| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 CrAccepted-AOC | ₹9.7 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹9.8 Cr+₹7.3 L (0.75%)Rejected-AOC | ₹9.8 Cr+₹7.3 L (0.75%) | L2 | Rejected-AOC L2 |
| 3 | Rejected-Technical | - | - | Rejected-Technical Documents incomplete |
| 4 | Rejected-Technical | - | - | Rejected-Technical Documents incomplete |
| 5 | Rejected-Technical GANDHI NAGAR DISTRICT MAHOBA UTTAR PRADESH | MAHOBA | UTTAR PRADESH | 210421 | - | - | Rejected-Technical Documents incomplete |
Tender Value
₹11.4 Cr
EMD Value
₹22.8 L
Closing Date
22 Jan 2019, 5:00 pmClosed
SE ICC MAHOBA
Office of the SE ICC, BAJARIYA MAHOBA
KACCHA WORK AND PUCCA WORK OF KHANDEH DY FROM KM 0.00 TO 20.400 AT ARJUN SAHAYAK PARIYOJNA (Lot 3)
2019_UPIDC_294409_3
06/SE/2018-19
Open Tender
Civil Works
Item Rate
180 days
MAHOBA
As per NIT and Tender Document
2 documents required · 2 mandatory
₹2,354
EE IRRIGATION CONSTRUCTION DIVISION
₹22.8 L
24 May 2021
15 Jan 2019
23 Jan 2019
15 Jan 2019
22 Jan 2019
15 Jan 2019
Amount
The quantities given here under are tentative. They can vary on either side upto any extant,the contractor shall have no claim on account of changes and shall be paid of the quantities as physically met at site reach of work for complete work.
E/W in filling in MKR and Kankar mixed soil with lead up to 1.0 km including mechanical compaction, watering, leveling & dressing with required for proper completion of work etc including all tax like Income tax, Labour cess etc but excluding G.S.T.
E/W in cutting in MKR and Kankar mixed soil with lead up to 30 mtr and all lift including levelling, dressing, and manual compaction, with required for proper completion of work etc including all tax like Income tax, Labour cess etc but excluding G.S.T.
E/w excavation in foundation of MKR mixed soil including initial lead and lift etc. all complete. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Supply and laying of coarse sand in foundation/floor including all cost of material labour T&P etc . All complete. including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying C.C. work 1:3:6 with cement course sand and stone grit 25 to 50 mm including all cost of material, labour, T&P and proper completion of work.including all tax like Income tax, Labour cess etc but excluding G.S.T.
R.C.R. Stone masonry with 1:4 cement course sand including all cost of material, labour: T&P and proper completion of work.including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying C.C. work 1:1.5:3 with cement, course sand and stone blast including all cost of material, labour, T&P and proper completion of work including all tax like Income tax, Labour cess etc but excluding G.S.T.
Grouted Stone Pitching in 1:4 CM including all cost of material, labour, T&P and proper completion of work including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying C.C. work 1:2:4 for copping work with cement course sand and stone grit 10 to 20 mm including all cost of material, labour, T&P and proper completion of work including all tax like Income tax, Labour cess etc but excluding G.S.T.
Supply & Laying 1000 mm dia R C C hume pipe including all cost of loading, unloading, carriage , all material ,collor joint with cement ,jute ,labour ,etc including all tax like Income tax, Labour cess etc including all tax like Income tax, Labour cess etc but excluding G.S.T.
Centering and Shuttering of C.C. Work including all material, labour T&P etc. all complete including all tax like Income tax, Labour cess etc but excluding G.S.T.
Raised Struck Cement pointing in 1:2 cement mortor with coarse sand including all material, labour, T&P etc. complete including all tax like Income tax, Labour cess etc but excluding G.S.T.
Steel reinforcement for R.C.C. work including cutting, bending , binding with G.I. wire and placing in position with cost of steel reinforcement including all tax like Income tax, Labour cess etc but excluding G.S.T.
Laying and fixing joint filler bond 20mm including cost of sealing compound labour, T&P etc required for proper completion of work including all tax like Income tax, Labour cess etc but excluding G.S.T.
Providing & Fixing drainage spout pipe of G.I. 100 mm dia including cost of labour T&P etc required for proper completion of work including all tax like Income tax, Labour cess etc but excluding G.S.T.
Providing & Fixing wheel guard including cost of labour T&P etc required for proper completion of work including all tax like Income tax, Labour cess etc but excluding G.S.T.
Dry stone pitching with all cost of labour material T&P etc. required for completion of work including all tax like Income tax, Labour cess etc but excluding G.S.T.
Earth Work in Back Filling with all cost of labour T&P etc all complete including all tax like Income tax, Labour cess etc but excluding G.S.T.
Construction Network India
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .