| 1 | 1₹34.3 LAccepted-AOC N A | ₹34.3 L | 1 | Accepted-AOC Rate quoted to less estimate rate |
| 2 | 2₹35.3 LRejected-AOC | ₹35.3 L | 2 | Rejected-AOC Rate quoted to Above estimate rate |
| Sl No | Description | Qty | Unit | RATHAKRISHNAN R L2 | Rajagopal L1 |
|---|---|---|---|---|---|
| 1.00Construction of 100000 litter Capacity OHT Tank and Extention of Pipe Line at Sivalarpatti Village and Panchayat Under 15th FC B.Pt Savings Fund 2025 | |||||
| 2.00Earth work excavation for foundation and depositing on bank within an initial lead of 10m and an initial lift of 2m for the following classification of soil including shoring, strutting, bailing out water wherever necessary and all other incidental charges and as directed by the TWAD Board Officers. | |||||
| 3.00 | First depth of 0 to 2m | 87.5 | m³ | 271.69 ₹23,772.88 | 263.7 ₹23,073.75 |
| 4.00 | Second depth of 2 to 2.5 m | 21.88 | m³ | 284.49 ₹6,224.64 | 276.12 ₹6,041.51 |
| 5.00 | Cement concrete 1:4:8 (One cement, four sand and eight course aggregate of 40mm size hard blue granite broken stone) for levelling course including the cost of mixing, placing the concrete in position, consolidating finishing the ends complete and curing etc. complete and as directed by TWAD Board Officers for works beyond 1.50m from GL for footing. | 6.57 | m³ | 5,787.2 ₹38,021.90 | 5,616.95 ₹36,903.36 |
| 6.00Reinforced cement concrete 1:1.5:3 using 10mm and 20mm Hard Broken Stone. The rates excluding the cost of supplying, fabricating and placing in opposition of MS / RTS Grills for reinforcement and centering, strutting & shuttering, but including cost of mixing, placing the concrete in position, vibrating, consolidating, finishing and curing the concrete etc., complete and as directed by the Engineer-in-charge. (The rates inclusive of testing the reservoir for the water tightness of the structure) | |||||
| 7.00 | Below 1.50 m from GL | 21.59 | m³ | 9,765.52 ₹2.1 L | 9,478.25 ₹2.0 L |
| 8.00 | Above GL upto 4.50 m | 4.89 | m³ | 9,622.59 ₹47,054.47 | 9,339.52 ₹45,670.25 |
| 9.00 | 4.50 m upto 7.32 m | 8.62 | m³ | 9,767.89 ₹84,199.21 | 9,480.54 ₹81,722.25 |
| 10.00 | 7.32 m upto 10.98 m | 9.53 | m³ | 10,054.12 ₹95,815.76 | 9,758.35 ₹92,997.08 |
Tender Value
₹34.7 L
EMD Value
₹34,700
Closing Date
27 Jan 2026, 3:00 pmClosed
Block Development officer (BP)Pudur
Block Development officer (BP), Panchayat Union, Pudur
Construction of 100000 litter Capacity OHT Tank and Extention of Pipe Line at Sivalarpatti Village and Panchayat Under 15th FC B.Pt Savings Fund 2025-26
2026_RDTN_645177_1
BDO_BP_A3_3388_25_Dt_12.01.26
Open Tender
Civil Works
120 days
Pudur Block
As per Tender Schedule
4 documents required · 4 mandatory
₹0
₹34,700
Yes
9 Feb 2026
21 Jan 2026
27 Jan 2026
21 Jan 2026
27 Jan 2026
21 Jan 2026
Construction of 100000 litter Capacity OHT Tank and Extention of Pipe Line at Sivalarpatti Village and Panchayat Under 15th FC B.Pt Savings Fund 2025
Earth work excavation for foundation and depositing on bank within an initial lead of 10m and an initial lift of 2m for the following classification of soil including shoring, strutting, bailing out water wherever necessary and all other incidental charges and as directed by the TWAD Board Officers.
First depth of 0 to 2m
Second depth of 2 to 2.5 m
Cement concrete 1:4:8 (One cement, four sand and eight course aggregate of 40mm size hard blue granite broken stone) for levelling course including the cost of mixing, placing the concrete in position, consolidating finishing the ends complete and curing etc. complete and as directed by TWAD Board Officers for works beyond 1.50m from GL for footing.
Reinforced cement concrete 1:1.5:3 using 10mm and 20mm Hard Broken Stone. The rates excluding the cost of supplying, fabricating and placing in opposition of MS / RTS Grills for reinforcement and centering, strutting & shuttering, but including cost of mixing, placing the concrete in position, vibrating, consolidating, finishing and curing the concrete etc., complete and as directed by the Engineer-in-charge. (The rates inclusive of testing the reservoir for the water tightness of the structure)
Below 1.50 m from GL
Above GL upto 4.50 m
4.50 m upto 7.32 m
7.32 m upto 10.98 m
10.98 m upto 14.64 m
Above G.L 14.60 m
Centering for soffits of RCC members or plane surfaces including shuttering, strutting to centering and providing supports etc complete for the following members using MS sheets of size 90 cm x 60 cm BG 10 gauge stiffened with welded M.S. angles of size 25x25x3mm laid over silver oak (country wood) joist of size 10x6.5 cm (spaced @ about 90 cm c/c) and supported by casurina props of 10 to 13 cm dia (spaced at 75 cm c/c) and as directed by TWAD Board Officers.
Square Column
0 to 3.3m ht
3.30m to 4.3 ht from GL
4.30 m upto 5.30 m
5.30 m upto 6.30 m
6.30 m upto 7.30 m
7.30 m upto 8.30 m
8.30 m upto 9.30 m
9.30 m upto 10.30 m
10.30 m upto 11.30 m
11.30 m upto 11.35 m
Central circular column
0 to 3.3m ht. above G.L and below GL
3.30m to 4.3 ht from GL
4.30 m upto 5.30 m
5.30 m upto 6.30 m
6.30 m upto 7.30 m
7.30m to 8.3 ht from GL
8.30 m upto 9.30 m
9.30 m upto 10.30 m
10.30 m upto 11.07 m
Plain Surface
3.55 m above G.L.
7.35 m above G.L.
From 11.30 m to 12.30m height
Roof slab at 2.95 m above floor slab
Curved Surface
Upto 3.30m height above and below GL
Floor beam sides at 11.35m above G.L.
Supplying, fabricating and placing in position of RTS rods for reinforcement for various members including cost of steel for all RCC works as directed by TWAD Board Officers. The rate to include the cost of binding wire also.
Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putt
Fabrication, supply, delivery and fixing of outside MS Lad-der of 45cm clear wide made out of 50mm * 50mm 6mm MS angle for both sides and for steps at 30cm C/C welded jointed etc., for I staging from GL to 1st level brace (weight 4.5kg / m ) IInd and IIIrd staging upto floor slab and IVth staging from floor slab to roof top. Supply, delivery and fixing of 32 mm GI pipes medium for hand rails from I stage to IVth stage. RCC M30 Grade mix for Landing slab 5 Nos. at Ground Level- 1No. and above Ground Level 4Nos. Supply and fixing of 32mm GI pipe medium for hand rails for the Landing slab. Supplying and fixing of MS Base plate of 100mm * 100mm * 6mm thick for fixing Anchore fastener bolt for fixing of hand rails at Landing slab and MS Ladder providing locking arrangements with two coats of approved enamel paint over one coat of red oxide paint as per approved Type Design and as directed by TWAD board officers.
Supply, delivery and fixing in position of CI man hole cover and frame of size 60 x 60 cm on roof slab and as directed by the TWAD Board Officers. The manhole frame and cover should be of light duty and conforming to IS 1726/1974.
Refilling the foundation for service reservoir with excavated earth (other than sand) in layers of 15 cm thick well rammed, watering and consolidating etc., complete complying with standard specifications as directed by TWAD Board Officers
Supply and delivery of Pipe and special
65MM dia PVC GI Pipes
65MM dia GI Tee
65MM dia GI Bend
65MM dia GI Coupler
65MM dia GI Union
65MM dia GI Elbow
65MMx50MM dia GI Reducer
65MM dia GM Gate Valve
50MM dia GM Gate Valve
Water supply arrangements
Supply and delivery of 63 mm pvc 4 ksc pipes for pumping main system
Earthwork excavation and depositing on bank with initial lead of 10m and lift of 2m in narrow trenches for laying of pipesin Hard stiff clay,stiff black cotton,hard red earth,shales,murram ,gravel,earth mixed with small sized boulders etc...
Laying of 63 mm pvc 4 ksc pipes to proper line and level including jointing but excluding cost of pipes
Refilling the excavated earth after laying and joining of pipes including all labour charges etc..complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for overall quoted amount (for Construction) above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_773187.xls
BOQ • 0.34 MB
TechnicalBidSivalarpatti34700.pdf
Tender Documents • 0.62 MB
Download all tender documents and submit your bid