Arrangement of independent power connection especially for the digitally gallery by linking the upgrade 15 KW transfer LT meter cubical installation LT Meter Cubical Fuse porcelain 125 Amps etc and internal panel board works to the museum, etc, complete 1.LT Metering Cubical 2. Fuse porcelain 125 Amps 3.125 Amps DP Maal 4. MCCB with Box 125 Amps 5.35 Sqmm LT UG cable copper 6. Tape kaccha Rubber Misc Materials 7. Labour charges for Electrification work 8. Supervision charges for GESCOM 9. Additional security deposit for GESCOM 10. Electrical inspectorate charges for GESCOM 11.TA & QC charges 12. Registration Fee, Bond and file 13. Electrical Contractor service Charges | Sunil Kumar MC 583221,Officeofthe Conservation Assistant, Archaeological Surveyof India Near Ambedkar Circle Kamalapur-583221 |