| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.6 LAccepted-AOC | ₹7.6 L | 1 | Accepted-AOC lowest price |
| 2 | 2₹7.8 LRejected-Finance | ₹7.8 L | 2 | Rejected-Finance highest price |
| Sl No | Description | Qty | Unit | Vemsi Associate L2 | K G CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00CONSTRUCTION | |||||
| 1.01 | Earth work excavation for foundation and depositing on bank for refilling within an initial lead of 10.00 m and an initial lift of 2.00 in hard stiff clay. Stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil and except hard rock requiring blasting including shoring, strutting, bailing water wherever necessary and all other incidental charges etc., complete as directed by departmental officers as per S.S.20B | 113 | Cum | 188 ₹21,244 | 183 ₹20,679 |
| 1.02 | Plain Cement Concrete 1:4:8 (One Part of cement, Four Part of crushed stone sand, and Eight Part of Aggregate) mix using 40mm ISS HBG metal from approved Quarry including cost and conveyance of all materials and all labour charges for mixing, laying, compacting and curing the concrete to site and other incidental charges etc., complete. as per standard specification 28 V,VI S25 | 23 | Cum | 5,200 ₹1.2 L | 5,128 ₹1.2 L |
| 1.03 | Steel shuttering with MS Sheets and MS angels including fixing in position with country wood scantlings for drain side walls including cost and conveyance of all materials and all labour charges to site and other incidental charges etc., complete. as per standard specification 86 K, 86 A | 492 | Sqm | 500 ₹2.5 L | 490 ₹2.4 L |
| 1.04 | Vibrated Plain Cement Concrete 1:2:4 (One Part of cement, Two Part of crushed stone sand, Four Part of Aggregate) mix using 20mm ISS HBG metal from approved Quarry including cost and conveyance of all materials and all labour charges for mixing, laying, compacting and curing the concrete to site and other incidental charges etc., complete. as per standard specification 28 V,VI S25 | 57 | Cum | 6,550 ₹3.7 L | 6,500 ₹3.7 L |
| 1.05 | Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two M- Sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete. | 92.25 | Sqm | 180 ₹16,605 | 159 ₹14,667.75 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
26 Feb 2026, 3:00 pmClosed
The Executive Officer, Sholavandan Town Panchayat
The Executive Officer, Sholavandan Town Panchayat
Sholavandan Town Panchayat Construction of Storm Water Drain in Ward No. 3Vadipatti Road Cross Street in Sholavandan Town Panchayat
2026_DTP_662957_1
15/2026
Open Tender
Civil Works
90 days
SHOLAVANDAN
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹10,000
11 Mar 2026
20 Feb 2026
26 Feb 2026
20 Feb 2026
26 Feb 2026
20 Feb 2026
CONSTRUCTION
Earth work excavation for foundation and depositing on bank for refilling within an initial lead of 10.00 m and an initial lift of 2.00 in hard stiff clay. Stiff black cotton soil, hard red earth, sales, murrams, gravel, stoney earth, earth mixed with small sized boulders and hard gravelly soil and except hard rock requiring blasting including shoring, strutting, bailing water wherever necessary and all other incidental charges etc., complete as directed by departmental officers as per S.S.20B
Plain Cement Concrete 1:4:8 (One Part of cement, Four Part of crushed stone sand, and Eight Part of Aggregate) mix using 40mm ISS HBG metal from approved Quarry including cost and conveyance of all materials and all labour charges for mixing, laying, compacting and curing the concrete to site and other incidental charges etc., complete. as per standard specification 28 V,VI S25
Steel shuttering with MS Sheets and MS angels including fixing in position with country wood scantlings for drain side walls including cost and conveyance of all materials and all labour charges to site and other incidental charges etc., complete. as per standard specification 86 K, 86 A
Vibrated Plain Cement Concrete 1:2:4 (One Part of cement, Two Part of crushed stone sand, Four Part of Aggregate) mix using 20mm ISS HBG metal from approved Quarry including cost and conveyance of all materials and all labour charges for mixing, laying, compacting and curing the concrete to site and other incidental charges etc., complete. as per standard specification 28 V,VI S25
Finishing the top of flooring with granothatic flooring with cement concrete 1:2:4 (one cement, two M- Sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_795873.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.19 MB
BOQ_795873.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid