Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
₹4.3 L
EMD Value
₹4,500
Closing Date
17 Jan 2023, 1:00 pmClosed
SE ETC I MORADABAD
220 KV SS CAMPUS MAJHOLA MORADABAD
THE WORK CONSTRUCTION OF 01 NO 220 KV BUS COUPLER BAY AT 220 KV SUBSTATION MAJHOLA MORADABAD UNDER ELECTRICITY TRANSMISSION DIVISION II MORADABAD
2022_UPTCL_757490_1
E-T-66/ETCM/2022-2023
Open Tender
Electrical Works
Fixed-rate
45 days
MORADABAD
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE, ETC 1 MORADABAD
₹4,500
4 Mar 2023
8 Dec 2022
17 Jan 2023
8 Dec 2022
17 Jan 2023
8 Dec 2022
Amount
Following works are to be carried out at 220 KV S/S, Majhola under ETD-II, Moradabad.
Safely Dismantling of 220 KV 01 No Beam in outside of 220 KV Switchyard through hydra ( open store) and shifting of working site Aprox Distance 2 Km. 2 Nos. DTM & BXM
Sorting and stacking of Main & Auxiliary structure.
Making hole in part of GI main/auxiliary structure/ cutting of GI angle drilling of hole existing/defective structure/plate/angle and grinding machine with all cost of men, T&P etc.
Erection of Main & Auxiliary structure of 220 KV Bus Coupler Bay as per drawing and tightening of nuts and bolts with proper alignment including shifting of structure from store to site and proper stacking.
Cutting, strengthening, bending, laying 700 mm. below in ground and above ground of following size of MS Flat for earthing of main and auxiliary structure, equipment structure etc. including welding with main earth mat and with object to be earthed/excavation of trenches its back filling.
Painting of MS Flat Size of 75x10 mm
Painting of MS Flat Size of 50x6 mm
Erection of following equipments as per instruction manual of various equipments and technical specification including shifting of material/equipments from store to erection site including all other associated work to complete the job satisfactorily.
245 KV CB with its structure.
245 KV BI with its operating mechanism (motorized)
220 KV Simplex control & relay panel
220 KV Post Insulator
245 KV CT Junction Box
Preparation of cable schedule of 220 KVBus Coupler Bays & Bus Bar Protuction Scheme.
Laying of following size of armoured control cable:
2Cx2.5 Sq.mm
4Cx2.5 Sq.mm
6Cx2.5 Sq.mm
10Cx2.5 Sq.mm.
Termination of following sizes of Cable:
2Cx2.5Sq.mm
4Cx2.5Sq.mm
6Cx2.5Sq.mm
10Cx2.5Sq.mm
Stringing & proper sagging of single moose conductor. Work includes properly fitting of tension fittings, hoisting of 120/70 KN disc insulator, tension fitting, spacer etc & cutting of conductor as required to complete the work in all respect satisfactory.
Interconnection and jumpering of equipment of 220 KV Bus Coupler Bay. (For Bus Bar, Isolator, Breaker, Post Insulator C.T. etc.)
Meena Elect & Engg. Works
Gupta Elect and Engg Works
M/s S.S. Refregeration
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .