Loading…
Loading…
Tender Value
₹98,000
EMD Value
₹1,960
Closing Date
2 Sept 2026, 6:00 pm5d left
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI ROOM
EXECUTIVE ENGINEER OFFICE REW DIVISION REASI, BLOCK NO. 2, ROOM NO. 205
Balance Work alongwith allied work of Toilet of Panchayat Ghar Pyt. Mahore D Pyt Mahore-D Block Mahore Reasi
2026_RDPR_322244_1
e-NIT No. 126 of REW REASl of 2026-27
Open Tender
Civil Works
Percentage
90 days
REASl
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
MH 0515
₹1,960
Yes
25 Aug 2026
25 Aug 2026
3 Sept 2026
25 Aug 2026
2 Sept 2026
25 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: All kinds of soil :1 meter from cutting edge | 12 | cum | 479.3 | ₹5,751.6 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) including all leads, lift and carriage complete | 0.79 | cum | 4,826.5 | ₹3,812.94 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) 70% concrete | 5.1 | cum | 4,826.5 | ₹24,615.15 |
| 4 | Reinforced cement concrete work in walls (any thickness) including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts upto floor five level including curing but excluding cost of centering shuttering, finishing and reinforcement. 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) including all leads, lift and carriage complete | 0.85 | cum | 9,395.7 | ₹7,986.35 |
| 5 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 14.5 | sqm | 286.35 | ₹4,152.08 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for ; Suspended floors, roofs, landings, balconies and access platforms. including all leads, lift and carriage complete | 3.93 | sqm | 718.2 | ₹2,822.53 |
| 7 | Edges of slabs and breaks in floors and walls under 20 cm including all leads, lift and carriage complete | 10.37 | sqm | 262.2 | ₹2,719.01 |
| 8 | Providing and Fixing waste pipe 110 mm | 10 | feet | 90 | ₹900 |
| 9 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete including all leads, lift and carriage complete | 75.76 | kg | 123.2 | ₹9,333.63 |
| 10 | Providing and fixing M.S. grills of required pattern in frames of windows etc. with M.S. flats, square or round bars etc including priming coat with approved steel primer all complete. Fixed to steel windows by welding | 20 | kg | 212 | ₹4,240 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.69 MB
BOQ_1079184.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].