| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.9 LAccepted-AOC | L1 | Accepted-AOC L1 Tenderer | |
| 2 | L2₹66.8 L+₹2.9 L (4.54%)Rejected-Finance | L2 | Rejected-Finance L2 tenderer |
Tender Value
₹68.0 L
EMD Value
₹68,000
Closing Date
7 Jul 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director DRDA Kancheepuram
O/o The Project Director DRDA Kancheepuram
Strengthening of Vallathottam Colony to Kalkattur Kalvai Road Km 0/0 - 1/100 (R-178) at Valathottam Panchayat in Kancheepuram Union of Kancheepuram District having Package No.TNKPM 02/2023-24 Under MGSMT - 25 Percentage Component 2022-23 and 2023-24
2023_RDTN_333153_1
DIPR/2982/Tender/2023 dt.13.06.2023
Open Tender
Civil Works - Roads
Lump-sum
180 days
Kancheepuram District
Please refer Tender documents.
8 documents required · 8 mandatory
₹0
₹68,000
O/o The Project Director DRDA Kancheepuram
23 Aug 2023
28 Jun 2023
7 Jul 2023
28 Jun 2023
7 Jul 2023
28 Jun 2023
3 Jul 2023
Amount
Strengthening of Vallathottam Colony to Kalkattur Kalvai Road Km 0/0 - 1/100 (R-178) in Valathottam Panchayat cost of Construction cost Rs.61.53 Lakh & Maintaenance Cost Rs.3.96 lakh
Clearing the scrub jungle including all labour charges for burrying and burning etc km 0/0-1/100
Picking 5 cm to 10 cm exiting surface and sectioning-1 sqm etc completed
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc., complete, for SHOULDERS
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Applying Primer coat over the WMM surface using with 7.00 Kg -Emulsion bitumen binder 7.00 kg/10 Sq.M., Including cost & conveyance of all Materials and all Labour charges
Applying Tack coat over the BT surface using with 2.50 Kg -Emulsion bitumen binder 2.50 kg/10 Sq.M., Including cost & conveyance of all Materials and all Labour charges
Providing and laying 50MM consolidated thickness of Bituminous Macadam using graded metal using Bitumen 60/70 grade including cost and conveyance and all other labour charges etc complete as per clause 504 of MOST specification
BC 25/30/40mm thick (Grade - ii) using VG30 Bitumen and plastic waste Providing and laying Bituminious concrete to 40mm thick using 0.13cum of 19.00-9.50mm. 0.17cum of 9.5-2.36 and below with 50.3kgs of VG30/VG40 heating the bitumen and aggregates to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, carrying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonnes vibratory/phenumatic roller to the required density etc., including labour for attending to paver to site etc.including hire charges and fuel charges foe 20-30t CMP with bitumen boiler, tipper trucks,paver finisher/9m paver finisher,vibratory/phenumatic roller and all other tools and plants required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clauses 507 of MORTH Rev-5
Provision For HM Stone
Provision For KM Stone
Provision for Sign board
Provision for Stopping board
Cost of Refkectirs
Providing and Laying of Hot Applied Thermoplastic Compound 2.50mm Thick including Reflectorising Glass Beads as per IRC 35 etc complete as per MORT & H Specifications No. 803
Provision for Name board
Construction of Bed level Causewa at ch 1010m - 1040 m
Earth work excavation and depositing on bank within initial lead and life as per SS .20.B
Cement conrete 1:4:8 mix using 40mm ISS HBG Metal for foundation including watering wherever necessary and laiding layers of not more than 50cm thick compacting etc. Complete complying with standard specification and as directed by the departmental officials
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete
Cement conrete 1:2:4 mix using 20mm ISS HBG Metal for foundation including watering wherever necessary and laiding layers of not more than 50cm thick compacting etc. Complete complying with standard specification and as directed by the departmental officials
Supplying and erecting centering for sides including cost and conveyance etc., Outer alround & Iner alround.,,
Construction of un-reinforced, dowel jointed at expansion and construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 ( Grade, coarse
Towads sexpansion joints using bitumen painting/ HDPE strips of thickness 3mm to 3mm
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction & Maintenance Works. { GST Amount is the Total GST Amount for overall quoted amount (Both Construction and Maintenance) above this row in column "BB" for all works in this package} (Refer Clause 13.2 & 13.3 of Section 2 of Instruction to Bidders (ITB) of SBD)
D.BABU
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .