Loading…
Loading…
Tender Value
₹1.2 Cr
EMD Value
₹2.1 L
Closing Date
25 Mar 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
DYCEDMV1
30 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of V/N or 'V' whichever is less; where V= Advertised value of the tender in crores of Rupees N= Number of years prescribed for completion of work for which bids have been invited. The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover. The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
Standard Technical Criteria are as follows:
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited:
Three similar works, each costing not less than the amount equal to 30% of advertised value of tender, Or
Two similar works, each costing not less than the amount equal to 40% of advertised value of tender, Or
One similar work costing not less than the amount equal to 60% of advertised value of tender.
In case of composite works, tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited:
Three similar works, each costing not less than the amount equal to 30% of advertised value of each component of tender, Or
Two similar works, each costing not less than the amount equal to 40% of advertised value of each component of tender, Or
One similar work costing not less than the amount equal to 60% of advertised value of each component of tender.
Note for (1.2): Separate completed works of minimum required values 1.2.4 shall also be considered for fulfillment of technical eligibility criteria for different components.
Note: (a)The 'work' includes subletted works also, if awarded to subleting contractor with the approval of main client. The work experience certificate of subletted work should be issued by the main client only, to be eligible for consideration. To evaluate the technical eligibility of tenderer, only components of work as stipulated in tender documents for evaluation of technical eligibility, shall be considered. The scope of work covered in other remaining components shall be either executed by tenderer himself if he has work experience as mentioned in clause 7 of the Standard General Conditions of Contractor through subcontractor fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract or jointly i.e., partly himself and remaining through subcontractor, with prior approval of Chief Engineer in writing. However, if required in tender documents by way of Special Conditions, a formal agreement duly notarised, legally enforceable in the court of law, shall be executed by the main contractor with the subcontractor for the component(s) of work proposed to be executed by the subcontractor(s), and shall be submitted along with the offer for considering subletting of that scope of work towards fulfillment of technical eligibility. Such subcontractor must fulfill technical eligibility criteria as follows: The subcontractor shall have successfully completed at least one work similar to work proposed for subcontract, costing not less than 35%value of work to be subletted, in last 5 years, ending last day of month previous to the one in which tender is invited through a works contract. Note: for subletting of work costing up to Rs 50 lakh, no previous work experience of subcontractor shall be asked for by the Railway. In case after award of contract or during execution of work it becomes necessary for contractor to change subcontractor, the same shall be done with subcontractor(s) fulfilling the requirements as per clause 7 of the Standard General Conditions of Contract, with prior approval of Chief Engineer in writing. (b)Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates. In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Substantially Completed Work means an ongoing work in which payment equal to or more than 90% of the present contract value (excluding the payment made for adjustment of Price variation (PVC), if any) has been 1.3.1 made to the contractor in that ongoing contract and no proceedings of termination of contract on Contractor's default has been initiated. The credential certificate in this regard should have been issued not prior to 60 days of date of invitation of present tender.
In case a work is started prior to 07 (seven) years, ending last day of month previous to the one in which tender is invited, but completed in last 07 (seven) years, ending last day of month previous to the one in which tender is invited, the completed work shall be considered for fulfillment of credentials.
If a work is physically completed and completion certificate to this extent is issued by the concerned organization but final bill is pending, such work shall be considered for fulfillment of credentials.
In case of completed work, the value of final bill (gross amount) including the PVC amount (if paid) shall be considered as the completion cost of work. In case final bill is pending, only the total gross amount already paid including the PVC amount (if paid) shall be considered as the 1.5.1 completion cost of work. In case of substantially completed work, the total gross amount already paid including the PVC amount (if paid), as mentioned in the certificate, shall be considered as the cost of substantially completed work.
If a bidder has successfully completed a work as subcontractor and the work experience certificate has been issued for such work to the subcontractor by a Govt. Organization or public listed company as defined in Note for Item 1.2.4 & 1.3, the same shall be considered for the purpose of fulfillment of credentials.
In case a work is considered similar in nature for fulfillment of technical credentials, the overall cost including the PVC amount (if paid) of that completed work or substantially completed work, shall be considered and no separate evaluation for each component of that work shall be made to decide eligibility.
Defination of Similar Work :- All kinds of P-way work involving linking, packing.
45 conditions · 8 needing a document upload
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
It is understood that you are agreed to abide by the conditions those are laid down in the tender document when you submit the tender.
Tenders have been invited for and on behalf of the President of India for the work mentioned as per NIT.
Tender documents are not transferable.
The tender document includes various chapters, drawings and annexures as enclosed, those are integral parts of the tender documents.
The Bid Security shall be deposited either in cash through e payment gateway or submitted as Bank Guarantee bond from a scheduled commercial bank of India or as mentioned in tender documents. The Bank Guarantee bond shall be as per Annexure- VIA and shall be valid for a period of 90days beyond the bid validity period.
Rates enter in to rate page shall only be considered. Rates offered in any other form /letter by the tenderer shall not be considered.
Tenders other than in form of e-Tendering shall not be accepted against this tender. For this purpose, tenderers are required to submit their offer in IREPS.
In case of any difficulty faced by the tenderer while submitting their bid in the IREPS website assistance from help desk available with the website may be sought.
Railway Administration will not be responsible for any delay/difficulties /inaccessibility of the down loading facility for any reason whatsoever. In case of any discrepancy between the tender documents down loaded from internet and the master copy available in the offices, the latter shall prevail and will be binding on the tenderer(s). No claim on this account will be entertained.
General information about the project/work is attached separately. However the tenderer(s) are advised to visit the site for appreciation before submitting of tender.
Name & mailing address of the Tenderer(s) shall be clearly mentioned in ENGLISH language.
All the information requested for Tender shall be answered in the ENGLISH language. Where information is provided in another language, this shall be accompanied by a translation of its pertinent parts into ENGLISH. This translation will govern and be used for interpreting the information.
The railway reserves the right to:
Amend the scope and value of the work.
Reject or accept any tender; and
Cancel the tender process and reject any or all tenders, at any time.
The tenderer(s) have to fill up all the documents as stated in document.
Incomplete tenders are liable to be rejected without further correspondence.
If any one or more of the detailed information furnished in the tenderer's documents is proved to be false at any stage, the contractor/ firm will be debarred then and there, from all the commitments connected with the tender and his/their tender/contract will be rejected/terminated and further action will be taken as per extant rules.
The Railway reserves the right to reject any or all offers without assigning any reasons and his decision shall be final and binding.
Tenderer(s) are compulsorily required to indicate page number in the check list against relevant documents submitted by him / them.
Joint venture will be permitted in the tender value more than Rs.10.00 Crs.
Clause 6 (Care In Submission Of Tenders), Part-I of Standard General Conditions of Contract - 2022.
(a)(i) Before submitting a tender, the tenderer will be deemed to have satisfied himself by actual inspection of the site and locality of the works, that all conditions liable to be encountered during the execution of the works are taken into account and that the r a t e s he enters in the tender f o r m s a r e adequate and all inclusive t o accord w i t h t h e provisions in Clause-37 o f the Standard General Conditions o f Contract f o r t h e completion of works to the entire satisfaction of the Engineer.
(ii) Tenderers will examine the various provisions of The Central Goods and Services Tax Act, 2017(CGST)/ Integrated Goods and Services T a x A c t , 2017(IGST)/ Union Territory Goods and Services Tax Act, 2017(UTGST)/ respective state's State Goods and Services Tax Act (SGST) also, as notified b y Central/State G ov t & as amended from tim e t o tim e and applicable taxes before bidding. Tenderers will ensure that full benefit of Input Tax Credit (ITC) likely to be availed by them is duly considered while quoting rates.
(iii) The successful tenderer who is liable to be registered under CGST/IGST/UTGST/SGST Act shall submit GSTIN along with other details required under CGST/IGST/UTGST/SGST Act to railway immediately a f t e r t h e a w a r d o f contract, without w h i c h no payment shall be released to the contractor. The contractor shall be responsible for deposition of applicable GST to the concerned authority.
(iv)In case the successful tenderer is not liable t o be registered under CGST/IGST/UTGST/ SGST Act, the railway shall deduct the applicable GST from his/their b i l l s u n d e r r e v e r s e charge mechanism (RCM) and deposit t h e same to the concerned authority.
The tender/technical bid will be evaluated based on bid capacity formula detailed as Annexure-VI.(Applicable for works costing more than Rs.20.00 crore)
PRICE VARIATION clause shall be applicable for tenders having value above Rs. 2 Crores.
Regular and incidental track, bridges, formations, buildings etc., maintenance work post CRS of Shokhuvi-Molvom section and Molvom yard in connection with Dimapur - Kohima New BG Railway line Project.
DYCE-CON-DK-TL-2026-01
DYCE-CON-DK-TL-2026-01
Open
Works - General
12 Months
Dimapur, Nagaland
₹0
₹2.1 L
25 Mar 2026
27 Feb 2026
11 Mar 2026
9 items across 3 schedules
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | Above/ 10671840.66 Below/P | ||
| for details. | Item Breakup | — | — | ||
| Annexure-I and any other Item of works of NFUSSOR-2021, which are not covered in Annexure-I, but required for successful completion of work. | — | — | — | 1,06,71,840.66 | |
| — | — | — | Above/ 1056327.11 Below/P | ||
| for details. | Item Breakup | — | — |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
8.MACH-VIII_1.pdf
ATTACHMENT
Toppage_1.pdf
ATTACHMENT
1.NIT_3.pdf
ATTACHMENT
2.Index_1.pdf
ATTACHMENT
3.Checklist_1.pdf
ATTACHMENT
5.Appendix-II.pdf
ATTACHMENT
6.MainTDmerged.pdf
ATTACHMENT
7.CMB.pdf
ATTACHMENT
9.MakeinindiaCH-IX.pdf
ATTACHMENT
10.Chapter-Xsplspectrackwork.pdf
ATTACHMENT
12.CH-XIISplSpnforWeldingofRailJoints.pdf
ATTACHMENT
13.FORMS.pdf
ATTACHMENT
11.CH-XISplspecificationCivilworks_compressed.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].