Tender Value
₹32.3 Cr
EMD Value
₹64.6 L
Closing Date
7 Sept 2026, 3:00 pm
Yes (up to 3 members)
No
Two Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
90 days
Expenditure
Capital (Works)
TENDER
14 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where, V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet. Note- No Technical and Financial credentials are required for tenders having advertised value up to Rs.50 lakh
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i)Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii)Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii)One similar work costing not less than the amount equal to 60% of advertised value of the tender.
Defination of Similar Work :- Any Civil Engineering work involving building construction work.
4 conditions · 1 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
All the bidders/ tenderers should ensure that they are GST compliant and their quoted tax structure/ rates are as per GST Law
Construction of Earthwork, Major Bridges, Minor Bridges, Track work and associated works, Retaining Wall, Side Drains, Station Building, Platform, Fencing and Road Work in connection with Additional Hotgi Bye Pass Line (5.85 km) in Solapur Division of Central Railway.
DYCE-C-SUR-HG-01-2026~CR
DYCE-C-SUR-HG-01-2026
Open
Works - General
24 Months
Solapur, Maharashtra
₹0
₹64.6 L
7 Aug 2026
7 Aug 2026
24 Aug 2026
250 items across 7 schedules · ₹24,45,02,742.07 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| Earthwork in cutting in formation, trolley refuges, side drains, level crossing approaches, platforms, catch water drains, diversion of nallah & finishing to required dimension and slopes to obtain a neat appearance to standard profile inclusive all labour, materials, plant & machinery, leading all cut spoils either to make spoil dumps or for filling in embankment with leads within 2 km on either side of edge the cutting(s) including all lifts, ascent, descent, loading, unloading, bailing pumping out water, if required, clearance of site and all other works incidental thereto for completing the work as RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest updated correction slips and to the satisfaction of Engineer-in-Charge. Note: (i) All usable earth arising from cut spoils shall be into bank formation and Unusable spoils shall be dumped / stacked away from of embankment. (ii) All hard rock /and boulders not fit for filling will be stacked the contractor and will be property of Railways. (iii)Cut trees shall be property Railways and to be deposited in the railway godown unless specified otherwise in Conditions of Contract. | of of & per the led toe by the of the | — | — | — | |
| 1 | In all conditions and classifications of except rock | soil cum | 16586.37 | 98.7 | 16,37,074.72 |
| 2 | Soft rock not requiring blasting | cum | 14846.36 | 238.57 | 35,41,896.11 |
| 3 | In hard rock with hammer / chisel pavement breaker etc. where blasting not permitted due to special circumstances and if specifically ordered in writing including drilling and all incidental works thereto. | / cum is | 7143.00 | 952.04 | 68,00,421.72 |
| 4 | Manufacturing of blanketing material wet mixing of naturally available suitable soil including additional blending with naturally available or manufactured material as required to achieve specified gradation, in designed proportion in mill or wet mix plant to have uniform gradation including all incidental transportation, laying over finished formation in uniform layer(s) with motor grader, compaction with suitable vibratory roller to specified density and finishing correct profile, complete as per RDSO Specification No. RDSO/2020/GE: IRS-0004 with latest correction slips. | by cum Pug to | 8363.86 | 859.69 | 71,90,326.8 |
| Felling trees of girth (measured at a height of 1.0 m above ground level) including leading and stacking of material within 100m. Note : 1. When stumps are grubbed up in addition, the rates shall be doubled for trees cut and grubbed 2. Payment grubbing shall only be made where specially ordered. 3. Grubbing shall ordered only where it is essential remove the stumps, including the roots, per specification. 4. Grubbing shall include removal of roots of trees and saplings to depth of 60cm below ground level or cm below formation level or 15 cm below sub grade level, whichever is lower. | for be to as a 30 | — | — | — | |
| 5 | Girth over 30 cm and up to 60 cm | Each | 122.50 | 365.26 | 44,744.35 |
| 6 | Girth over 60 cm and up to 1.5m | Each | 52.50 | 1,010.68 | 53,060.7 |
| 7 | Providing and laying Plain Cement Concrete 1:3:6 with graded stone aggregate of 40mm nominal size, foundation and floors, retaining walls b r i d g e s including mechanical mixing, vibrating, pumping and bailing out water where ever required with all materials labour complete but excluding the cost cement and shuttering as per drawings and technical specifications as directed Engineer. | cum in of and of by | 264.64 | 2,693.74 | 7,12,871.35 |
| Schedule total | ₹1,99,80,395.75 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
TenderDocumentHGBypassline.pdf Tender Document
ATTACHMENT
TenderDocumentHGBypassline.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].