Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹1.5 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | ||
| 2 | L2₹1.8 L+₹21,706.58 (14.1%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | ||
| 3 | L3₹1.8 L+₹25,640.65 (16.6%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹2.0 L
EMD Value
₹5,910
Closing Date
28 Jul 2026, 3:00 pmClosed
Executive Eng REW Kupwara
Executive Eng REW Kupwara
Const of Fencing graveyard Tangboth phase 2nd
2026_RDPR_316087_16
NIT NO 58 OF 2026-27 ADF KUPWARA
Open Tender
Civil Works
Percentage
Executive Eng REW Kupwara
Please refer Tender documents.
2 documents required · 2 mandatory
₹200
Executive Eng REW Kupwara
₹5,910
2 Aug 2026
15 Jul 2026
29 Jul 2026
15 Jul 2026
28 Jul 2026
15 Jul 2026
15 Jul 2026 - 15 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed: | 1.5 | cum | 479.3 | ₹718.95 |
| 2 | P/L of dry stone soling duly hand packed including carriage by MT | 0.75 | cum | 1,000 | ₹750 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:3:6. | 8.53 | cum | 5,733.6 | ₹48,907.61 |
| 4 | Centering and shuttering including strutting, propping etc. and removal of form for: Foundations, footings, bases of columns etc. for mass concrete. | 52.04 | sqm | 286.35 | ₹14,901.65 |
| 5 | Removing and refixing existing G.I. chain link fabric fencing of required width incl bolts and washers as required complete as per the direction of Engineer-in charge. | 51.12 | sqm | 150 | ₹7,668 |
| 6 | Providing and fixing G.I. chain link fabric fencing of required width in mesh size 50x50 mm including strengthening with 2 mm dia wire or nuts, bolts and washers as required complete as per the direction of Engineer-incharge. | 31.6 | sqm | 700 | ₹22,120 |
| 7 | Structural steel work in single section, fixed with or without connecting plate, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. Including Carriage by MT with loading and unloading Charges | 405.16 | kg | 120.8 | ₹48,943.33 |
| 8 | 12mm Cement plaster of mix 1 : 6 ( 1 cement : 6 fine sand) | 89.22 | sqm | 266.2 | ₹23,750.36 |
| 9 | Painting steel work with deluxe multi surface paint. Two or more coats applied @ 0.90litre/10sqm over an under coat of primer applied @ 0.80litre/10sqm of approved brand and manufacture | 206.88 | sqm | 125.5 | ₹25,963.44 |
| 10 | Carriage of Materials from source of supply to site of Work by MT and H/L | 11.52 | cum | 344.49 | ₹3,968.52 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.99 MB
BOQ_1029140.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .