Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.6 LAccepted-AOC | ₹64.6 L | L1 | Accepted-AOC FIRST |
| 2 | L2₹66.8 L+₹2.2 L (3.44%)Rejected-AOC BHUCHO | JAJAPUR | ODISHA | 755007 | ₹66.8 L+₹2.2 L (3.44%) | L2 | Rejected-AOC SECOND |
| Sl No | Description | Qty | Unit | Bhupinder Singh Contractors L1 | Rajinder Singh Contractor L2 |
|---|---|---|---|---|---|
| 1.00 | Earth work excavation in ordinary soil, exclusive of compensation of earth:-Kassi work undressed involving an average horizontal throw up to 2.0 metres and an average
vertical lift up to 0.5 metres including breaking of clods. | 149.18 | cum | 98.57 ₹14,704.67 Lowest | 99.45 ₹14,835.95 |
| 2.00 | Earth work undressed with a combined lead upto 15 metres including breaking of clods. | 4,621.82 | cum | 124 ₹5,73,105.68 Lowest | 136.22 ₹6,29,584.32 |
| 3.00 | Dressing of earth work New work or remodeling work.Unit | 6,204.46 | Sq.mtr | 1.38 ₹8,562.15 Lowest | 1.4 ₹8,686.24 |
| 4.00 | Earth work (exclusive of compensation for earth) in excavation in ordinary soil or soil containing gravel or kankar upto 40% and filling in 15 cm layers in foundation
and plinth including ramming watering and consolidating
under floors with earth brought from a distance not exceeding 30 metres | 1,589.21 | cum | 162 ₹2,57,452.02 Lowest | 178.5 ₹2,83,673.99 |
| 5.00 | Dag belling single kassi stroke minimum 7.5 cm depth | 4.27 | Km | 1,025 ₹4,376.75 Lowest | 1,026 ₹4,381.02 |
| 6.00 | Dressing bed and preparation of sub grade for lining. | 2,380.48 | Sq.mtr | 13.2 ₹31,422.36 Lowest | 13.7 ₹32,612.6 |
| 7.00 | First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth | 719.23 | cum | 6,650 ₹47,82,852.9 Lowest | 6,750 ₹48,54,775.5 |
| 8.00 | 10mm thick Cement Plaster 1:4 | 2,354.15 | Sq.mtr | 188 ₹4,42,580.2 Lowest | 204 ₹4,80,246.6 |
| 9.00 | 10mm thick cement plaster 1 : 4 on floors | 2,376.45 | Sq.mtr | 145 ₹3,44,585.25 Lowest | 157 ₹3,73,102.65 |
Tender Value
₹59.1 L
EMD Value
₹1.2 L
Closing Date
7 Mar 2026, 2:00 pmClosed
Xen Gurdaspur UBDC
Executive Engineer/ Gurdaspur Canal and Ground Water DivisioN WRD,Punjab
ESTIMATE FOR CONSTRUCTION OF WATER COURSES OF DITCH MINOR RD 16500/TR AND 16500/TF UNDER JURISDICTION OF MADHOPUR SUB DIVISION
2026_WR_160406_2
64/110A
Open Tender
Civil Works - Canal
Item Rate
90 days
PATHANKOT
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
₹1.2 L
17 Apr 2026
2 Mar 2026
7 Mar 2026
2 Mar 2026
7 Mar 2026
2 Mar 2026
Earth work excavation in ordinary soil, exclusive of compensation of earth:-Kassi work undressed involving an average horizontal throw up to 2.0 metres and an average vertical lift up to 0.5 metres including breaking of clods.
Earth work undressed with a combined lead upto 15 metres including breaking of clods.
Dressing of earth work New work or remodeling work.Unit
Earth work (exclusive of compensation for earth) in excavation in ordinary soil or soil containing gravel or kankar upto 40% and filling in 15 cm layers in foundation and plinth including ramming watering and consolidating under floors with earth brought from a distance not exceeding 30 metres
Dag belling single kassi stroke minimum 7.5 cm depth
Dressing bed and preparation of sub grade for lining.
First class burnt brick laid in cement sand mortar 1:6 in foundation and plinth
10mm thick Cement Plaster 1:4
10mm thick cement plaster 1 : 4 on floors
stage.html
html • 0.04 MB
techsummary_329172.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.37 MB
BOQ_329172.xls
BOQ • 0.35 MB
c09032026.pdf
PDF • 0.52 MB
cori16500.pdf
PDF • 0.51 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .