Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹12.8 CrAccepted-AOC 13B ELLORA ENCLAVE DAYAL BAGH AGRA U P | AGRA | AGRA | UTTAR PRADESH | ₹12.8 Cr | L1 | Accepted-AOC AOC to L1 |
| 2 | L2₹13.6 CrRejected-Finance 99 SUSHILA BIHAR BHUD BULANDSHAHAR | ₹13.6 Cr | L2 | Rejected-Finance L2 |
| 3 | L3₹14.8 CrRejected-Finance 142 | ₹14.8 Cr | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | M/S SHIV SHAKTI CONSTRUCTION L3 | M/S CHAUDHARY ENTERPRISES L2 | NIKHIL CONSTRUCTION L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth Work in cutting for making Canal section in all types of soil including lead upto 30.00 m, lift upto 1.50 m and disposal of surplus earth to spoil banks with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. | 75,175.13 | Cum | 50 ₹37.6 L | 45 ₹33.8 L | 45 ₹33.8 L |
| 2.00 | Earth Work in filling for making Canal Section with lead upto 1.00 km by power transport and lift up to 1.50 m with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. | 3,29,586.73 | Cum | 160 ₹5.3 Cr | 110 ₹3.6 Cr | 107 ₹3.5 Cr |
| 3.00 | Earth Work in excavation of foundation in all types of soil including lead upto 30.00 m and lift up to 1.50 m including filling, watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30.00 m from the foundation trenches including cost of all labour, T&P etc. | 27,129.97 | Cum | 50 ₹13.6 L | 80 ₹21.7 L | 70 ₹19.0 L |
| 4.00 | Earth Work in filling for making Diversion/Approach Road/Ramp with carriage upto 1.00 km by power transport and lift up to 1.50 m manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc. | 2,015.03 | Cum | 160 ₹3.2 L | 150 ₹3.0 L | 135 ₹2.7 L |
| 5.00 | Centering & shuttering for C.C. work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P etc. | 24,467.83 | Sqm | 300 ₹73.4 L | 250 ₹61.2 L | 240 ₹58.7 L |
| 6.00 | Centering & shuttering for R.C.C. slabs, lintels & simple beams work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P etc. | 5,632.14 | Sqm | 350 ₹19.7 L | 500 ₹28.2 L | 410 ₹23.1 L |
| 7.00 | Cutting Bending Binding and placing TMT steel bars for reinforcement with cost of binding wire in all structures required for proper completion of work including cost of all materials, labour, T&P etc. | 61.08 | MT | 75,000 ₹45.8 L | 81,000 ₹49.5 L | 63,000 ₹38.5 L |
| 8.00 | Filling/Laying Local Sand in Bed & Side slope required for proper completion of work including cost of all material, labour, T&P etc. | 1,002.89 | Cum | 600 ₹6.0 L | 500 ₹5.0 L | 550 ₹5.5 L |
| 9.00 | Laying C.C A40, M-10 in foundation of all structures with cement, coarse sand of F.M. not less than 2.0 and hard stone ballast (20 - 40 mm size) including lead upto 60.00 m, lift upto 3.00 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work, including cost of all material, labour, T&P and transportation of concrete to work site. | 1,573.72 | Cum | 4,500 ₹70.8 L | 4,800 ₹75.5 L | 4,700 ₹74.0 L |
| 10.00 | Laying C.C. A20, M-15 with cement, coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75 mm to 20 mm size including lead upto 60.00 m, lift upto 3.00 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, labour, T&P and transportation of concrete to work site. | 5,546.82 | Cum | 5,000 ₹2.8 Cr | 5,000 ₹2.8 Cr | 5,350 ₹3.0 Cr |
Tender Value
₹18.7 Cr
EMD Value
₹37.4 L
Closing Date
13 Feb 2026, 2:00 pmClosed
SE, KBLCCC, BANDA
Office of The Superintending Engineer, Ken-Betwa Link Canal Construction Circle, Banda, Address-Nawab Tank, Banda-210001
Restoration of Dys and Minors offtaking from km. 0.000 to km. 19.800 of Banda Branch in Ken Canal System under Ken-Betwa Link Project
2026_UPIDC_1104143_5
04/SE/2025-26
Open Tender
Civil Works - Canal
547 days
BANDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹7,354
₹37.4 L
Office of The Superintending Engineer
19 Mar 2026
6 Jan 2026
13 Feb 2026
6 Jan 2026
13 Feb 2026
6 Jan 2026
16 Jan 2026
Earth Work in cutting for making Canal section in all types of soil including lead upto 30.00 m, lift upto 1.50 m and disposal of surplus earth to spoil banks with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc.
Earth Work in filling for making Canal Section with lead upto 1.00 km by power transport and lift up to 1.50 m with manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc.
Earth Work in excavation of foundation in all types of soil including lead upto 30.00 m and lift up to 1.50 m including filling, watering, ramming, of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer-in-charge upto a distance of 30.00 m from the foundation trenches including cost of all labour, T&P etc.
Earth Work in filling for making Diversion/Approach Road/Ramp with carriage upto 1.00 km by power transport and lift up to 1.50 m manual compaction & dressing to profile required for proper completion of work including cost of all labour, T&P etc.
Centering & shuttering for C.C. work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P etc.
Centering & shuttering for R.C.C. slabs, lintels & simple beams work in different parts of structures with all leads & lifts required for proper completion of work including cost of all materials and scaffolding, labour, T&P etc.
Cutting Bending Binding and placing TMT steel bars for reinforcement with cost of binding wire in all structures required for proper completion of work including cost of all materials, labour, T&P etc.
Filling/Laying Local Sand in Bed & Side slope required for proper completion of work including cost of all material, labour, T&P etc.
Laying C.C A40, M-10 in foundation of all structures with cement, coarse sand of F.M. not less than 2.0 and hard stone ballast (20 - 40 mm size) including lead upto 60.00 m, lift upto 3.00 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work, including cost of all material, labour, T&P and transportation of concrete to work site.
Laying C.C. A20, M-15 with cement, coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75 mm to 20 mm size including lead upto 60.00 m, lift upto 3.00 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, labour, T&P and transportation of concrete to work site.
Laying C.C. A20, M-20 with cement, coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75 mm to 20 mm size including lead upto 60.00 m, lift upto 3.00 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, labour, T&P and transportation of concrete to work site.
Laying C.C. A20, M-25 with cement, coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75 mm to 20 mm size including lead upto 60.00 m, lift upto 3.00 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, labour, T&P and transportation of concrete to work site.
Laying R.C.C. A20, M-25 with cement, coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75 mm to 20 mm size including lead upto 60.00 m, lift upto 3.00 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material, labour, T&P and transportation of concrete to work site.
Laying C.C. A20, M-30 with cement, coarse sand of F.M. not less than 2.0 and crushed stone grit 4.75mm to 20mm size including lead upto 60.0m, lift upto 3.0 m, mechanical mixing & mechanical vibration but excluding cost of centering and shuttering required for proper completion of work including cost of all material T. & P., labour etc. per Cum [As per Mix Design]
Dewatering by pump hiring of pump & POL/KWH Including all cost of material labour etc per KWH
Two coats of bitumen painting with two layers of tarfelt again followed by two coats of bitumen painting before laying R.C.C. slab required for proper completion of work including cost of all materials, labour, T&P etc.
S/F Drainage spout pipe 100 mm dia In RCC slab required for proper completion of work including cost of all materials, labour, T.& P etc.
Supplying and fixing 1200 mm dia NP-3 hume pipe required for proper completion of work including cost of all materials, labour, T&P etc.
Providing, laying, Jointing & field testing of High Density Polyethylene pipes, (HDPE) PE100 PN6 confirming to IS 4984/ 14151/ 12786/ 13488 with necessary jointing of pipes by electro fusion / butt welding process .with all leads and lifts etc. complete/RM.
Total no = M Kulawa 110 mm dia
Total no = M Kulawa 160 mm dia
Brick work in 1:4 cement mortar with 1st Class Brick, coarse sand of F.M. not less than 2.0 required for proper completion of work including cost of all materials, labour, T&P etc.
Struck Deep Pointing on Brick masonry in C.M. 1 : 2 required for proper completion of work including cost of all materials, labour, T&P etc.
Laying stone grit 10-20 mm gauge as a filter material required for proper completion of work including cost of all materials, labour, T&P etc.
Supply & laying of stone grit 20-40 mm gauge as a filter material required for proper completion of work including cost of all materials, labour, T&P etc.
Providing & Laying Boulder Apron for Bed protection with stone boulder required for proper completion of work including cost of all materials, labour, T&P etc. Taken 80% Qty.of New Boulder And 20% Qty. from old dismelted Structure
Laying Boulder Apron for Bed protection with old stone boulder taken 20% Qty. from old dismelted structure required for proper completion of work including cost of all materials, labour, T&P etc.
Preparation of Subgrade required for proper completion of work including cost of all materials, labour, T&P etc.
Filling/Laying Coarse sand as a filter material below lining required for proper completion of work including cost of all materials, labour, T&P etc.
Cement plaster 12.50 mm thick in 1:6 Cement Sand mortar required for proper completion of work including cost of all materials, labour, T&P etc.
Supplying/Laying two coat Bitumen painting on sleeper top required for proper completion of work including cost of all materials, labour, T&P etc.
Supply & laying of 200 micron L.D.P.E film over plaster work required for proper completion of work including cost of all materials, labour, T&P etc.
Providing & Laying 75 mm thick C.C. lining in A20, M-20 with 4.75 mm to 20 mm hard stone grit and coarse sand of F.M. not less than 2.0 by paver machine on Bed and Side Slope required for proper completion of work including cost of all materials, labour, T&P etc.
Making construction joint in lining & filling sealing compound in joint required for proper completion of work including cost of all materials, labour, T&P etc.
Demolishing Stone rubble masonry in cement mortar manually/ by mechanical means Including disposal of material within 50 metres lead as per direction of Engineer-in-charge
Demolishing R.C.C. work manually/ by mechanical means Including disposal of material within 50 metres lead as per direction of Engineer-in-charge
Earth Work in Dismantling of Diversion/Approach Road/Ramp required for proper completion of work including cost of all labour and T&P etc. per Cum.
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.34 MB
BD-NIT04-SE-25-26LOT05.pdf
Tender Documents • 2.22 MB
BOQ_2036660.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid