Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹1.8 L
EMD Value
₹4,570
Closing Date
18 Nov 2023, 9:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Kalaburagi Urban Development Authority
Dileep Jadhav
Shifting of Distribution Transformer Center coming in the Plot No. 1640/A of Dariyapur- Kotnoor GDA Layout.
KLBUDA/2023-24/EL/WORK_INDENT5
KLBUDA/2023-24/EL/WORK_INDENT5
Open
Electrical
Two Tender Document System(Two Cover)
KLBUDA Commissioner Office Kalaburagi
4 documents required · 4 mandatory
Department Registration Details
Total value of civl engineering works executed and payments received in the last five years (year-wise)
List of existing commitments and ongoing work
List of works for which tenders already submitted
Banker Details
Satisfactorily completed at least 50% of the contract value as prime contractor at least one similar work
Contractors registered in Chief Electrical Inspectorate Class One & above Electrical contractor
GST registration
If the bidder quoted lessor/below rate than the amount put to tender, he has upload difference amount less DD/FDR
₹500
₹4,570
5 Nov 2023
5 Nov 2023
21 Nov 2023
16 Nov 2023
Shifting of Distribution Transformer Center coming in the Plot No. 1640/A of Dariyapur- Kotnoor GDA Layout.
Material cost of 2 pin cross arm with pole clam
Material cost of 4 pin cross arm with pole clam
Material cost of 11 kV Horizontal cross arm wit
Material cost of 9 Mtr RCC DP Set Transformer structure
Material cost of 8 SWG G.I. Wire
Material cost of 7/10 SWG Guy Wire
Material cost of Earthing Materials Type for ground
Material cost of 11kV, 5KN Composite/Polymeric
Material cost of No. 8 Strain insulator
Material cost of A1 Lead Wire(120Sqmm)
Labour Cost for100 KVA TC
Labour Cost for (a) Wiring of One circuit of LT wiring Kit for 25/63/100 KVA DTC to the existing LT protection Kit/ Distribution box.
Labour Cost for (b) Erection of 100 KVA transformer on Transformer structure.
Labour Cost for Errection of H Frame.
Labour Cost for Fixing DOLO cutouts / Horn Gap Fuses including fixing of cross arms and wiring
Labour Cost for Fixing LT Distribution box for 100 /250 / 500 KVA DTCs (Excluding wiring)
Labour Cost for Fixing of GOS including wiring(11KVSB 200A)
Labour Cost for Providing chain link fencing 50 mm size of 8 guage properly stretched between rectangular poles and fixed with suitable bolts and nuts, the free ends shall be welded to the pole and bl...
Labour Cost for Releasing of (a) wiring of one circuit of LT wiring Kit for for 25/63/100 KVA DTC to the existing LT protection Kit/Distribution Box via metering box.
Labour Cost for Releasing of 100 KVA TC
Labour Cost for Releasing of fixing DOLO cutouts / Horn Gap fuses including fixing of cross arms and wiring.
Labour Cost for Releasing of fixing LT Distribution box for 100/250/500 KVA DTCs (Excluding wiring)
Labour Cost for Releasing of fixing of GOS including wiring (11KV SB 200A)
Labour Cost for Releasing of H Frame.
Labour Cost for Releasing of pole 100to250 KVA with 9.00 Mtrs.RCCPole
Labour Cost for Releasing of providing chain link fencing 50mm size of 8 guage properly sretched between rectangular poles and fixed with suitable bolts and nuts, the free ends shall be welded to the ...
Labour Cost for Relesing of stringing of 1.1 kv grade aerial buched 3 core cable of XLPE insulation standard aluminum conductor, standard around a weather resistand black XLPE insulated AAA messenger ...
Labour Cost for Stringing of 1.1 KV grade aerial bunched 3 core cable of XLPE insulation standard aluminum conductor, standard around a weather resistant black XLPE insulated AAA Messenger wire 1.(3x9...
Labour Cost for Fixing of 2Pin cross arm with insulator and Braces fixing
Labour Cost for Fixing of 4 Pin cross arm with insulator and Braces fixing
Labour Cost for Fixing of V-Shape / Horizontal cross arm including single top support Braces and insulators fixing.
Labour Cost for Erection of Pole 100 to 250 kVA with 9 mtrs. RCC pole
Labour Cost for Erection of pole 100 to 250 kVA with 9 mtrs. RCC pole with Hard Soil
Labour Cost for Earthing Materials type for grounding
Labour Cost for Erection of pole 100 to 250 kVA with 9 mtrs. RCC pole with Hard Soil
Labour Cost for Providing GI Pipe Earthing for lightning arresters Tran sformer Neutral and Transformer Metal parts (Excluding digging of pits)
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
2 Notification.pdf
Others - Notification • 0.60 MB
e kw1 Elect.doc
Tender Document • 0.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .