| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹292.5 CrAccepted-Finance | ₹292.5 Cr | L1 | Accepted-Finance First Lowest |
| 2 | L2₹341.7 CrRejected-Finance | ₹341.7 Cr | L2 | Rejected-Finance Second Lowest |
| 3 | L3₹363.2 CrRejected-Finance | ₹363.2 Cr | L3 | Rejected-Finance Third Lowest |
| 4 | Not Admitted-PreQual/Technical PLOT NO 61 KESHAV NAGAR HAWA SADAK JAIPUR RAJASTHAN 302006 | JAIPUR | RAJASTHAN | 302006 | - | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
| 5 | Not Admitted-PreQual/Technical | - | - | Not Admitted-PreQual/Technical Not Complied with technical specification |
Tender Value
₹292.3 Cr
EMD Value
₹55 L
Closing Date
7 Sept 2020, 5:00 pmClosed
GENERAL MANAGER
OFFICE OF THE GENERAL MANAGER GANGA POLLUTION PREVENTION UNIT UPJN VARANASI
CONSTRUCTION OF STP INTERCETION AND DIVERSION OF DRAINS ASSOCIATED WORKS AND FIFTEEN YEARS OPERATION AND MAINTENANCE IN MIRZAPUR AND GHAZIPUR
2020_UPJNM_483752_1
1463/08-081-005/72 dt 13/06/2020
Open Tender
Civil Works - Others
720 days
MIRZAPUR GHAZIPUR
Please refer Tender documents.
3 documents required · 3 mandatory
₹21,000
GENERAL MANAGER GANGA POLLUTION PREVENTION UNIT
₹55 L
Yes
STP CAMPUS BHAGWANPUR VARANASI
15 Mar 2021
15 Jun 2020
8 Sept 2020
16 Jun 2020
7 Sept 2020
13 Jul 2020
22 Jun 2020
Amount
MIRZAPUR BID PROJECT COST
Bid Project Cost (including all taxes) for Mirzapur STP-Existing 14.00 MLD STP based on UASB technology at Pakka pokra
Bid Project Cost (including all taxes) for Mirzapur STP- Proposed 8.50 MLD STP at Pakka pokra
Bid Project Cost (including all taxes) for Mirzapur STP- Proposed 8.50 MLD STP at Bisunderpur
Bid Project Cost (including all taxes) for Mirzapur STP- Proposed 1 MLD onsite STP at Chorwa Nala based on constructed wetland technology
Bid Project Cost (including all taxes) for Mirzapur Associated Infrastructure
MIRZAPUR O&M CHARGES
O&M charges for Existing 14.00 MLD STP based on UASB technology at Pakka Pokhra for first month after Mirzapur COD
Manpower
Maintenance and Repair
Consumables
Guaranteed Energy Consumption for Existing 14.00 MLD STP based on UASB technology at Pakka Pokhra for the first month after Mirzapur COD (Value should be entered in all cell from 2.06 to 2.17, and should be greater than 0)
For flow < 7.00MLD and BOD < 100 mg/L
For flow < 7.00MLD and BOD > 100 mg/L and upto 120 mg/L
For flow < 7.00MLD and BOD > 120 mg/L and upto 140 mg/L
For flow < 7.00MLD and BOD > 140 mg/L and upto 180 mg/L
For flow > 7.00MLD and upto 11.00 MLD and BOD < 100 mg/L
For flow > 7.00MLD and upto 11.00 MLD and BOD > 100 mg/L and upto 120mg/L
For flow > 7.00MLD and upto 11.00 MLD and BOD > 120 mg/L and upto 140mg/L
For flow > 7.00MLD and upto 11.00 MLD and BOD > 140 mg/L and upto 180mg/L
For flow > 11.00MLD and upto 14.00 MLD and BOD < 100 mg/L
For flow > 11.00MLD and upto 14.00 MLD and BOD > 100 mg/L and upto 120mg/L
For flow > 11.00MLD and upto 14.00 MLD and BOD > 120mg/L and upto 140mg/L
For flow > 11.00MLD and upto 14.00 MLD and BOD > 140 mg/L and upto 180mg/L
Existing 14.00 MLD STP based on UASB technology at Pakka pokra Power Charges (= 14.00 X Units Consumed/MLD X 5475 X 8.30) = 636195
O&M charges for Proposed 8.50 MLD STP at Pakka Pokhra for first month after Mirzapur COD (including effluent pumping station-22.50MLD)
Manpower
Maintenance and Repair
Consumables
Guaranteed Energy Consumption for the Proposed 8.50 MLD STP at Pakka Pokhra for the first month after Mirzapur COD (Value should be entered in all cell from 2.24 to 2.35, and should be greater than 0) (including effluent pumping station-22.50MLD)
For flow < 4.50MLD and BOD < 130 mg/L
For flow < 4.50MLD and BOD > 130 mg/L and upto 160mg/L
For flow < 4.50MLD and BOD > 160 mg/L and upto 190mg/L
For flow < 4.50MLD and BOD > 190 mg/L and upto 250mg/L
For flow > 4.50MLD and upto 6.50 MLD and BOD < 130 mg/L
For flow > 4.50MLD and upto 6.50 MLD and BOD > 130 mg/L and upto 160mg/L
For flow > 4.50MLD and upto 6.50 MLD and BOD > 160 mg/L and upto 190mg/L
For flow > 4.50MLD and upto 6.50 MLD and BOD > 190 mg/L and upto 250mg/L
For flow > 6.50MLD and upto 8.50 MLD and BOD < 130 mg/L
For flow > 6.50MLD and upto 8.50 MLD and BOD > 130 mg/L and upto 160mg/L
For flow > 6.50MLD and upto 8.50 MLD and BOD > 160 mg/L and upto 190mg/L
For flow > 6.50MLD and upto 8.50 MLD and BOD > 190 mg/L and upto 250mg/L
Power Charges for Proposed 8.50 MLD STP at Pakka Pokhra = (8.50 x Units Consumed/MLD X 5475 x 8.30) = 386261
Land requirement (sqm) - 8.50 MLD STP at Pakka Pokhra
O&M charges for Proposed 8.50 MLD STP at Bisunderpur for first month after Mirzapur COD
Manpower
Maintenance and Repair
Consumables
Guaranteed Energy Consumption for the Proposed 8.50 MLD STP at Bisunderpur for the first month after COD (Value should be entered in all cell from 2.43 to 2.54, and should be greater than 0)
For flow < 4.50MLD and BOD < 130 mg/L
For flow < 4.50MLD and BOD > 130 mg/L and upto 160mg/L
For flow < 4.50MLD and BOD > 160 mg/L and upto 190mg/L
For flow < 4.50MLD and BOD > 190 mg/L and upto 250mg/L
For flow > 4.50MLD and upto 6.50 MLD and BOD < 130 mg/L
For flow > 4.50MLD and upto 6.50 MLD and BOD > 130 mg/L and upto 160mg/L
For flow > 4.50MLD and upto 6.50 MLD and BOD > 160 mg/L and upto 190mg/L
For flow > 4.50MLD and upto 6.50 MLD and BOD > 190 mg/L and upto 250mg/L
For flow > 6.50MLD and upto 8.50 MLD and BOD < 130 mg/L
For flow > 6.50MLD and upto 8.50 MLD and BOD > 130 mg/L and upto 160mg/L
For flow > 6.50MLD and upto 8.50 MLD and BOD > 160 mg/L and upto 190mg/L
For flow > 6.50MLD and upto 8.50 MLD and BOD > 190 mg/L and upto 250mg/L
Power Charges for Proposed 8.50 MLD STP at Bisunderpur = (8.50 x Units Consumed/MLD X 5475 x 8.30) = 386261
Land requirement (sqm) - 8.50 MLD STP at Bisunderpur
O&M charges for Proposed 1 MLD onsite treatment based on constructed wetland technology at Chorwa Nala for first month after Mirzapur COD
Manpower
Maintenance and Repair
Consumables
Guaranteed Energy Consumption for Proposed 1 MLD onsite treatment based on constructed wetland technology at Chorwa Nala for first month after Mirzapur COD = 1 MLD x Units Consumed/MLD X 5475 x 8.30) = 45443
O&M charges for Mirzapur Associated Infrastructure for first month after Mirzapur COD
Manpower
Maintenance and Repair
Mirzapur Associated Infra Guaranteed Energy Consumption for first month after Mirzapur COD (47.06 MLD capacity x Units Consumed/ MLD x 5475 x 8.30) (MPS:8.5 MLD + SPS:11 MLD + MPS:22.5 MLD + LS:5.06 MLD)
MIRZAPUR BID PRICE - TOTAL
GHAZIPUR BID PROJECT COST
Bid Project Cost (including all taxes) for 21 MLD STP in Ghazipur
Bid Project Cost (including all taxes) for Ghazipur Associated Infrastructure
GHAZIPUR O&M CHARGES
O&M charges for 21 MLD STP Ghazipur for first month after Ghazipur COD
Manpower
Maintenance and Repair
Consumables
Guaranteed Energy Consumption for 21 MLD STP in Ghazipur for the first month after Ghazipur COD (Value should be entered in all cell from 5.06 to 5.17, and should be greater than 0)
For flow < 10.50MLD and BOD < 130 mg/L
For flow < 10.50MLD and BOD > 130 mg/L and upto 160mg/L
For flow < 10.50MLD and BOD > 160 mg/L and upto 190mg/L
For flow < 10.50MLD and BOD > 190 mg/L and upto 250mg/L
For flow >10.50MLD and upto 16.00 MLD and BOD < 130 mg/L
For flow > 10.50MLD and upto 16.00 MLD and BOD > 130 mg/L and upto 160mg/L
For flow >10.50MLD and upto 16.00 MLD and BOD > 160 mg/L and upto 190mg/L
For flow >10.50MLD and upto 16.00 MLD and BOD > 190 mg/L and upto 250mg/L
For flow > 16.00MLD and upto 21.00 MLD and BOD < 130 mg/L
For flow > 16.00MLD and upto 21.00 MLD and BOD > 130 mg/L and upto 160mg/L
For flow > 16.00MLD and upto 21.00 MLD and BOD > 160 mg/L and upto 190mg/L
For flow > 16.00MLD and upto 21.00 MLD and BOD > 190 mg/L and upto 250mg/L
Ghazipur STP (21.00 MLD) Power Charges (=21.00 x Units Consumed/MLD x 5475 x 8.30) = 954293
Land requirement (sqm) - 21 MLD STP at Ghazipur
O&M charges for Ghazipur Associated Infrastructure for first month after Ghazipur COD
Manpower
Maintenance and Repair
Ghazipur Associated Infra Guaranteed Energy Consumption for first month after Ghazipur COD - (32.28 MLD capacity X Units Consumed/MLD X 5475 X8.30) (21 MLD STP + 5.84 MLD SPS1 + 5.44 MLD SPS2)
GHAZIPUR BID PRICE - TOTAL
EAST INDIA UDYOG LIMITED
HNB ENGINEERS PVT LTD
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid