| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.4 LAccepted-AOC | ₹2.4 L | L1 | Accepted-AOC BEING L1 BIDDER |
| 2 | Rejected-Technical | - | - | Rejected-Technical Due to high rates quoted |
| 3 | Rejected-Technical | - | - | Rejected-Technical Due to high rates quoted |
| 4 | Rejected-Technical | - | - | Rejected-Technical Due to high rates quoted |
| 5 | Rejected-Technical | - | - | Rejected-Technical Due to high rates quoted |
Tender Value
Refer Docs
Closing Date
28 Feb 2023, 6:00 pmClosed
GE(AF) HASIMARA
GE (AF) HASIMARA PO HASIMARA DIST ALIPURDUAR PIN 735215 (WB)
SOIL INVESTIGATION OF VARIOUS STRUCTURE AT AF STN HASIMARA
2023_MES_576682_2
3003/Job/E3
Limited
Civil Works
Item Wise
30 days
GE(AF) HASIMARA
Please refer Tender documents.
1 document required · 1 mandatory
₹0
Exempted
7 Mar 2023
20 Feb 2023
2 Mar 2023
20 Feb 2023
28 Feb 2023
21 Feb 2023
Amount
The following works are required to be carried out for soil report for "Addn/Altn/ Improvement to Security Infrastructure alongwith Watch Tower & Associated works” (a) Mobilisation and Demolisation of rotary wash boring rig with all accessories and other necessary tools for boring. (Transportation of T&P with Man & material to site) (b) Soil investigation : Shifting of boring equipment with all accessories from one location to another boring location including all labours and materials (c) Boring 150mm dia in all types of soil up to 6m (or) up to hard starta (Where SPT-N Value>50 or refusal) (d) Carrying out Standard penetration test upto depth 6m of Refusal (N>50) whichever comes earlier. Collection of Samples at different depth for field and lab test including (SPT) as per IS 2131-1963, at site at required depths up to refusal. (e) Drilling NX size Boring up to 1m in to rock and collection of samples in hard rock. (f) Laboratory Analysis : Carrying our laboratory test on collected soil samples and testing on rock samples etc (g) Preparation of Technical report consists of geotechnical investigation data sheets, interpretation of result of lab tests & SBC including recommendation for foundation and submission of reports (6 Sets). The report to include clearly the following parameters : Recommendation of types of foundation for proposed structure with vetted from IIT/NIT or any Govt University : (i) The Safe bearing capacity of the soil. (ii) Whether effect of high water table been considered or not in working out SBC. (iii) Suggested size and depth of foundation for Single storey proposed building. (iv) Type of soil or any other important parameters as per quotation and as required by site condition.
(a) Mobilisation and Demolisation of rotary wash boring rig with all accessories and other necessary tools for boring. (Transportation of T&P with Man & material to site) (b) Soil investigation : Shifting of boring equipment with all accessories from one location to another boring location including all labours and materials. (c) Boring 150mm dia in all types of soil up to 10m (or) up to hard starta (Where SPT-N Value>50 or refusal) (d) Carrying out Standard penetration test upto depth 10m of Refusal (N>50) whichever comes earlier. Collection of Samples at different depth for field and lab test including (SPT) as per IS 2131-1963, at site at required depths up to refusal. ((a) Mobilisation and Demolisation of rotary wash boring rig with all accessories and other necessary tools for boring. (Transportation of T&P with Man & material to site) (b) Soil investigation : Shifting of boring equipment with all accessories from one location to another boring location including all labours and materials. (c) Boring 150mm dia in all types of soil up to 10m (or) up to hard starta (Where SPT-N Value>50 or refusal) (d) Carrying out Standard penetration test upto depth 10m of Refusal (N>50) whichever comes earlier. Collection of Samples at different depth for field and lab test including (SPT) as per IS 2131-1963, at site at required depths up to refusal. (e) Drilling NX size Boring up to 1m in to rock and collection of samples in hard rock. (f) Laboratory Analysis : Carrying our laboratory test on collected soil samples and testing on rock samples etc (g) Preparation of Technical report consists of geotechnical investigation data sheets, interpretation of result of lab tests & SBC including recommendation for foundation and submission of reports (6 Sets). The report to include clearly the following parameters : Recommendation of types of foundation for proposed structure with vetted from IIT/NIT or any Govt University : (i) The Safe bearing capacity of the soil. (ii) Whether effect of high water table been considered or not in working out SBC. (iii) Suggested size and depth of foundation for (G+2) storey proposed building. (iv) Type of soil or any other important parameters as per quotation and as required by site condition.
PRANTIK ASSOCIATES
MABCO CONSULTANT
C B ENTERPRISE
ANIRUDDHA SANYAL
ACHARYA ASSOCIATES
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_651822.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .