Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹16.0 LAccepted-AOC | L1 | Accepted-AOC Lowest | |
| 2 | L2₹16.0 L+₹5,445 (0.34%)Rejected-Finance NO 16 MARIAMMAN KOIL STREET KEEZHPARIKKALPATTU BAHOUR POST PUDUCHERRY 605 402 | VILLUPURAM | TAMIL NADU | 605402 | L2 | Rejected-Finance Not Lowest |
Tender Value
₹15.5 L
EMD Value
₹30,994
Closing Date
20 Apr 2023, 4:00 pmClosed
The Executive Engineer, ID., PWD., Puducherry.
The Executive Engineer, Irrigation Division, PWD., No.3, Eveche Street, Puducherry.
Construction of compound wall to the Sitheri anicut control room campus at Kuruvinatham Village in Bahour Commune, Puducherry.
2023_PWDC2_12384_1
03/PW/IRRN/2023-2024
Open Tender
Civil Works
Item Rate
60 days
Puducherry
Please Refer Tender Documents
3 documents required · 3 mandatory
₹525
₹30,994
22 Jun 2023
11 Apr 2023
21 Apr 2023
11 Apr 2023
20 Apr 2023
11 Apr 2023
Amount
Boring, providing and installing bored cast in situ single under reamed piles of specified diametre and length below pile cap in M-25 cement concrete, to carry a safe working load not less than specified, excluding the cost of steel reinforcement but including the cost of boring with bentonite solution and the lenghth of the pile to be embedded in pile cap etc. all complete (Length of pile for payment shall be measured upto to the bottom of pile cap) - 300 mm dia piles
Providing and laying in position specified grade of reinforced cement concrete , excluding the cost of centering , shuttering , finsishing and reinforcement - All work upto plinth level 1:1.5:3 (1cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting , propping etc and removal of form for - Lintels , beams , plinth beams , girders , bressumers and catilevers
Centering and shuttering including strutting , propping etc and removal of form for - Columns , Pillars , Piers , Abutments , Posts and Struts
Reinforced cement concrete work in walls (any thickness) , including attached pilasters, buttresses , plinth and sting courses , fillets , columns , pillars , piers , abutments , posts and struts etc. upto floor five level excluding cost of centering , shuttering , finishing and reinforcement - 1:2:4 (1 cement : 2coarse sand :4 graded stone aggregate 20mm nominal size)
Steel reinforcement for R.C.C.work including straightening , cutting , bending , placing in position and binding all complete upto plinth level - Thermo -Mechanically treated bars (ISI BRAND OF APPROVED MAKE) Fe - 415 or more
Brick work with common burnt clay F.P.S. (non modular ) bricks of class designation 7.5 in foundation and plinth in - cement mortar 1:6 (1 cement : 6 coarse sand)
12mm cement plaster of mix -1:6 ( 1 cement : 6 fine sand)
Colour washing such as green, blue or buff to give an even shade - New work (two or more coats) with a base coat of white washing with lime
Applying priming coat - with ready mixed red oxide zinc chromate primer of approved brand and manufacture on steel galvanised iron / steel works
Painting steel work with deluxe multi surface paint to give an even shade. Two or more coat applied @ 0.90 ltr / 10 sqm over an under coat of primer applied @ 0.80 ltr / 10 sqm of approved brand and manufacture
Steel work welded in built up sections / framed work , including cutting,hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required - in gratings, frames, guard bar, ladder, railings, brackets,gates and similar works
Supplying and filling with gravel (excluding rock) in trenches , plinth, sides of foundations etc . In layers not exceeding 20 cm in depth consolidating each deposited layers by ramming and watering etc .complete including all lead and lift
Surface dressing of the ground including removing vegetation and in - equalities not exceeding 15 cm deep and disposal of rubbish, lead upto 50m and lift upto 1.5m - all kinds of soil
M R H Constructions
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .