| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.9 LAccepted-AOC KOLKATA 54 | KOLKATA | WEST BENGAL | 700054 | ₹3.9 L | L1 | Accepted-AOC WORK ORDER ISSUED |
| 2 | L2₹4.0 LRejected-Finance | ₹4.0 L | L2 | Rejected-Finance 2nd lowest bidder |
| 3 | L3₹4.1 LRejected-Finance | ₹4.1 L | L3 | Rejected-Finance 3rd lowest bidder |
Tender Value
₹3.9 L
EMD Value
₹8,000
Closing Date
19 Mar 2026, 11:00 amClosed
EE(BR V)
22 SURYA SEN STREET KOL-12
PROVISION OF WORKS FOR PROVIDING ASSURED MINIMUM FACILITIES (AMF) FOR LEGISLATIVE ASSEMBLY ELECTION 2026 AT 162 CHOWRANGEE, 164 BELEGHATA ASSEMBLY CONSTITUENCY AND 165 JORASANKO ASSEMBLY CONSTITUENCY UNDER DEO KOLKATA NORTH WITHIN BR V
2026_KMC_1020233_1
KMC/EE(C)/Br-V/ELECTION/25-26
Open Tender
CIVIL WORKS
21 days
BR-V
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
₹8,000
28 Apr 2026
11 Mar 2026
23 Mar 2026
11 Mar 2026
19 Mar 2026
11 Mar 2026
BUILDING WORKS ( C ) BRICKWORKS,CONCRETE WORKS ETC?36.HIRE AND LABOUR CHARGES FOR SHUTTERING WITH CENTERING AND NECESSARY STAGING UPTO 4 M USING APPROVED STOUT PROPS AND THICK HARD WOOD PLANKS OF APPROVED THICKNESS WITH REQUIRED BRACING FOR CONCRETE SLABS, BEAMS AND COLUMNS, LINTELS CURVED OR STRAIGHT INCLUDING FITTING, FIXING AND STRIKING OUT AFTER COMPLETION OF WORKS (UPTO ROOF OF GROUND FLOOR).(WHEN THE HEIGHT OF A PARTICULAR FLOOR IS MORE THAN 4 M THE EQUIVALENT FLOOR HEIGHT SHALL BE TAKEN AS 4 M AND EXTRA FOR WORKS BEYOND THE INITIAL 4 M HT. SHALL BE ALLOWED UNDER 12 (E) FOR EVERY 4 M OR PART THEREOF).(C) STEEL SHUTTERING OR 9 TO 12 MM THICK APPROVED QUALITY PLY BOARD SHUTTERING IN ANY CONCRETE WORK
BUILDING WORKS(D) FLOORING..A. ORIGINAL WORKS..(3)SUPPLYING AND LAYING POLYTHENE SHEET (150GM / SQ.M.) OVER DAMP PROOF COURSE OR BELOW FLOORING OR ROOF TERRACING OR IN FOUNDATION OR IN FOUNDATION TRENCHES.
MATERIALS AND LABOUR 1. BUILDING (B) LABOUR RATES PER DIEM : 3)MAZDOOR (MALE). NOTE: (I)THE ABOVE RATES OF LABOUR ARE EXCLUSIVE OF 10% CONTRACTORS PROFIT AND 1% LABOUR WELFARE CESS WHICH WOULD BE ADMISSIBLE TO THE CONTRACTORS, BUT CONTRACTUAL PERCENTAGE WILL NOT BE APPLICABLE. (II) THE WORKERSEMPLOYED ON HIGH RISE BUILDING OR ANY STRUCTURE OVER 30 FT IN HEIGHT AND ALSO WORKERS ENGAGED IN TUNNEL SHALL BE PAID 20% EXTRA WAGES.
Estimated amount
Add: 9%SGST
Add: 9%CGST
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.22 MB
Tendernotice_2.pdf
PDF • 0.10 MB
Tendernotice_3.pdf
PDF • 0.83 MB
Tendernotice_4.pdf
PDF • 0.82 MB
BOQ_2507787.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid