Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹1.8 L+₹28,859.73 (19.1%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹2.0 L+₹45,482.54 (30.2%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | S.Masilamani (Masilamani Traders) L3 | G.Purusothaman L1 | M/S Krish Constructions L2 |
|---|---|---|---|---|---|---|
| 1.00Providing Compound wall for new OHT at Mettukuppam village (30000 litre OHT Tank) H/O Kesavanakuppam Panchayat Sholinghur Block Ranipet District | ||||||
| 2.00 | Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20B | 6.75 | Cum | 260.78 ₹1,760.27 | 260.78 ₹1,760.27 | 200 ₹1,350 Lowest |
| 3.00 | C.C 1:4:8mix using 40mm ISS HBG metal including cost and conveyance of all etc.. Complete | 2.48 | Cum | 5,583.96 ₹13,848.22 | 5,523.96 ₹13,699.42 | 3,700 ₹9,176 Lowest |
| 4.00 | RCC 1:1.5:3 mix using 20 mm ISS HBG metal including cost of materials and labour charges etc complete | 2.66 | Cum | 9,499.25 ₹25,268.01 | 3,500 ₹9,310 Lowest | 6,800 ₹18,088 |
| 5.00 | Supply and fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete | 0.3 | MT | 91,976.2 ₹27,592.86 | 91,976.2 ₹27,592.86 | 65,000 ₹19,500 Lowest |
| 6.00 | Supplying and erecting centering for sides including cost of materials and labour charges etc complete | 13.62 | SQM | 547.5 ₹7,456.95 | 547.5 ₹7,456.95 | 500 ₹6,810 Lowest |
| 7.00 | For Column | 11.78 | SQM | 1,095 ₹12,899.1 | 1,095 ₹12,899.1 | 900 ₹10,602 Lowest |
| 8.00 | Brick work in CM1:5 using country bricks including cost and conveyance of all materials and labour charges etc complete | 5.1 | Cum | 6,166.53 ₹31,449.3 | 2,500 ₹12,750 Lowest | 3,800 ₹19,380 |
| 9.00 | Plastering with CM 1:5 12mm thick including cost and conveyance labour charges etc complete | 76.17 | SQM | 286.6 ₹21,830.32 | 260 ₹19,804.2 Lowest | 500 ₹38,085 |
| 10.00 | Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete | 76.17 | SQM | 262.48 ₹19,993.1 | 240 ₹18,280.8 | 200 ₹15,234 Lowest |
Tender Value
₹2.0 L
EMD Value
₹2,000
Closing Date
12 Nov 2026, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
BDO BP
Panchayat Unon Sholinghur
Providing Compound wall for new OHT at Mettukuppam village (30000 litre OHT Tank) H/O Kesavanakuppam Panchayat Sholinghur Block Ranipet District
2026_RDTN_718684_1
A3/3091/2026
Open Tender
Civil Works
Item Rate
180 days
Sholinghur
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹2,000
Yes
13 Nov 2026
28 Oct 2026
12 Nov 2026
28 Oct 2026
12 Nov 2026
28 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing Compound wall for new OHT at Mettukuppam village (30000 litre OHT Tank) H/O Kesavanakuppam Panchayat Sholinghur Block Ranipet District | - | - | - | - |
| 2 | Earthwork excavation and depositing on bank with initial lead and lift in all clauses of soil including cost of labour etc complete SS20B | 6.75 | Cum | 263.78 | ₹1,780.51 |
| 3 | C.C 1:4:8mix using 40mm ISS HBG metal including cost and conveyance of all etc.. Complete | 2.48 | Cum | 5,583.96 | ₹13,848.22 |
| 4 | RCC 1:1.5:3 mix using 20 mm ISS HBG metal including cost of materials and labour charges etc complete | 2.66 | Cum | 9,499.25 | ₹25,268.01 |
| 5 | Supply and fabricating and placing in position of ribbed steel rods for reinforcement to all RCC works as per the design given including cost of steel and binding wire also in all floors etc., complete | 0.3 | MT | 91,976.2 | ₹27,592.86 |
| 6 | Supplying and erecting centering for sides including cost of materials and labour charges etc complete | 13.62 | SQM | 547.5 | ₹7,456.95 |
| 7 | For Column | 11.78 | SQM | 1,095 | ₹12,899.1 |
| 8 | Brick work in CM1:5 using country bricks including cost and conveyance of all materials and labour charges etc complete | 5.1 | Cum | 6,166.53 | ₹31,449.3 |
| 9 | Plastering with CM 1:5 12mm thick including cost and conveyance labour charges etc complete | 76.17 | SQM | 286.6 | ₹21,830.32 |
| 10 | Painting two coats with Emulsion Paint over the one coat of Priming coat including cost and conveyance of all materials to site and all labour charges etc complete | 76.17 | SQM | 262.48 | ₹19,993.1 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
BOQ_863132.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .