| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹76,114.86Accepted-AOC | ₹76,114.86 | L1 | Accepted-AOC L1 |
| 2 | L2₹78,289.60Rejected-AOC | ₹78,289.60 | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | THANIGAIVEL L1 | K NANDAKUMAR L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation. | 11.62 | Cum | 131.89 ₹1,532.56 | 131.89 ₹1,532.56 |
| 2.00 | Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc complete. | 1.94 | Cum | 4,950 ₹9,603 | 5,900 ₹11,446 |
| 3.00 | Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete | 38.4 | Sqm | 547.5 ₹21,024 | 547.5 ₹21,024 |
| 4.00 | Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc complete. | 4.42 | Sqm | 6,368.97 ₹28,150.85 | 6,368.97 ₹28,150.85 |
| 5.00 | Plastering with cement mortor 1:4 mix to 20mm thick including cost and conveyance of all materials to site and all labour charges etc., | 7.2 | Sqm | 582.46 ₹4,193.71 | 582.46 ₹4,193.71 |
| 6.00 | GST 18% | 1 | No | 11,610.74 ₹11,610.74 | 11,942.48 ₹11,942.48 |
Tender Value
Refer Docs
Closing Date
6 Mar 2026, 3:00 pmClosed
THE Block Development officer, Arcot
THE Block Development office, Arcot
Construction of drainage at North Street in K.Velur Panchayat
2026_RDTN_670970_1
A4/3447/2024
Open Tender
Civil Works
30 days
THE Block Development office, Arcot
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
22 Mar 2026
5 Mar 2026
6 Mar 2026
5 Mar 2026
6 Mar 2026
5 Mar 2026
Earth work excavation in all clauses of soil such as hard stiff clay, hard gravelly soil as per SS 20 B for narrow foundation.
Cement Concrete 1:4:8 mix using 40mm HBG metal including cost and conveyance of all materials to site and all labour charges etc complete.
Supplying & Erecting centering for sides & soffiots to Concrete works including cost and conveyance of all materials to worksite and all labour charges etc., complete
Cement Concrete 1:3:6 mix using 20mm HBG metal including cost and conveyance of all materials to site and all labour charges etc complete.
Plastering with cement mortor 1:4 mix to 20mm thick including cost and conveyance of all materials to site and all labour charges etc.,
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_806337.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.82 MB
BOQ_806337.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid