Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.7 LAccepted-Finance | L1 | Accepted-Finance ACCEPTED | |
| 2 | L2₹14.8 L+₹15,300 (1.04%)Accepted-Finance | L2 | Accepted-Finance ACCEPTED | |
| 3 | L3₹17.0 L+₹2.3 L (15.6%)Accepted-Finance | L3 | Accepted-Finance ACCEPTED |
Tender Value
₹15.1 L
EMD Value
₹30,256
Closing Date
13 Oct 2020, 1:00 pmClosed
EE LPWD KLP
EE LPWD KLP
Procurement/ Manufacture, transportation, handling and stacking of Timber Scantling, Timber Reaper and Timber Planks in the store yard/work site at Kalpeni during year 2020-2021
2020_UTL_1310_1
33/NIT/KLP/2020-21
Open Tender
Civil Construction Goods
Item Rate
90 days
lakshadweep
Please refer Tender documents.
5 documents required · 5 mandatory
₹500
EE LPWD KLP UTL
₹30,256
25 Oct 2020
22 Sept 2020
14 Oct 2020
22 Sept 2020
13 Oct 2020
22 Sept 2020
Amount
Procurement/ Manufacture, transportation, handling and stacking of Timber Scandling, Timber Reeper and Timber Planks in the store yard/work site at Kalpeni as per the Direction of Engineer in Charge Karimaruthu
Timber Scantling
100x75 mm =5 m3 (2.5 mtr and above)
100x50 mm =3 m3 (2.5 mtr and above)
75x75 mm =1 m3 (2.5 mtr and above)
Timber Reeper
75x40 mm =2.50 m3 (3 mtr and above)
Timber Planks
300x40 mm =2 m3 (2.5 mtr and above)
300x25 mm =2 m3 (2.5 mtr and above)
Team Constructions
Mohammed Suneer
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .