickness survey by physical verification in boiler 2nd pass and inter pass area, arranging necessary lighting inside the Boiler | 1 | Time | 31,000 ₹31,000 | 24,042 ₹24,042 Lowest | 26,800 ₹26,800 |
| 5.00 | Charges for leading, lifting of scaffolding materials and erection of platform and scaffolding at S.H/W.W screen tube area, Eco hanger tube area, Economiser Hopper area and ‘S’ panel area to conduct Boiler tube thickness survey and tube rectification work and removal of platform and scaffolding. | 1 | Time | 98,000 ₹98,000 | 77,068 ₹77,068 Lowest | 85,900 ₹85,900 |
| 6.00 | Charges for cutting removal of shrouding provided on Boiler tubes & bends for identify the tube erosion | 100 | Nos | 170 ₹17,000 | 128.5 ₹12,850 Lowest | 144 ₹14,400 |
| 7.00 | Charges for fixing shrouding at erosion prone Boiler tubes & bends by Tac welding. | 200 | Nos | 290 ₹58,000 | 225 ₹45,000 Lowest | 251 ₹50,200 |
| 8.00 | Charges for transporting the refractory from store and unloading at site,leading, lifting , stacking at 7m to 52m and removing the waste refractory from boiler lowering to the ground floor,loading to tipper and disposing at waste disposal area of MTPS-I | 3,000 | Kg | 6 ₹18,000 | 3 ₹9,000 Lowest | 4 ₹12,000 |
| 9.00 | Charges for chipping removal of old defective refractory, cleaning, surface preparation, mixing the refractory with water application and curing the patch worked refractory in Boiler at various elevation | 3,000 | Kg | 20 ₹60,000 | 14 ₹42,000 Lowest | 16 ₹48,000 |
| 10.00 | Stainless steel electrode | 100 | Nos | 75 ₹7,500 | 58 ₹5,800 Lowest | 65 ₹6,500 |
Tender Value
Refer Docs
EMD Value
₹4,800
Closing Date
9 Sept 2026, 2:00 pmClosed
Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I BM Unit III Boiler Pressure parts AOH 2026 Tube thickness survey Water wall buffing providing platform renewal of shroudings and allied works
2026_EB_700928_1
CE / MTPS-I / SE / M-I / BM /OT. 42 / 2026-27
Open Tender
Power/Energy Projects/Products
Works
20 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹4,800
Yes
11 Sept 2026
3 Sept 2026
10 Sept 2026
3 Sept 2026
9 Sept 2026
3 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Charges for buffing water wall tubes for tube thickness survey | 225 | Mtr | - | - |
| 2 | Charges for providing assistance in Boiler tube thickness Survey | 4,500 | Points | - | - |
| 3 | Charges for conducting Boiler tube thickness survey and hire charges for ultrasonic thickness gauge. | 4,500 | Points | - | - |
| 4 | Charges for conducting tube thickness survey by physical verification in boiler 2nd pass and inter pass area, arranging necessary lighting inside the Boiler | 1 | Time | - | - |
| 5 | Charges for leading, lifting of scaffolding materials and erection of platform and scaffolding at S.H/W.W screen tube area, Eco hanger tube area, Economiser Hopper area and ‘S’ panel area to conduct Boiler tube thickness survey and tube rectification work and removal of platform and scaffolding. | 1 | Time | - | - |
| 6 | Charges for cutting removal of shrouding provided on Boiler tubes & bends for identify the tube erosion | 100 | Nos | - | - |
| 7 | Charges for fixing shrouding at erosion prone Boiler tubes & bends by Tac welding. | 200 | Nos | - | - |
| 8 | Charges for transporting the refractory from store and unloading at site,leading, lifting , stacking at 7m to 52m and removing the waste refractory from boiler lowering to the ground floor,loading to tipper and disposing at waste disposal area of MTPS-I | 3,000 | Kg | - | - |
| 9 | Charges for chipping removal of old defective refractory, cleaning, surface preparation, mixing the refractory with water application and curing the patch worked refractory in Boiler at various elevation | 3,000 | Kg | - | - |
| 10 | Stainless steel electrode | 100 | Nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.79 MB
BOQ_842491.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .