Tender Value
₹8.9 L
EMD Value
₹17,760
Closing Date
16 Dec 2024, 4:30 pmClosed
PEK
Sanat Ghar Bemina
Upgradation of water supply and 40000 litre capacity sump at IE Zainakote
2024_SICOP_266625_1
11a-PEK of 2024-25 dated 02-12-2024
Open Tender
Civil Works
Item Rate
25 days
Zainakote
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,000
PEK
₹17,760
21 Dec 2024
2 Dec 2024
17 Dec 2024
2 Dec 2024
16 Dec 2024
2 Dec 2024
Amount
Earthwork in foundation trenches over areas (Exceeding 30cm and upto 1.5 mtr in depth, 1.5 mtr in width) including disposal of excavated earth upto 1 mtr for cutting edge, disposed earth to be leveled and neatly dressed up to a lead of 25m in ordinary rock including dewatering complet job. 1 x 20’-0” x 12’-0” x 10’-0” = 2400.00 Cft Or 67.96 Cum
Providing and laying of stone soiling hand packed tightly including ramming &all carriage complete. 1 x 20’-0” x 12’-0” x 0’-6” = 120.00 Cft Or 3.39 cum
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering all work upto plinth level in 1:4:8 mix (1 Cement :4 coarse sand :8 graded stone agg.40mm Normal Size) using crushed agg. Including all leads, lists and all carriages. Upto site of work complete 1 x 20’-0” x 12’-0” x 0’-9” = 79.20 Cft Or 2.24 Cum
Providing and laying of reinforced cement concrete of specified grade excluding the cost of centering and shuttering all work upto floor V-level in 1:1.5:3 (1 cement:1.5 coarse sand:3 graded stone agg.20mm normal size) using crushed agg. Including all carriages upto site of work complete. 1 x 20’-0” x 12’-0” x 0’-9” = 180.00 Cft 2 (20’-0”+10’-0”) x 8’-0” x 1’-0” = 480.00 Cft 1 x 20’-0” x 12’-0” x 0’-6” = 120.00 Cft Total Qty = 780.00 Cft or 22.09 Cum
Formwork of ordinary timber planks so as to give rough finish including removal of the same. 2(20’-0” + 10’-0”) 8’-0” = 480.00 Sft 2 (18’-0” + 8’-0”) 8’-0” = 416.00 Sft 1 x 18’-0” x 10’-0” = 180.00 Sft Total = 1076.00 Sft or 100.00 Sqm
Steel reinforcement for RCC work incl. Straightening, cutting , bending, placing in position and binding all complete cold twisted bars (TMT bars) incl. all carriages complete 22.09 cum @115 kg.cum= 2540 kgs
P/F Ceramic glazed floor tiles 300x300 mm (thickness to be specified by the manufacturers) of 1st quality conforming to IS: 13755 of NITCO, ORIENT, SOMANY, KAJARIA or equivalent make in color such as White, Ivory, Grey, Fume Red, Brown laid on 20 mm thick bed of Cement Mortar 1:4 (! cement: 4 coarse sand) including pointing the joints with white cement and matching pigment etc. complete. 2 (20’-0”+10’-0”)8’-0” = 480.00 Sft 1 x 20’-0” x 10’-0” = 200.00 Sft Total = 680.00 Sfts or 63.19 Sqm
Providing and fixing of GI Pipe fitting of approved brand and manfacture (Bclass) of various Dia. a. 4” dia = 40.00 rft or 12.19 RM
2 ½” dia = 240.00 Rft or 73.17 Rm
Union 2 ½”
Socket
Pipe ½ = 200 Rft or 60.97 RM
Flunge 4”
Gate value 4”
Gate Value 6”
Providing and fixing of 4 HP water Pump including all necessary fittings.
Supply and installation of 2 HP motor including all accessories and fittings.
M/S ABID NAZIR BHAT (BID ID -2272026)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .