| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.8 L+₹8,154.23 (3.00%)Rejected-Finance | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | GEORGE BALAKRISHNAN L1 | Russel Raj L2 |
|---|---|---|---|---|---|
| 1.00 | Labour for CC road cutting for laying water mains or sewer | 1 | cum | 1,393 ₹1,393 Lowest | 1,434.79 ₹1,434.79 |
| 2.00 | Supply and fixing of 80mm GI Pipe | 41 | m | 750 ₹30,750 Lowest | 772.5 ₹31,672.5 |
| 3.00 | Supplying, fabricating, erecting structural steel work for roofing welded or bolted type using MS channels, angles, plates and round bars etc. conforming to IS specification including primer coating and enamal painting as per Design given by the departmental officers etc, complete as per standard specification | 435 | kg | 113 ₹49,155 Lowest | 116.39 ₹50,629.65 |
| 4.00 | Plain Cement Concrete 1:2:4 (One part of Cement, two part of Crushed Sand (M- Sand), four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 0.5 | cum | 7,019 ₹3,509.5 Lowest | 7,229.57 ₹3,614.79 |
| 5.00 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - | 10 | cum | 8,734 ₹87,340 Lowest | 8,996.02 ₹89,960.2 |
| 6.00 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of 150mm thickness in RCC M20 concrete using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed. | 6 | sqm | 1,485 ₹8,910 Lowest | 1,529.55 ₹9,177.3 |
| 7.00 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 990 | kg | 91.5 ₹90,585 Lowest | 94.25 ₹93,307.5 |
Tender Value
₹3.3 L
EMD Value
₹3,300
Closing Date
19 Aug 2026, 3:00 pmClosed
Commissioner
Kollancode Municipal Office
Providing Handrail and Drainage Cover Slab at Kakulam to vilathivillai road (172011L104) in ward no.11 at Kollancode Municipality.
2026_MAWS_690413_1
885/2025/E1-13
Open Tender
Maintenance Works
Works
Kollancode Municipality
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹3,300
7 Oct 2026
3 Aug 2026
19 Aug 2026
3 Aug 2026
19 Aug 2026
3 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Labour for CC road cutting for laying water mains or sewer | 1 | cum | - | - |
| 2 | Supply and fixing of 80mm GI Pipe | 41 | m | - | - |
| 3 | Supplying, fabricating, erecting structural steel work for roofing welded or bolted type using MS channels, angles, plates and round bars etc. conforming to IS specification including primer coating and enamal painting as per Design given by the departmental officers etc, complete as per standard specification | 435 | kg | - | - |
| 4 | Plain Cement Concrete 1:2:4 (One part of Cement, two part of Crushed Sand (M- Sand), four coarse aggregates) using 20mm size ISS HBG metal including cost and conveyance of all materials to site and including for the mixing, laying and labour charges etc., complete as per standard specification | 0.5 | cum | - | - |
| 5 | Providing and laying in position Standardised Concrete Mix M-20 Grade in accordance with IS 456 - 2000 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement contenet of 325Kg/ cum and maximum water cement ratio of 0.55 including admixture (Plasticiser / super plasticiser) in recommended proportions as per IS 9103 to accelerate, related setting of concrete, improve workability without imparing strength and durability with about (5.0cum), 7730Kg of 20mm machine crushed stone jelly and with about (3.3 cum), 5156kg of 10 - 12mm machine crushed stone jelly and with about (4.79cum) 7670 kg of Crushed Stone Sand (M- Sand), but excluding cost of reinforcement grill and fabricating charges centering and shuttering but including laying, vibrating with mechanical vibrators, finishing, curing, etc and providing fixtures like fan clamps in the RCC floor / roof slabs wherever necessary without claiming extra cost etc., complete complying with standard specification and as directed by the departmental officers - | 10 | cum | - | - |
| 6 | Manufacturing, supplying and fixing Precast Reinforced Cement Concrete slabs of 150mm thickness in RCC M20 concrete using following HBGS jelly excluding cost of reinforcement steel in position but including cost of moulding charges, casting of slab, finishing, curing and fixing in position in all floors etc., complete complying with standard specification and as directed. | 6 | sqm | - | - |
| 7 | Suppling and fabricating and placing in position MS (or) R.T.S. bar for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors. | 990 | kg | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_830015.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.89 MB
BOQ_830015.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .