| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAdmitted-Finance D NO 271D3 5 ANDAL PLOT NO 30 N0 76 DHARANI SQUARE PERAMANUR VILLAGE MARAMALI NAGAR CHENGALPATTU KANCHIPURAM 603 209 | CHENGALPATTU | KANCHIPURAM | TAMIL NADU | 603209 | ₹1.6 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MK DHANALAKSHMI ENGINEERING PRIVATE LIMITED L1 |
|---|---|---|---|---|
| 1.00 | Labour charges for clearing light jungle including hire charges for T&Ps all labour, lead, lift, etc., complete. | 7,400 | sqm | 5.5 ₹40,700 Lowest |
| 2.00 | Conducting check survey, pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead, lift etc., complete. | 3 | Loc | 2,519.4 ₹7,558.2 Lowest |
| 3.00 | Earth work excavation in all type of soil with an initial lead of 10m and all lift etc., complete for foundation. In Hard gravelly soil | 627 | cum | 137.8 ₹86,400.6 Lowest |
| 4.00 | Earth work excavation in all type of soil with an initial lead of 10 m and all lift etc., complete for foundation In soft distengrated rock not requiring blasting | 157 | cum | 205.4 ₹32,247.8 Lowest |
| 5.00 | Earth work excavation in all type of soil with an initial lead of 10 m and all lift etc., complete for foundation In medium rock and dense medium rock not requiring blasting | 105 | cum | 361.4 ₹37,947 Lowest |
| 6.00 | Earthwork excavtion in hard rock measured in solid including blasting with an initial lead of 10 m and all lift etc., complete for foundation. | 105 | cum | 594 ₹62,370 Lowest |
| 7.00 | Removing hard rock by wedging, chisselling and trimming to proper shape where blasting is prohibited with an initial lead of 10 m and all lift etc., complete for foundation. | 53 | cum | 1,190 ₹63,070 Lowest |
| 8.00 | Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour, fuel, oil, transport,T&P etc., complete. | 48 | hrs. | 455 ₹21,840 Lowest |
| 9.00 | Providing shoring and shuttering during excavation and concreting works using country wood planks and scantlings including cost of all materials ,labour charges, lead and lift etc., complete as directed by the Engineer incharge at site. | 270 | Sqm. | 492 ₹1,32,840 Lowest |
| 10.00 | Fixing of stub & cleat and Supply of Templates at site for KCR tower, assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete. | 3 | Loc | 30,000 ₹90,000 Lowest |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
5 Apr 2023, 2:30 pmClosed
CE/TP-I/CNI
/o ChiefEngineer/TransmissionProjects -I/Chennai, 3rdFloor,230KVGISSubstationbuildingA-10,GuindyIndustrialEstate,Guindy, Chennai-32.
EWE, stub setting, concreting, Supply, Transport and Erection of towers from Locn No. 5A to 6A with line fittings for deviating the ongoing 110 KV SC line on DC tower from existing Thalaivasal 110/22 KV SS to the proposed Thalaivasal Railway Tra
2023_EB_296965_1
TP1-138/2022-23
Open Tender
Civil Works
Works
120 days
THALAIVASAL
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹1.2 L
Yes
21 Apr 2023
23 Mar 2023
6 Apr 2023
23 Mar 2023
5 Apr 2023
23 Mar 2023
Amount
Labour charges for clearing light jungle including hire charges for T&Ps all labour, lead, lift, etc., complete.
Conducting check survey, pit marking for tower foundation as per the approved profile including cost of all T & Ps, transport, labour, lead, lift etc., complete.
Earth work excavation in all type of soil with an initial lead of 10m and all lift etc., complete for foundation. In Hard gravelly soil
Earth work excavation in all type of soil with an initial lead of 10 m and all lift etc., complete for foundation In soft distengrated rock not requiring blasting
Earth work excavation in all type of soil with an initial lead of 10 m and all lift etc., complete for foundation In medium rock and dense medium rock not requiring blasting
Earthwork excavtion in hard rock measured in solid including blasting with an initial lead of 10 m and all lift etc., complete for foundation.
Removing hard rock by wedging, chisselling and trimming to proper shape where blasting is prohibited with an initial lead of 10 m and all lift etc., complete for foundation.
Dewatering charges during excavation and concreting with 3/5 HP Diesal motor with Pump including hire charges, labour, fuel, oil, transport,T&P etc., complete.
Providing shoring and shuttering during excavation and concreting works using country wood planks and scantlings including cost of all materials ,labour charges, lead and lift etc., complete as directed by the Engineer incharge at site.
Fixing of stub & cleat and Supply of Templates at site for KCR tower, assembling at site and shifting the template from loc to loc including cost of all materials,fabrication charges, labour, lead, lift etc., complete.
PCC 1:3:6 using 20mm metal for tower foundation without formwork including cost of cement, all materials , labour, lead, lift, curing ,consolidation using vibrators, hire charges for T&P etc complete.
PCC 1:2:4 using 12 to 20mm metal for tower foundation with form work including cost of cement, all materials , labour, lead, lift, curing ,consolidation using vibrators, hire charges for T&P etc complete.cost of cement all materials labour etc., complete. (for frustum & Chimney.)
PCC 1:2:4 using 12 to 20mm HB Stone for Revetment foundation without form work including cost of cement, all materials , labour, lead, lift, curing ,consolidation using vibrators, hire charges for T&P etc complete.
PCC 1:2:4 using 12 to 20mm HB Stone for Revetment Wall with form work including cost of cement, all materials , labour, lead, lift, curing ,consolidation using vibrators, hire charges for T&P etc complete.
RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal with formwork For Road concrete including laying surface vibrator, finishing the road surface using power trowel to get smooth top finish including cost of all materials, labour lead, litf, etc., complete. For Road work with surface vibrator
RCC 1:1.5:3 using 12 to 20mm (machine crushed) metal with formwork For culvert wall including laying surface vibrator, finishing the road surface using power trowel to get smooth top finish including cost of all materials, labour lead, litf, etc., complete. For Culvert wall
Providing expansion joint for road concrete as per specification in both direction using prevalid aspheltics pad 20 mm thick to full width and depth of 150mm thick plastering with CM 1:3, 20 mm thick including cost of cement, all materials, labour, curing, all leads, and lifts, etc., complete.as per standard specification.
Brick work in CM 1:5 using II class chamber burnt bricks for basement & superstructure including cost of all materials, all labour, lead, lift, curing, etc., complete.
Supplying of GI / MS angles of various sizes to be fixed in the cable duct to the required length including cost of all materials, labour,lead, lift, galvanisation, etc., complete.
Providing precast slab in RCC 1:1 1/2:3 using 12 to 20mm HBG metal with form work cable duct with cover slab including cost of all materials, lead, lift etc., but excluding cost of steel reinforcement.
Providing steel reinforcement MS/ RTs rod including cost of binding wire, labour charges for cutting, bending, tying, straightening fixing and placing in position including cost of all materials, lead, ift etc., complete.
Transporting and fixing of RCC cover slab from curing tank to working spot including cost of labour, lead, lift etc., complete.
Refilling with the excavated earth for KCR type tower (WET) other than sand including watering, consolidation in 150mm layers and forming platform with excess earth in the leg of the tower etc complete.
Providing Pipe type earthing to towers including all materials G.I pipe 3 m length required length of Earth wire and welded with washer at end connecting with Tower leg and all lead, lift etc., complete.As directed by the Engineer at site.
Removal of surplus earth in a low lying area to a average distance of 200m by head load as directed by the Engineer at site.
Labour charges for Erection of various tower parts etc as per drawing including sorting out at site , erection, tightening , punching , final checking, providing holes wherever necessary and final checking etc., complete including cost of all labour charges etc., complete. (Normal Tower Parts)
PCC 1:2:4 using 20 mm metal for muffing coping concrete with form work including cost of cement, all materials , labour, lead, lift, curing ,consolidation using vibrators, hire charges for T&P etc complete.
Plastering with CM 1:3,12 mm thick for muffing coping concrete including cost of cement, all materials , labour, lead, lift, curing ,consolidation using vibrators, hire charges for T&P etc complete.
Providing full welding of all bolts and nuts in the erected towers from ground level to the cross arm bottom level in the tower including painting of bolts and nuts with two coats of best quality of cold galvanised paint having atleast 90% zinc content and approved by the Engineer at site including cost of paint and all other materials, hire charges for diesel generator and welding transformer, all labour, transport charges etc complete.
Supply, fabrication and fixing of name board with 18 gauge plate including cost of materials, labour for writing name of the line, etc., complete.
Painting with two coats of anticorrosive paint over tower leg at a height of 45 cm including all cost of materials, labour, lead, lift, etc., complete.
Supplying and fixing at anodized aluminium door using 101.60x44.45x2.10 mm @1.608 kg/m box section for outer frame. 53.70x44.45x2.30 @ 1.238 kg/m door vertical and top 83.50x44.45x2.4mm box section for bottom panels with 9mm thick regular grade pre laminated particle board & top panel with 5.5mm thick clear glass including cost of alum. Clips rubber beedings alum. Fixtures such as tower bolt, pivot brass mortice lock handle,with hydralick Door closer etc. of approved quality including cost of all materials, labour, leads, lift etc. complete (1.00mx2.20msize single leaf)
Supplying and fixing in position aluminium partition partly glazed & partly paneled above 12mm thick both side prelaminated boards [ MDF exterior grade] and 5mm thick machine frosted float glass 9modi, saint gobine or Equivalent0 using aluminium box section of not less than 63x38.4x2mm x 1.174kg/m for vertical @ 955mm c/c approx and horizantals[4Nos] including cost of all materials, labour, lead, liftT&P etc. complete.
Supply and installation of Anutone (or) Euivalent Brand of Acoustical False Ceiling of subtex nubby, square edge, glass fibre core fully encapsulated ceiling tile of size 595 x 595 x 15mm having volume density 120 Kgs / m3, weight 1.8 / 2.4 / 3 kg / m2 which is suspended by using 0.3mm thick skelet trelis T15 metal grid system. Skelet trelis T15 metal grid system of 600 x 600mm module includes skelet WA15 W30 wall angle with unequal flanges of 15 / 19mm, length 3000mm, fixed along the perimeter of walls with the help of nylon sleeves and suitable fasteners at 300mm centers. Then suspend the skelet MT15 W36 MainT with flange width 15mm, height 32mm and length 3600mm, from the soffit slab with help of soffit cleat and wire rod with leveling spring clip at 1200mm centres. Skelet CT15 W12 CrossT with flange width 15mm, height 26mm and length 1200mm is interlocked into the pre-cut slots in the Main T15 at 600mm centers in the perpendicular direction to the Main T15. Finally, the skelet CT15W06 CrossT with flange width 15mm, height 26mm and length 600mm are interlocked into the precut slots in the CT15W12 CrossT in direction parallel to the Main T15 to result in 600 x 600mm module. The subtex nubby square edge of size 595 x 595 x 15mm shall be placed into the grid size of 600 x 600mm. Ensure arrow marks behind the tiles are oriented in one direction to achieve uniform shade. The systems to achieve noise reduction coefficient not less than 0.9 NRC, so as to have an neat appearance as directed by the department offices. The cost includes, cost of material, cost of labour, scaffolding, transportation, conveyance, etc. complying to standard specication.
Supplying and fixing the name/ designation stickers in doors identifying the rooms including cost of material, labour, etc., complete.
Providing locking arrangements with 6 lever Godrej lock with 3 keys including cost of all materials, labour, lead, lift, etc., complete.
Supply and run of 4 of 4 sq.mm (56/0.3) PVC insulated multi strand unsheathed copper conductor of 1100 V Grade in suitable PVC rigid pipe on wall and ceiling with continuous earth wire connection of 14 SWG TC wire with painting of suitable colour.
Supply and fixing of 24W LED 4000K 2 x 2 Square Type Recessed Fitting LED of Higher End Philips / Havells / Equivalent with complete with louvers cover complete with conduit pipe suspension, with PVC unsheathed copper leads from the terminals
Supplying and fixing of split Air Conditioner (3 phase -2 Ton capacity) of approved make5 Star Rated Inverter (Carrier / Voltas / O General/ Equivalent) with all accessories including stabilizer( V guard) with reputed make including cost of all materials, leads, lift, fixing charges, etc., complete as per standared specification complete.
Supply and fixing of 32 Amps DP plug and socket in sheet enclosure with 32 A DP MCB in flush with wall with earth connection (For AC plug) [Legrand (MDS) / Hager (L&T) make]. (SD 134-B)
Supplying and fixing of RCCB safe trip of appd LEGRAND, ISI make, 25amps with suitable box including cost of all materials labour, lead, lift, etc., complete as per standard specification.
Supplying and laying 25 mm dia 10 kg PVC pipe of approved quality for AC unit water drain pipe including cost of all materials, lead, lift, labour charge, etc., complete.
Supplying and fixing 5/8" copper tube for connecting AC panel to AC out door unit including cost of all materials, lead, lift, labour charge, etc., complete.
Fabrication, galvanisation and supply of standard MS towers part as per department approved drawing/design including stacking of tower parts, transporting of tower parts to site including all taxes and duties, fright charges etc, complete. The raw materials standard should be as per IS 2062 and for galvanishing as per IS 2633 and 6745 (Latest code), The governing standards for towers should be as per the specified IS codes directed by Depertmental engineer.(The contracter need to arange for inspection of towers at purachase factory at his own cost).
Supplying, Transportation from source to site , fabrication, galvanising of standard Bolts and nuts of various sizes and various lengths as per department approved drawing including all taxes and duties, lead, lift and head load, freight charges etc., the raw material standard should be as per IS 2633 and 6745 and as per specification as per IS code directed by department engineer at site.
Supply, transport and fixing of Single Tension fittings for Panther as per design drawing and specifications.
Supply, transport and fixing of SB damber for Panther as per design drawing and specifications.
Supply, transport and fixing of Single Suspension fittings for Panther as per design drawing and specifications.
Supply, transport and fixing of Aluminium Earth bond as per design drawing and specifications
Supply, transport and fixing of Single Tension fittings for Earthwire as per design drawing and specifications.
Supply, transport and fixing of Number plate in the tower leg with all lead & lift ,etc., complete
Supply, transport and fixing of Phase plate in the tower leg with all lead & lift ,etc., complete
Supply, transport and fixing of Danger board in the tower leg with all lead & lift ,etc., complete
GST for bidders within TamilNadu
GST for bidders outside TamilNadu (IGST)
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .