| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.0 CrAccepted-Finance | L1 | Accepted-Finance Being L1 | |
| 2 | L2₹2.0 Cr+₹3.8 L (1.88%)Rejected-Finance | L2 | Rejected-Finance Being L2 | |
| 3 | L3₹2.1 Cr+₹5.2 L (2.59%)Rejected-Finance | L3 | Rejected-Finance Being L3 |
Tender Value
₹2.0 Cr
EMD Value
₹4.0 L
Closing Date
4 Nov 2026, 2:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Executive Engineer
Executive Engineer University Works Department University of Jammu
Balance works of Construction of building of Innovation Tower G Plus 3 at New University Campus, University of Jammu
2026_UDJK_328848_1
enit 251 dated 16-10-2026
Open Tender
Civil Works
Percentage
180 days
University of Jammu
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,360
Executive Engineer University Works Department Uni
₹4.0 L
12 Nov 2026
21 Oct 2026
6 Nov 2026
21 Oct 2026
4 Nov 2026
21 Oct 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts,struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchors blocks, plain window sills, fillets etcupto floor V level, including curing but excluding the cost of centring, shuttering and finishing with 1:5:10 (1 cement : 5 coarse sand : 10 graded brick aggregate 40 mm nominal size) | 15 | Cum | 4,469.25 | ₹67,038.75 |
| 2 | Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-incharge. All work upto plinth level.
Note: - Cement in this item is @ 330 kg/ cum. Excess or less cement used as per design mix is content considered payable or recoverable separately. | 1.5 | Cum | 9,412.05 | ₹14,118.07 |
| 3 | Extra for providing richer mixes at all floor levels. Note:- Excess/ less cement over the specified cement content used is payable/ recoverable separately. Providing M-30 grade concrete instead of M-25 grade BMC/RMC. (Note:- Cement content considered in M-30 is @ 340 kg/cum) | 1.5 | Cum | 98.8 | ₹148.2 |
| 4 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete foundation and above plinth level.Thermo-Mechanically Treated bars of grade Fe-500D or more. | 325 | Kg. | 123.2 | ₹40,040 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Suspended floors, roofs, landings, balconies and access platform | 10 | Sqm | 718.2 | ₹7,182 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for:Lintels, beams, plinth beams, girders, bressumers and cantilevers | 20 | Sqm | 577.55 | ₹11,551 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for:Edges of slabs and breaks in floors and walls. Under 20 cm wide | 26 | meter | 262.2 | ₹6,817.2 |
| 8 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in Cement mortar 1:6 (1 cement : 6 coarse sand) | 20 | Cum | 7,571.55 | ₹1,51,431 |
| 9 | Extra for brick work with common burnt clay bricks in superstructure above plinth level upto floor five level | 20 | Cum | 1,455.65 | ₹29,113 |
| 10 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundations and plinth in a) Cement mortar 1:4 (1 cement : 4 coarse sand) | 110 | sqm | 947.25 | ₹1,04,197.5 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.97 MB
BOQ_1114247.xls
BOQ • 0.42 MB
corrri251.pdf
PDF • 0.42 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .