Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.9 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹13.3 L+₹36,131.50 (2.80%)Accepted-Finance NIRMANBHAVAN NIGAM VIHAR SHIMLA 2 | L2 | Accepted-Finance Accepted | |
| 3 | L3₹13.4 L+₹54,351.30 (4.21%)Accepted-Finance | L3 | Accepted-Finance Accepted |
Tender Value
Refer Docs
EMD Value
₹30,400
Closing Date
2 Feb 2022, 2:00 pmClosed
DFO Kunihar
Divisional Forest Officer Kunihar Distt. Solan HP
Construction of Percolation Tank (POND) at Chabad Nala, Bandh Beat, Kuthar Block, Kuthar Range under Kunihar Forest Division Distt. Solan H.P
2022_FD_56127_1
5047 dated 27.01.2022
Open Tender
Civil Works
Item Rate
60 days
DFO Kunihar
Please refer Tender documents.
8 documents required · 8 mandatory
₹350
DFO Kunihar
₹30,400
4 Feb 2022
27 Jan 2022
3 Feb 2022
28 Jan 2022
2 Feb 2022
28 Jan 2022
Amount
Clearing jungle including uprooting of rank vegetation, grass,brush wood, trees and saplings of girth upto 30 cm. measured at a height of 1 metre above ground andremoval of rubbish upto a distance of 20 metres outside the periphery of the area
Excavation work by mechanical means (Hydraulic excavator)/ manual means in foundation trenches or drains (not exceeding 1.5m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soils as directed, within a
Stone Soiling properly hand packed filling interstices with spalls consolidating with
Random rubble masonry/polygonal rubble masonry (uncoursed/brought to courses) with hard stones of approved quality in foundation and plinth including leveling up with cement concrete 1:6:12 (1 cement :6 sand 12 graded stone aggrigate 20 mm nominal size) at plinth level in foundation of stone Masonary wall.
Construction of Dry Stone Masonary including rough Dressing and placing
Providing and laying cement concrete 1:2:4 (1 Cement:2 Sand:4 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of Form work and reinforcement reinforced concrete work in Apron of 40mm nominal Size of
Providing and laying cement concrete 1:2:4 (1 Cement:2 Sand:4 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of Form work and reinforcement reinforced concrete work of 20mm nominal Size of Coarse
Providing and laying cement concrete 1:1;5:3 (1 Cement: 1.5 Sand: 3 graded stone aggregate 20 mm nominal size) and curing complete excluding cost of Form work and reinforcement reinforced concrete work.
Providing mild steel/ Tor steel reinforcement for R.C.C work including bending,
Barbed Fencing
Providing Sign Board
Carriage of Materials/Transportation Charges (10 Kmt.)
Carriage of Materials/Transportation Charges (Mule) (200 Mtr Approx.)
LALIT VERMA
Jai Gopal
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .