Superintending Engineer /Mechanical-I/MTPS-I
Office of the Superintending Engineer / Mechanical -I Mettur Thermal Power Station- I Mettur Dam-636406
MTPS I TM Unit II Overhauling of OLCTC System Pump LHS and RHS Inspection and cleaning of Condenser CW box steam side Hot well and OLCTC System Ball collecting screen Overhauling of 200 mm condenser air release cum vacuum breaking valve etc
2026_EB_710970_1
CE / MTPS-I / SE / M-I / TM /OT.146 / 2026-27
Open Tender
Power/Energy Projects/Products
Works
15 days
Mettur Thermal Power Station-I / Mettur Dam
As per the Tender Specifications
4 documents required · 4 mandatory
₹0
₹2,700
Yes
7 Oct 2026
7 Oct 2026
22 Oct 2026
7 Oct 2026
21 Oct 2026
7 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Overhauling of OLCTC system pump :- Decoupling the pump, disconnection of the pump from suction and discharge pipe flanges, draining the lub oil from the sump. | 2 | Nos | - | - |
| 2 | Dismantling of the Bearing Covers, Bearing Bracket, Dismantling of shaft sleeve and dismantling of the casing etc., | 2 | Nos | - | - |
| 3 | Dismantling the impeller Assembly from the Casing, Inspection and reconditioning the eroded portions of the casings if required, Inspection, Checking measurements and tolerances of the impeller, shaft, impeller wearing ring, casing ring and neck ring and replace all the above if necessary including machining of the wearing rings to the required size and assembling with the impeller suitably. | 2 | Nos | - | - |
| 4 | Reassembling and positioning of the rotor assembly and closing of casing cover, reassembling the sleeve, Bearing Bracket Bearings, Bearing Covers and assembling the coupling in shaft. | 2 | Nos | - | - |
| 5 | Checking and correcting the pump alignment with motor and connecting of pump flanges with renewed gaskets. Inspection of couplings, Coupling the pump with motor, connecting the pump from suction and discharge pipe flanges, and other such works required for efficient operation of the pump and commissioning. Cleaning & painting the complete pump assembly & Base structure, Painting inside the pump casings, and painting of the pump base concrete structure, with Oil Distemper.(Paint under Contractor’s Scope) | 2 | Nos | - | - |
| 6 | Opening of condenser water box manhole door, cleaning of water box and tubes and removing the entrapped debris (Shells) from the CW inlet pipe line bends. Opening of water box man hole door, arranging the safety ropes and safety equipment’s, cleaning the water box, removal of debris from the water box and tubes and closing of man hole doors with new gaskets. | 1 | Unit | - | - |
| 7 | Closing of front & Rear manhole doors of 16 Nos for Condenser LHS & RHS. Manhole doors after renewing all the manhole door rubber chords and Providing and removing condenser jack pipes during vacuum tightness test. | 1 | LS | - | - |
| 8 | Inspection of OLCTC System Ball collecting screen:- a) Opening of OLCTC System Ball collecting screen manhole doors LHS & RHS -2 Nos. and cleaning the debris and closing of manhole doors with renewal of gaskets. | 1 | Unit | - | - |
| 9 | Cleaning and painting works including cost of paintings:- Cleaning and painting of CW Inlet & outlet pipe lines and CW Box of condenser(LHS & RHS) with double coat , Two Coat of side (LHS & RHS) painting of CW Inlet & outlet pipe lines of condenser in outer side (LHS & RHS) | 345 | M2 | - | - |
| 10 | Overhauling of 200mm condenser air release cum vacuum breaking valve and its isolation gate valves and gear mechanism:- Dismantling the isolation valve, air release cum vacuum breaking valve of size 200mm,Cleaning all the parts, lapping the seating surface like valve seat and gates, checking blue contact, changing the internals if necessary and reassembling the valves with new gland packing’s, “O” Rings etc. | 2 | Nos | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.92 MB
BOQ_854181.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .