| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.9 LAccepted-AOC | ₹35.9 L | L1 | Accepted-AOC L1 QUOTED |
| 2 | L2₹36.0 LRejected-AOC HOUSE NO 2734 2ND FLOOR PHASE 7 SAS NAGAR MOHALI PUNJAB | S A S NAGAR | PUNJAB | 140103 | ₹36.0 L | L2 | Rejected-AOC L2 QUOTED |
| 3 | L3₹36.6 LRejected-AOC 368 PHASE 4 SAS NAGAR MOHALI 160059 PB | S A S NAGAR | PUNJAB | 160059 | ₹36.6 L | L3 | Rejected-AOC L3 QUOTED |
| 4 | L4₹37.8 LRejected-AOC 96 SECTOR 16 A CHANDIGARH 160015 | CHANDIGARH | CHANDIGARH | 160015 | ₹37.8 L | L4 | Rejected-AOC L4 QUOTED |
| 5 | L5₹41.3 LRejected-AOC H NO 1566 2 SECTOR 30 B CHANDIGARH | NA | NA | 160001 | ₹41.3 L | L5 | Rejected-AOC L5 QUOTED |
| Sl No | Description | Qty | Unit | Anil Kumar Gupta L4 | MOHAMMAD RASHID L5 | B N FRIENDS AND CO L6 | HARISH SALES CORPORATION L7 | Baba Engineers and Contractors L3 | Dhillon Construction Company L2 | MS FUTEC ENGINEERS L1 |
|---|---|---|---|---|---|---|---|---|---|---|
| .01Note :The unit rate quoted by the tenderer under Col No (13) of Sch `A’ (BOQ) unless specifically mentioned otherwise such as labour only/fixing only, for all items of works shall be deemed to be including cost of all materials, labour, tools and plants, testing and commissioning of work in position complete as required for entire completion of work. | ||||||||||
| 1.00 | Surface excavation n.exc (not exceeding) 30 cm deep and averaging 15cm deep and getting out in soft/loosec soil including removing excavated soil to a distance exceeding 250 metre but not exceeding 500 metre and depositing where directed at a level not exceeding 1.50 meter above the starting point , complete all as specified and directed by Engineer-in-Charge. | 696.36 | SQUARE METRE | 10 ₹6,963.60 | 30 ₹20,890.80 | 25 ₹17,409 | 40 ₹27,854.40 | 5 ₹3,481.80 | 18 ₹12,534.48 | 20 ₹13,927.20 |
| 2.00 | Excavating in trenches in soft /loose soil , not exceeding 1.5 m wide and not exceeding 1.5 m depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out, complete all as specified and directed by Engrineer-in-Charge. | 54.88 | CUBIC METRE | 250 ₹13,720 | 250 ₹13,720 | 150 ₹8,232 | 300 ₹16,464 | 160 ₹8,780.80 | 500 ₹27,440 | 190 ₹10,427.20 |
| 3.00 | Returning, filling in, including spreading, leveling, watering and well ramming in layers not exceeding 25cm thick each, excavated soil in trenches after the cables have been laid and tested, complete all as specified and directed by Engineer-in-Charge. | 27.01 | CUBIC METRE | 100 ₹2,701 | 100 ₹2,701 | 50 ₹1,350.50 | 60 ₹1,620.60 | 80 ₹2,160.80 | 500 ₹13,505 | 50 ₹1,350.50 |
| 4.00 | Removing excavated soil to a distance not exceeding 50 metre and depositing where directed at a level not exceeding 1.50 meter above the starting point , complete all as specified and directed by Engineer-in-Charge. | 27.87 | CUBIC METRE | 100 ₹2,787 | 80 ₹2,229.60 | 100 ₹2,787 | 90 ₹2,508.30 | 80 ₹2,229.60 | 600 ₹16,722 | 80 ₹2,229.60 |
| 5.00 | Hardcore of gauge exceeding 63 mm but not exceeding 100 mm of broken stone or boulders , deposited, spread and levelled in layers n exc. 15 cm thick, watered and rammed to a true surface , complete all as specified and directed by Engineer-in-Charge. | 92.34 | CUBIC METRE | 1,700 ₹1.6 L | 1,600 ₹1.5 L | 1,000 ₹92,340 | 1,500 ₹1.4 L | 900 ₹83,106 | 3,000 ₹2.8 L | 1,000 ₹92,340 |
| 6.00 | Plain cement concrete (1:4:8), type D-2, using 40 mm graded mechanically crushed stone aggregates and finished the surface rough to provide adequate bond for the topping as in sub base ,foundations, filling and mass concrete, complete all as specified and directed by Engineer-in-Charge. | 5.68 | CUBIC METRE | 2,800 ₹15,904 | 2,500 ₹14,200 | 2,500 ₹14,200 | 3,500 ₹19,880 | 2,500 ₹14,200 | 3,000 ₹17,040 | 1,800 ₹10,224 |
| 7.00 | Plain cement concrete ,75 mm thick (1:4:8) type D-2, using 40 mm graded mechanically crushed stone aggregates topping as in sub base ,foundations, filling and mass concrete, complete all as specified and directed by Engineer-in-Charge. | 375 | SQUARE METRE | 210 ₹78,750 | 200 ₹75,000 | 300 ₹1.1 L | 350 ₹1.3 L | 200 ₹75,000 | 200 ₹75,000 | 150 ₹56,250 |
| 8.00 | Plain cement concrete ,150 mm thick (1:4:8) type D-2, using 40 mm graded mechanically crushed stone aggregates topping as in sub base ,foundations, filling and mass concrete, complete all as specified and directed by Engineer-in-Charge. | 300 | SQUARE METRE | 380 ₹1.1 L | 380 ₹1.1 L | 500 ₹1.5 L | 500 ₹1.5 L | 280 ₹84,000 | 250 ₹75,000 | 300 ₹90,000 |
| 9.00 | Plain cement concrete ,100 mm thick (1:2:4) type B-2, using 40 mm graded mechanically crushed stone aggregates as in flooring finished the surfaces even and smooth (without using extra cement) , complete all as specified and directed by Engineer-in-Charge. | 300 | SQUARE METRE | 520 ₹1.6 L | 410 ₹1.2 L | 600 ₹1.8 L | 550 ₹1.6 L | 380 ₹1.1 L | 250 ₹75,000 | 400 ₹1.2 L |
Updated dates
Tender Value
₹43.7 L
EMD Value
₹87,340
Closing Date
17 Oct 2025, 6:00 pmClosed
GE (AF) Chandigarh
GE (AF) Chandigarh, Air Force Station Chandigarh-160003
PROVN OF SHED AND ALLIED WORKS IN FURNITURE YARD IN SECTOR 47 AT CHANDIGARH UNDER GE (AF) CHANDIGRAH.
2025_MES_731552_1
GE (AF)/CHD/T-49/2025-26
Open Tender
Civil Works
183 days
Chandigarh
Please refer Tender documents.
10 documents required · 10 mandatory
₹500
GE (AF) Chandigarh
₹87,340
Yes
22 Jan 2026
18 Sept 2025
24 Oct 2025
18 Sept 2025
17 Oct 2025
3 Oct 2025
18 Sept 2025 - 25 Sept 2025
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Document
0.47 MB
Tender Documents
Tender Documents • 1.75 MB
BOQ
BOQ • 1.35 MB
Download all tender documents and submit your bid