Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAccepted-Finance | L1 | Accepted-Finance LOW RATE | |
| 2 | L2₹7.9 L+₹1.0 L (14.6%)Rejected-Finance | L2 | Rejected-Finance HIGH RATE | |
| 3 | L3₹8.1 L+₹1.2 L (17.2%)Rejected-Finance | L3 | Rejected-Finance HIGH RATE |
| Sl No | Description | Qty | Unit | ABHISHEK TRADERS L1 | M/S D.K. CONSTRUCTION L2 | UMESH ELECTRICAL INFRASTRUCTURE L3 |
|---|---|---|---|---|---|---|
| 1.00Supply of following Decentralized materials at the works site as per RESSPO norms | ||||||
| 1.01 | Stone pad 300x300x75 mm | 14 | No | 99 ₹1,386 | 50 ₹700 | 20 ₹280 Lowest |
| 1.02 | Top, Toff, Dropper channel clamp with bolts & nuts for PCC Pole | 137 | No | 244 ₹33,428 | 220 ₹30,140 Lowest | 240 ₹32,880 |
| 1.03 | All lugs 240 mm2 | 56 | No | 98 ₹5,488 | 210 ₹11,760 | 30 ₹1,680 Lowest |
| 1.04 | All lugs 70 mm2 | 8 | No | 98 ₹784 | 210 ₹1,680 | 30 ₹240 Lowest |
| 1.05 | Copper L-piece | 12 | No | 348 ₹4,176 | 1,100 ₹13,200 | 30 ₹360 Lowest |
| 1.06 | LT fuse set protection | 7 | No | 1,898 ₹13,286 | 100 ₹700 Lowest | 200 ₹1,400 |
| 1.07 | Tail Less unit, 500 Amp. | 3 | No | 8,998 ₹26,994 | 65,000 ₹1,95,000 | 300 ₹900 Lowest |
| 1.08 | 11 KV Fuse set | 10 | No | 2,448 ₹24,480 Lowest | 10,000 ₹1,00,000 | 10,000 ₹1,00,000 |
| 2.00Cartage of following materials from ESC, Mirzapur to work site including loading & unloading charge | ||||||
Tender Value
Refer Docs
EMD Value
₹8,100
Closing Date
16 Jun 2026, 2:00 pmClosed
SUPERINTENDING ENGINEER EDC MIRZAPUR
Fataha Mirzapur
Supply of De centralized materials installation of additional T F under Business Plan 2026 27 in EDD Mirzapur
2026_PVVNV_1154832_1
18/EDC(M)/2026-27
Open Tender
Electrical Works
Lump-sum
90 days
SUPERINTENDING ENGINEER EDC MIRZAPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Executive Engineer(A)
₹8,100
20 Jun 2026
27 May 2026
17 Jun 2026
27 May 2026
16 Jun 2026
27 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Supply of following Decentralized materials at the works site as per RESSPO norms | |||||
| 1.01 | Stone pad 300x300x75 mm | 14 | No | 14 | ₹196 |
| 1.02 | Top, Toff, Dropper channel clamp with bolts & nuts for PCC Pole | 137 | No | 15 | ₹2,055 |
| 1.03 | All lugs 240 mm2 | 56 | No | 16 | ₹896 |
| 1.04 | All lugs 70 mm2 | 8 | No | 17 | ₹136 |
| 1.05 | Copper L-piece | 12 | No | 18 | ₹216 |
| 1.06 | LT fuse set protection | 7 | No | 19 | ₹133 |
| 1.07 | Tail Less unit, 500 Amp. | 3 | No | 20 | ₹60 |
| 1.08 | 11 KV Fuse set | 10 | No | 21 | ₹210 |
| 2Cartage of following materials from ESC, Mirzapur to work site including loading & unloading charge | |||||
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.45 MB
BOQ_2163169.xls
BOQ • 0.26 MB
18TermsCondition.pdf
Tender Documents • 0.93 MB
933.pdf
PDF • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .