Loading…
Loading…
Tender Value
₹2.1 Cr
EMD Value
₹4.2 L
Closing Date
24 Sept 2026, 2:00 pm2d left
ER ONKAR SINGH
EXECUTIVE ENGINEER PROVL DIV PWD BR BATHINDA
RECONSTRUCTION OF 3 NOS BATHROOM TOILET BLOCK IN BOYS HOSTEL AT GZSCET BATHINDA
2026_CEPW_175042_1
PB/BTI/37
Open Tender
Civil Works - Buildings
Percentage
180 days
DISTT BATHINDA
Please refer Tender documents.
2 documents required · 2 mandatory
₹20,000
₹4.2 L
Yes
9 Sept 2026
9 Sept 2026
24 Sept 2026
9 Sept 2026
24 Sept 2026
9 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 0 | Civil Work | - | - | - | - |
| - | Excavation in Soil(any type) using Hydraulic Excavator CK 90 with Hydraulic excavator of 0.9 cum bucket capacity including cutting,trimming bottom and side slopes, in accordance with requirements of lines,grades and cross section, including all lifts and combined lead upto 30m Earth filling under floors with surplus ordinairy soil or soil containing gravel or kankar upto 40% excavated from outside the building plinth in 15cm layers including ramming watering and consolidating lead upto 30 meters. | 354.34 | cum | 102.19 | ₹36,210 |
| - | Cement concrete 1:4:8 with stone aggregates 40mm gauge mixing by mechanical means using concrete mixer volumetric type CSR No.10.11-b (ii) | 23.6 | cum | 4,571.67 | ₹1,07,891.41 |
| - | Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in foundation and plinth. CSR No.10.16
&
A&C1 | 98.55 | cum | 6,436.3 | ₹6,34,297.37 |
| - | Damp proof course 4cm thick of cement concrete 1:2:4 with 2 coats of bitumen 20/30 penetration at1.65 Kg per sqm laid hot and sanded CSR No.10.26 | 31.26 | sqm | 380.64 | ₹11,898.81 |
| - | Reinforced cement concrete M-20 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure. CSR No.10.20 | - | cum | 6,956.73 | - |
| - | Total all Floor CSR No. | 4.26 | cum | 190.68 | ₹812.3 |
| - | Extra for First Floor CSR No.10.48 | 4.26 | cum | 381.37 | ₹1,624.64 |
| - | Reinforced cement concrete M-25 mechanically batch mixed using batch type concrete mixer as per IS:1791 and vibrated by needle vibrator but excluding steel reinforcement centring and shuttering in superstructure. CSR No.10.21
&
A&C1 | - | cum | 7,226.42 | - |
| - | Extra for First Floor CSR No.10.48 | - | cum | 190.68 | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
SBD37compressed.pdf
Tender Documents • 18.15 MB
BOQ_356220.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .