Tender Value
₹10.6 Cr
EMD Value
₹21.1 L
Closing Date
10 Jun 2026, 5:00 pm5d left
EE, RWD, LATEHAR
EE, RWD, LATEHAR
Strengthening of Road from (i) Panchayat Barwadih, Railway 16-C Gate to Kabristan via Pahadi Mandir (L-1.400 Km.), (ii) Vill. Khura Dhardhari River Shmashan Ghaat to P.W.D. Road, D.S.P. Residence via H.O. Ravindra Ram (L-2.550 Km.), (iii) Nawadih to
2026_RWD_114682_1
RWD/LATEHAR/9/STPKG03/2023-24
Open Tender
Civil Works - Roads
450 days
EE, RWD
Please refer Tender documents.
4 documents required · 4 mandatory
₹10,000
₹21.1 L
Yes
2 Jun 2026
2 Jun 2026
12 Jun 2026
2 Jun 2026
10 Jun 2026
2 Jun 2026
2 Jun 2026 - 10 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | (i) Panchayat Barwadih, Railway 16-C Gate to Kabristan via Pahadi Mandir (L-1.400 Km.)
Clearing grass and removal of rubbish up to a distance of 30 m outside the periphery of the area as per Technical Specification Clause 201 | 0.65 | Ha | 19,760.3 | ₹12,844.2 | BI01010001010000000000000515BI0100001116 |
Compacting original ground supporting subgrade (Loosening of the ground upto a level of500 mm below the subgrade level, watered, graded and compacted in layers to meet requirement of table 300-2 for subgrade construction.) | 712.08 | M3 | 52.6 | ₹37,455.41 | BI01010001010000000000000515BI0100001117 | |
Removing all type of Hume pipes and stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works.
Upto 600mm dia | 22.5 | M | 693.7 | ₹15,608.25 | BI01010001010000000000000515BI0100001118 | |
Construction of Subgrade and Earthen Shoulders (Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2) | 2,228.22 | M3 | 131.3 | ₹2,92,565.29 | BI01010001010000000000000515BI0100001119 | |
Excavation in Soil using Hydraulic Excavator CK 90 and Tippers with disposal upto 1000 metres. (Excavation for roadwork in soil with hydraulic excavator of0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross sections, and transporting to the embankment location within all lifts and lead upto 1000m)
Including Royalty etc@ Rs. 27.48 per cum but excluding the cost of watering, rolling & compaction. | 184.34 | M3 | 62.4 | ₹11,502.82 | BI01010001010000000000000515BI0100001120 | |
Construction of Embankment with Material Deposited from Roadway Cutting (Construction of embankment with approved materials deposited at site from roadway cutting and excavation from drain and foundation of other structures graded and compacted to meet requirement of table 300-2)
Rolling with smooth wheeled roller | 460.71 | M3 | 61.48 | ₹28,324.45 | BI01010001010000000000000515BI0100001121 | |
Granular Sub-Base with Coarse Graded Material (Table:- 400- 1)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.
With Grading-I Material | 572.63 | M3 | 2,357.22 | ₹13,49,814.89 | BI01010001010000000000000515BI0100001122 | |
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per table 600-1, cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, laid with a paver with electronic sensor, compacting with 8-10 tonnes vibratory roller, finishing and curing. | 3.5 | M3 | 3,437.51 | ₹12,031.29 | BI01010001010000000000000515BI0100001123 | |
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant, dowel bars, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 | 1,042.7 | M3 | 6,270.26 | ₹65,38,000.1 | BI01010001010000000000000515BI0100001124 | |
Kilometre Stone (Reinforced cement concrete M15grade kilometre stone of standard design as per IRC:8-1980, fixing in position including painting and printing etc) Ordinary kilometre stone (precast) | 2 | nos. | 1,740.9 | ₹3,481.8 | BI01010001010000000000000515BI0100001125 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.26 MB
DOUBLEF2BIDDOCUMENT.pdf
Tender Documents • 0.81 MB
BOQ_155061.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid