| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.9 LAccepted-AOC | L1 | Accepted-AOC Lowest bidder | |
| 2 | L2₹22.7 L+₹78,128 (3.56%)Rejected-AOC | L2 | Rejected-AOC Other than lowest | |
| 3 | L3₹28.5 L+₹6.5 L (29.9%)Rejected-AOC TP 117 2ND FLOOR MAURYA ENCLAVE PITAMPURA DELHI 110034 | DELHI | DELHI | DELHI | 110034 | L3 | Rejected-AOC Other than lowest | |
| 4 | L4₹28.6 L+₹6.7 L (30.4%)Rejected-AOC 137 3 STREET NO 4 RAJINDER NAGAR DEHRADUN UK 248001 | DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | L4 | Rejected-AOC Other than lowest | |
| 5 | L5₹33.0 L+₹11.1 L (50.6%)Rejected-AOC INDEX NO E 108 HQ CWE NO 2 DELHI CANTT J 636 SECTOR 23 SANJAY NAGAR GHAZIABAD UTTAR PRADESH 201002 | GHAZIABAD | UTTAR PRADESH | 201002 | L5 | Rejected-AOC Other than lowest |
Tender Value
₹41.1 L
EMD Value
₹82,300
Closing Date
6 Jul 2024, 6:00 pmClosed
AGE I CG
Noida
AGE I CGN 03 24 25 PROVN OF RO PLANTS AND PROVN OF RO 15 LTRS CAPACITY AT BLDG NO P-1 P-2 AND P-5 AT SEC-52 UNDER AGE I CG NOIDA
2024_MES_653104_2
AGE I CGN 03 24 25
Open Tender
Miscellaneous Works
Item Rate
Noida
D c vii/b ii
8 documents required · 8 mandatory
₹500
AGE I CG
₹82,300
25 Jul 2024
13 Jun 2024
8 Jul 2024
13 Jun 2024
6 Jul 2024
20 Jun 2024
Amount
Taking down old unserviceable RO plant of capacity 1000 Ltrs/200 Ltrs complete and depositing to MES store Yard Sec-62 complete all as directed.
Taking down old unserviceable RO plant of capacity 15 Ltrs for the Qtrs at Sector -52 complete and depositing to MES store Yard Sec-62 complete all as directed.
Supply, install, testing and commissioning of fully automatic RO+UV potable water purification system 1000 ltrs per Hour capacity, floor mounted complete with following paramaters /specifications :- (a) Maximum Input Water TDS allowed to the system- 1000 (b) Type of water purification technology -RO+UV (c ) Availability of sediment and activated carbon filter (d) Operation -Fully automatic with auto cut off (e) Ultraviolet (UV) LAMP (f) Conformity to Standard for Ultraviolet system -IS 14724 (latest) (g) Ultra Voilet (UV) Lamp power in watts -24 (h) Recovery at 27 degree Centigrade 30-40 (j) Output Water Conforming standard - IS 10500 (latest) (k) Filtration Capacity in liter/ hour -1000 (l) Provision of Arsenic removal (m) Provision of Floride removal
(n) Provision of Chloride removal (o) Alkaline filter (p) Storage tank -inbuilt (q) Minimum inlet pressure 0.3 Kg/cm2 (r) Maximum inlet pressure 3.5 Kg/cm2 (s) Maximum inlet temperature 40 DEGREE (t) Digital display (u) Real time TDS display (v) High pressure pump w) Raw water/Chemical Raw water/Chemical Cleaning PUMP (x) Micron Filter (y) Total Dissolved Solids Removal Percentage from RO Membrane 75% (z) Particulate Filter Porosity 10 micron (aa) Pressure vessel Sand Filter (ab) Pressure vessel carbon Filter (ac) Pressure Vessel Dual Media Filter (ad) Membrane Housing (ae) Body of filter stainless steel (af) Auto cut system (ag) Number of candles 4 or more or required as per parameter of RO. (ah) Power supply 415 Volt three phase
Supply, install, testing and commissioning of fully automatic RO+UV potable water purification System 250 Ltrs per hour Capacity, floor mounted complete with following paramaters/ specifications :- (a) Maximum Input Water TDS allowed to the system- 2000 (b) Type of water purification technology -RO+UV (c ) Aavailability of sediment and activated carbon filter (d) Operation -Fully automatic with auto cut off (e) Ultraviolet (UV) LAMP (f) Conformity to Standard for Ultraviolet system -IS 14724 (latest) (g) Ultra Voilet (UV) Lamp power in watts -24 (h) Recovery at 27 degree Centigrade 30-40 (j) Output Water Conforming standard - IS 10500 (latest) (k) Filtration Capacity in liter/ hour -250 (l) Provision of Arsenic removal (m) Provision of Floride removal (n) Provision of Chloride removal (o) Alkaline filter (p) Minimum inlet pressure 0.3 Kg/cm2 (q) Maximum inlet pressure 3.5 Kg/cm2
(r) Maximum inlet temperature 35 DEGREE (s) High pressure pump (t) Raw water/Chemical Raw water/Chemical Cleaning PUMP (u) Micron Filter (v) Total Dissolved Solids Removal Percentage from RO Membrane 75% (w) Particulate Filter Porosity 5 micron (x) Membrane Housing (y) Auto cut (z) Number of candles 2 or more or required as per parameter of RO (aj) Power supply 230 Volt single phase
Supply, install, testing and commissioning of fully automatic RO+UV + UF potable water purification System 15 Ltrs per hour Capacity ,Wall mounted complete with following paramaters/specifications :- (a) Maximum Input Water TDS allowed to the system-2000 (b) Type of water purification technology -RO +UV + UF (c ) Aavailability of sediment and activated carbon filter (d) Operation -Fully automatic with auto cut off (e) Conformity to Standard for Ultraviolet system -IS 14724 (latest) (f) Recovery at 27 degree Centigrade 30-40 (h) Output Water Conforming standard - IS 10500 (latest) (j) Filtration Capacity in liter/ hour -15 (k) Provision of Arsenic removal (l) Provision of Floride removal (m) Provision of Chloride removal (n) Storage tank -inbuilt ABS Food Grade-08 Ltrs (o) Minimum inlet pressure 0.3 Kg/cm2 (p) Maximum inlet pressure 3.5 Kg/cm2
(q) Maximum inlet temperature 35 DEGREE (r) High pressure pump (t) Particulate Filter Porosity 5 micron (u) Pressure vessel Sand Filter, Carbon Filter & Dual Media Filter. (v) Body of filter ABS Food grade (w) Auto cut system (x) Power supply 230 Volt single phase Make:-Kent/Aqua Guard/Livpure
Supplying and fixing of CPVC pipes SDR 11 & Plain CPVC SDR 11 fittings complete all as specified of Size 25 mm for RO plant connection
Supplying and fixing of CPVC pipes SDR 11 & Plain CPVC SDR 11 fittings in trenches complete all as specified of Size 40 mm for RO plant connection
Supplying and fixing of CPVC pipes SDR 11 & Plain CPVC SDR 11 fittings in trenches complete all as specified of Size 50 mm mm for RO plant connection
Supply, hoisting and fixing of multilayer, rotational moulded polyethylene water storage tank of capacity 2000 ltrs (cylindrical vertical with closed top) in existing position including necessary connections of pipes, complete all as specified in SSR Part-I and as directed.
M&L for Provision of earthing with 600x600x6.0mm galvanised steel earth plate electrode buried vertically in ground (earth pit not less than 2.25 metre deep below normal ground level) with top edge of the plate at a depth of not less than 1.5m below ground level, connected to and including G.I. Strip of size 32 X 6 mm by means of bolts,nuts and check nuts and washers of galvanised steel (and 40mm dia GI medium grade pipe for protection of G.I strip) to the extent of 7.5 metres as earthing lead and connecting to the RO plant,RO plant motor including charcoal dust and salt packed all around the earth plate in the earth pit all as per electrical plate No. 3 of SSR Part I (2009) including PCC foundation / chamber in mix 1:2:4 type B1 with M.S. angle iron frame, C.I. Cover with provision of locking arrangement and 20mm dia light grade G.I. Pipe from top edge of the earth plate upto M.S. funnel with wire mesh provided inside the concrete earth pit for watering arrangement, M& L complete including excavation and earthwork in any type of soil strata and testing complete all as specified and directed. (Note : GI strip and earth protection pipe upto and including 7.5 m length shall deemed to be included in unit rate quoted by contractor)
BLUE HILL ELECTRICAL AND ELECTRONICS
GLIBS CONSTRUCTION
M/S ANIL KUMAR
KRISHANA ELECTRIC WORKS
SUN CHEMICALS
Shri Radhey Associates
M/S BEE ESS ENTERPRISES
PRASAD ELECTRICALS
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .