Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 LAccepted-AOC | ₹8.3 L | L1 | Accepted-AOC L1 |
| 2 | L2₹9.5 L+₹1.3 L (15.2%)Rejected-Finance | ₹9.5 L+₹1.3 L (15.2%) | L2 | Rejected-Finance L2 |
| 3 | L3₹9.7 L+₹1.4 L (16.5%)Rejected-Finance | ₹9.7 L+₹1.4 L (16.5%) | L3 | Rejected-Finance L3 |
| 4 | Rejected-Technical | - | - | Rejected-Technical all requried not complete |
Tender Value
₹9.8 L
EMD Value
₹29,250
Closing Date
24 Jul 2026, 3:00 pmClosed
CE
Ghaziabad Nagar Nigam
City zone ke antargat kanwar ke dirastigat police choki se MMG hospital ki taraf, delhi gate ki taraf baricating ka karye
2026_DOLBU_1170833_2
128/Nirman/2026-27 Date 17-07-2026
Open Tender
Civil Works
Percentage
Ghaziabad
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,416
Yes
₹29,250
Yes
7 Aug 2026
18 Jul 2026
24 Jul 2026
18 Jul 2026
24 Jul 2026
18 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplusearth as directed by the Engineer-in-charge upto a distance of 30 M. from the foundation trenches. (Where machine can not reach/move).PWD SOR 2022 4.1.1 | 18.93 | M3 | 100 | ₹1,893.38 |
| - | Providing and fixing M.S. pipe 50 mm ms pipe 1.80 long in wich .45 under road level and 1.35 mtr above road lever. @ 2.00 mtr orizentel distence | 1,870 | No. | 198 | ₹3,70,260 |
| - | Providing and fixing errection of barricades by ballies in three rows etc all comp. | 3,200 | Rmt | 50 | ₹1,60,000 |
| 4 | Wheeled excavator cum Loader Including P.O.L. and Driver | 120 | P/h | 950 | ₹1,14,000 |
| - | Cement Concrete with 2 cm.
gauge stone grit instead of 4 cm. gauge stone ballast, coarse sand & cement in theproportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required
for proper completion of the work. | 14.68 | Cum | 7,050 | ₹1,03,497.53 |
| - | Providing and laying green mat including all comp. | 600 | Sqm | 127.7 | ₹76,620 |
| - | GST | 18 | Percentage | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
BOQ_2197193.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .