Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.1 CrAccepted-AOC SP 52 MPPGCL COLONY BIRSINGHPUR DISTT UMARIA 484 552 M P | BIRSINGHPUR | UMARIA | MADHYA PRADESH | 484552 | ₹3.1 Cr Quoted ₹3.4 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2Rejected-Finance PLOT NO 41 SECTOR D BAGRODA INDUSTRIAL AREA BHOPAL MP 462026 | BHOPAL | MADHYA PRADESH | 462026 | - | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | K K POWER CONSTRUCTION L1 | UNITED ENGINEERING L2 |
|---|---|---|---|---|---|
| 1.00CLEANING OF BOILER | |||||
| 2.00 | COMPLETE EXTERNAL CLEANING OF BOILER FROM TOP TO BOTTOM | 2 | Nos. | 4,20,000 ₹5.0 L | 4,79,800 ₹5.7 L |
| 3.00 | INTERNAL CLEANING OF BOILER IN IIND PASS | 2 | Nos. | 1,32,000 ₹1.6 L | 1,56,000 ₹1.8 L |
| 4.00 | CLEANING OF ASH FROM ECONOMISER HOPPER WITH CONNECTING DUCTS | 2 | Nos. | 78,000 ₹92,040 | 94,700 ₹1.1 L |
| 5.00 | CLEANING OF PENT HOUSE, CAT HOUSE, DEAD CHAMBER | 2 | Nos. | 5,10,000 ₹6.0 L | 5,91,920 ₹7.0 L |
| 6.00 | BOTTOM ASH HOPPER CLEANING | 2 | Nos. | 78,000 ₹92,040 | 93,760 ₹1.1 L |
| 7.00PREPARATION OF SCAFFOLDING | |||||
| 8.00 | PREPARATION OF SCAFFOLDING ABOVE ECONOMISER HOPPER FOR INSPECTION OF ECONOMISER COILS | 2 | Nos. | 1,32,000 ₹1.6 L | 1,57,200 ₹1.9 L |
| 9.00 | PREPARATION OF QUICK ERECT SCAFFOLDING SYSTEM (CUP-LOCK SYSTEM) IN BOILER FURNACE (FROM TOP TO BOTTOM) along with providing cup-lock system by firm | 2 | Nos. | 33,00,000 ₹38.9 L | 38,56,000 ₹45.5 L |
| 10.00 | PREPARATION OF SCAFFOLDING IN BOTTOM ASH HOPPER | 2 | Nos. | 1,32,000 ₹1.6 L | 1,57,000 ₹1.9 L |
Tender Value
₹3.1 Cr
EMD Value
₹3.1 L
Closing Date
8 Jul 2022, 3:00 pmClosed
SE(PNW) SGTPS
SE(PNW) SGTPS
Work Contract for Annual/Capital Overhauling of Boiler Pressure Parts of Unit No. 1 and 2 of PH-I at SGTPS, MPPGCL, Birsinghpur
2022_MPPGC_192853_1
192853
Open Tender
Electrical and Maintenance Works
75 days
SGTPS MPPGCL BIRSINGHPUR UMARIA
As per ENIT PQR CLAUSE 5 B
17 documents required · 17 mandatory
₹5,000
Yes
₹3.1 L
Yes
12 Feb 2026
25 Apr 2022
12 Jul 2022
25 Apr 2022
8 Jul 2022
25 Apr 2022
CLEANING OF BOILER
COMPLETE EXTERNAL CLEANING OF BOILER FROM TOP TO BOTTOM
INTERNAL CLEANING OF BOILER IN IIND PASS
CLEANING OF ASH FROM ECONOMISER HOPPER WITH CONNECTING DUCTS
CLEANING OF PENT HOUSE, CAT HOUSE, DEAD CHAMBER
BOTTOM ASH HOPPER CLEANING
PREPARATION OF SCAFFOLDING
PREPARATION OF SCAFFOLDING ABOVE ECONOMISER HOPPER FOR INSPECTION OF ECONOMISER COILS
PREPARATION OF QUICK ERECT SCAFFOLDING SYSTEM (CUP-LOCK SYSTEM) IN BOILER FURNACE (FROM TOP TO BOTTOM) along with providing cup-lock system by firm
PREPARATION OF SCAFFOLDING IN BOTTOM ASH HOPPER
INSPECTION
INSPECTION OF COMPLTE BOILER PRESSURE PARTS (IST & IIND PASS)
INSPECTION & REPAIR OF ALL DOORS ,WINDOWS AND PEEP HOLES IN BOILER
HEADER INSPECTION & INSPACTION OF SPRAY NOZZLE ATTEMPERATOR
INTERNAL INSPECTION & CLEANING OF BOILER DRUM
CLEANING AND REPAIR OF WIND BOX
WITH STEEL
WITHOUT STEEL
REPLACEMENT OF WIND BOX ROOF
WITH STEEL
WITHOUT STEEL
DYE PENETRATION TEST (DP TEST) WITH KIT
HYDRO JET CLEANING OF COMPLETE BOILER PRESSURE PARTS AND AIR - PREHEATER IN THE BOILER
PLATEN SUPERHEATER COILS.
PENDENT RE-HEATER COILS. (1st & 2nd Stage)
FINAL SUPERHEATER
WATER WALL ( FRONT, REAR, LEFT & RIGHT, ROOF)
ASSISTANCE IN RADIOGRAPHY
RECTIFICATION, REPLACEMENT AND REFIXING OF CASSETTE BAFFLES IN VARIOUS AREAS OF BOILER TUBES.
FABRICATION & FIXING OF EROSION SHIELD
FIXING OF EROSION SHIELD
REMOVAL OF EROSION SHIELD
PREPARATION OF BOILER TUBE SURFACE FOR TUBE THICKNESS SURVEY/OXIDE SCALE MEASUREMENT/STRESS RELIEVING
WELDING OF HP JOINTS OF BOILER TUBES
WATER WALL TUBES-SCREEN TUBES, HANGER TUBES, REAR ARCH TUBES ETC.
PRIMARY SUPERHEATER TUBES
PLATEN SUPERHEATER TUBES
FINAL SUPERHEATER TUBES
HORIZONTAL REHEATER
PENDANT REHEATER
ECONOMIZER TUBES
SLING
RISER
BLEED
HYDRASTEP
INSTRUMENT PIPINGS
WELDING OF FINS
ECONOMISER
SLING
REHEATER
DRUM VENT
WELDING & REPLACEMENT OF DRAIN & VENTS JOINTS
WELDING & REPLACEMENT OF TRACING LINE / SAMPLING LINE
REPLACEMENT OF COILS( HORIZONTAL RE-HEATER)
PAD WELDING OF ERODED TUBES OF VARIOUS SIZE
PAD WELDING OF BOILER TUBES AT VARIOUS LOCATIONS ( SIZE 50MM X 50MM)
PAD WELDING OF BOILER TUBES AT VARIOUS LOCATIONS ( SIZE 50MM X 100MM)
PAD WELDING OF BOILER TUBES AT VARIOUS LOCATIONS ( SIZE 50MM X 300MM)
ALIGNMENT OF COILS/ TUBES / BLOWERS
ALIGNMENT OF COILS OF SH DIVISIONAL PANEL/FINAL
ALIGNMENT OF COILS OF PLATEN SUPERHEATERS
ALIGNMENT OF COIL OF ECONOMISER
ALIGNMENT OF COIL OF LTSH (UPPER / LOWER) / PRIMARY SH
ALIGNMENT OF REHEATER COIL (HORIZONTAL / PENDENT)
ASSISTANCE IN HYDRAULIC TEST OF BOILER PRESSURE PART & PREPARATION FOR BOILER LIGHT UP
APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GR.A+GR.C)
BURNER MOUTH
PENT HOUSE, DOOR, WINDOW MANHOLE & PEEPHOLE, ETC
DEAD CHAMBER & SCREEN VALVE
COOLING PIPE OF SEAL PLATE (BOTTOM ASH HOPPER)
OTHER AREAS (LIKE HOPPER HEADER ETC.)
REMOVAL / BREAKING OF DAMAGED REFRACTORY & TRANSPORTATION
APPLICATION OF REFRACTORY AT VARIOUS LOCATIONS OF BOILER (GR.A+GR.C)
GLAND PACKING OF HP VALVES
UPTO 25 MM
25 MM TO 50 MM
50MM TO 100 MM
100 MM TO 200 MM
COMPLETE SERVICING OF VALVES (EXCLUDING ACTUATOR):
UPTO 25 MM
25 MM TO 50 MM
50 MM TO 100 MM
100 MM TO 200 MM
COMPLETE SERVICING OF VALVES (EXCLUDING ACTUATOR):
UPTO 25 MM
25 MM TO 50 MM
50 MM TO 100 MM
100 MM And Above
SERVICING OF MAIN STEAM STOP VALVE
SERVICING OF VALVE/CONTROL VALVE OF FEED REGULATING STATION IN-SITU
COMPLETE SERVICING OF SPRING LOADED SAFETY VALVES (SV)
BOILER DRUM SV
MAIN STEAM LINES SV
CRH LINES SV
HRH LINES SV
BAS LINE SV
PREPARATION / FABRICATION OF HP TUBE BENDS
REPAIR OF PENT HOUSE OF BOILER
REPAIR OF PENT HOUSE BY PATCHING (WITHOUT STEEL)
DISMANTELING OF STEEL STRUCTURES/INSTALLATION OF NEW STEEL STRUCTURES (WITH STEEL)
REPAIRING SEALING DEAD CHAMBER
BUCKSTAYS
DIAMOND TYPE LOCKS
ROCKERS
REPAIRING OF ECONOMISER HOPPERS & CONNECTION JOINT DUCTING & MAKING / STREGNTHEN OF THEIR PLATEFORM
REPAIRING OF ECONOMIZER CASING
REPAIRING OF BOTTOM ASH HOPPER LINER & SEAL TROUGH INCLUDING FIXING OF DIPPER PLATE
REPAIRING OF FURNACE ZONE & REST OF THE AREAS
WITH STEEL
WITHOUT STEEL
REPAIRING OF SECOND PASS CASING
WITH STEEL
WITHOUT STEEL
DISMNETLING, INSTALLATION, FEBRICATION OF STRUTURE & MISC. WORKS I.E. CANOPY, BROKEN STAIR/RAILING/DRAIN COVERING ETC.
REPLACEMENT / STRENGTHENING OF BAFFLE PLATE BETWEEN PRIMARY SUPER HEATER & HORIZONTAL RE-HEATER
WITHOUT STEEL
REPAIRING/SEALING OF CAT HOUSE
INSTALLATION OF MITP
SERVICING, CLEANING & REPAIRING OF SAMPLING LINE COOLERS
SERVICING & REPAIRING OF HANGERS & SUPPORTS
REPAIRING OF RE-HEATER & SUPER HEATER AERO DYNAMIC DAMPER INCLUDING TOP / BOTTOM & NEAR BY AREAS
DISPOSAL OF RUBBISH THERMAL INSULATION
Insulation Work
WITHOUT STEEL
REPAIRING/SEALING OF CAT HOUSE
INSTALLATION OF MITP
SERVICING, CLEANING & REPAIRING OF SAMPLING LINE COOLERS
SERVICING & REPAIRING OF HANGERS & SUPPORTS
REPAIRING OF RE-HEATER & SUPER HEATER AERO DYNAMIC DAMPER INCLUDING TOP / BOTTOM & NEAR BY AREAS
UNITED ENGINEERING
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx