| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 00 KHRAUTI RAMPUR BASTI BASTI UTTAR PRADESH 272124 | BASTI | UTTAR PRADESH | 272124 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Rejected-Technical 10 370 NEAR GEETA MANDIR GAS GODAM ROAD OBRA OBRA SONBHADRA UTTAR PRADESH 231219 INDIA | SONBHADRA | UTTAR PRADESH | 231219 | Rejected-Technical Character certificate not valid |
| 5 | Rejected-Technical MCF 890 F BLOCK MCF 890 SANJAY COLONY SANJAY COLONY SECTOR 23 VILLAGE TOWN FARIDABAD CITY FARIDABAD FARIDABAD HARYANA 121005 INDIA | FARIDABAD | HARYANA | 121005 | Rejected-Technical Experience and Turnover not ok |
Tender Value
₹57.7 L
EMD Value
₹1.2 L
Closing Date
17 Jan 2022, 2:00 pmClosed
Er Sunil Kumar SE OMC-II DTPS Kasimpur Aligarh
Office of the SE OMC-II DTPS Kasimpur Aligarh Mobile No 9415900792
Round the clock Routine Preventive and BDM works of Bowl Mills XRP 903 Gravimetric Raw Coal Feeders mill reject system and its compressors through PLC room Auto Manually from site and routine preventive breakdown maintenance of pneumatic CMR handling
2021_RVUNL_650568_1
ET-27/OMC-II/BMD-II/21-22
Open Tender
Repair and Maintenance Works
Fixed-rate
365 days
Office of the SE OMC-II DTPS Kasimpur Aligarh
As per Tender Documents
4 documents required · 4 mandatory
₹3,408
SAO CFA and BO HTPS KASIMPUR ALIGARH
₹1.2 L
11 Feb 2022
2 Dec 2021
19 Jan 2022
2 Dec 2021
17 Jan 2022
2 Dec 2021
2 Dec 2021 - 17 Jan 2022
Amount
Round the clock routine and preventive maintenance of Bowl mills, RC-feeders with coal mill reject system PLC Auto/Manual with air compressors etc. and ID/FD/PA/Seal air fans system of Unit No:-8 (03shift X 365 days =1095).
Round the clock routine and preventive maintenance of Bowl mills, RC-feeders with coal mill reject system PLC Auto/Manual with air compressors etc. and ID/FD/PA/Seal air fans system of Unit No:-9 (03shift X 365 days =1095).
Break-down Maintenance works of Bowl mills (XRP- 903) of Unit no-8 or 9-2X250 MW, HTPS, Kasimpur, Aligarh.
Replacement of Roller Journal assembly(One RJ assembly makes one job) ( Time of Job completion = 08 Hrs.)
Changing trunnion position of RJ assembly. (One trunnion of one mill makes one Job) ( Time of Job completion = 04 Hrs.)
Replacement of worn out grinding roll with new/healthy one, including servicing of RJ assembly.(Time of Job completion = 24 Hrs.)
Overhauling of pressure spring assembly (One spring assembly of any mill shall be considered as one quantity.) (Time of completion = 08 Hrs.)
Servicing/ repairing of spring support cover by machining/ tapping etc.(Time of completion = 08 Hrs.)
Replacement / Servicing of journal stop bolt..(Time of completion = 04 Hrs.)
Attending dust leakage from Journal opening cover. .(Time of completion = 04 Hrs.)
Replacement of bull ring segment assembly when replacement of RJ assembly has been given as separate job ( Separate job for removing and fixing of all three RJ assembly shall be given).(Time of completion = 16 Hrs.)
Replacement of bull ring segment assembly while at least one RJ assembly is inside the bowl mill.(Time of completion = 24 Hrs.)
Refitting of dislocated clamping ring/bull ring segment when replacement of RJ assembly has been given as separate job( Separate job for removing and fixing of all three RJ assembly shall be given).(Time of completion = 16 Hrs.)
Refitting of dislocated clamping ring/bull ring segment while at-least one RJ assembly is inside the bowl mill.(Time of completion = 24 Hrs.)
Replacement of airport ring assembly, when replacement of RJ assembly has been given as separate Job. Complete one set (one set consist of 06 pieces).(Time of completion = 48 Hrs.)
Repairing of airport ring assembly in installed condition when replacement of RJ assembly has been given as separate job (Separate Job for removing and fixing of all three RJ assembly shall be given).(Time of completion = 12 Hrs.)
Repairing of airport ring assembly in installed condition while at-least one RJ assembly is inside the bowl mill.(Time of completion = 12 Hrs.)
Repairing/Replacement of bowl extension ring segment, when replacement of RJ assembly has been given as a separate Job.(Time of completion = 12 Hrs.)
Repairing/Replacement of venturi, while replacement of MPO & MDV are awarded as separate Job.(Time of completion = 12 Hrs.)
Repairing/Replacement of venturi, while MPO & MDV are in their installed condition.(Time of completion = 24 Hrs.)
Repairing of venturi outlet in installed condition.(Time of completion = 08 Hrs.)
Replacement of MPO.(Time of completion = 48 Hrs.)
Replacement of MDV.(Time of completion = 24 Hrs.)
Replacement of (leaking) Victaulic coupling rubber gasket of MPO/ MDV/ transition piece.(Time of completion = 04 Hrs.)
Replacement of classifier inner cone, when replacements of RJ assemblies have been given as separate Jobs.(Time of completion = 48 Hrs.)
Fabrication and fixing of air duct vanes.(Time of completion = 08 Hrs.)
Repairing of 'O' collar assembly.(Time of completion = 06 Hrs.)
Repairing eroded portion of classifier inner cone.(Time of completion = 04 Hrs.)
Replacement/refitting/Servicing of classifier blade.(Time of completion = 04 Hrs.)
Adjustment of classifier blade operating linkage mechanism.(Time of completion = 08 Hrs.)
Replacement /Repairing of scrapper guard assembly.(Time of completion = 04 Hrs.)
Replacement of mill side liner, when replacement of RJ assembly has been given as a separate Job.(Time of completion = 24 Hrs.)
Repairing of Mill side liners by patching/welding (MS plate of thickness-10/12 mm for patching may be arranged from scrap).(Time of completion = 04 Hrs.)
Repairing/Replacement of mill side bottom liner.(Time of completion = 04 Hrs.)
Replacement of bottom insulation cover plate (complete set).(Time of completion = 24 Hrs.)
Repairing of bottom insulation cover plate.(Time of completion = 12 Hrs.)
Checking and inspection / Replacement of Labyrinth seal inside the mill liner body of mill.(Time of completion = 12 Hrs.)
Checking and inspection / Replacement of Labyrinth seal outside the mill liner body of mill.(Time of completion = 12 Hrs.)
Refitting/replacement of dislocated lower/upper skirt assembly.(Time of completion = 24 Hrs.)
Decoupling, performing alignment of mill-motor complete coupling and final coupling.(Time of completion = 12 Hrs.)
Replacement of damaged geared coupling of input shaft and distance piece with new-one (Healthy-one) and perform alignment.(Time of completion = 24 Hrs.)
Repairing of separator body, when replacement of RJ assemblies have been given as separate Jobs.(Time of completion = 24 Hrs.)
Replacement of bowl hub cover, when replacement of RJ assemblies has been given as separate Job.(Time of completion = 08 Hrs.)
Making threaded hole of any diameter on any surface of bowl mill by drilling and tapping.(Time of completion = 12 Hrs.)
Servicing of oil coolers of mills in installed condition (one cooler of one mill make one Job).(Time of completion = 24 Hrs.)
Replacement/Refitting of braided hose of lube oil pipe line.(Time of completion = 04 Hrs.)
Servicing of seal air valve on seal air header of mills.(Time of completion = 06 Hrs.)
Hard facing of bowl mill spares by 2" chequering pattern using sequence welding technique in installed condition.(Time of completion = 08 Hrs.)
Complete dense hard facing of cap of airport ring assembly & Bowl extension ring with hard facing electrode.(Time of completion = 04 Hrs.)
Fabrication and Replacement of RCF Hopper chute to center pipe of mill.(Time of completion =24 Hrs.)
Fabrication & Fitting of Guard/covering/shroud of RJ assembly housing by 8/10/ 12mm thick MS/Sailma plate.(Time of completion = 12 Hrs.)
Complete Overhauling of RJ assembly.(Time of completion = 16 Hrs.)
Servicing of Hot air gate.(Time of completion = 10 Hrs.)
Servicing of Hot air damper.(Time of completion = 10 Hrs.)
Servicing of Cold air gate.(Time of completion = 08 Hrs.)
Servicing of Cold air damper.(Time of completion = 08 Hrs.)
Attending coal/coal dust leakage from centre feed pipe/coal pipe {one patch (min size-200X200mm) make one Job)}.(Time of completion = 04 Hrs.)
Servicing of lube oil system of mills (one mill make one Job). (Time of completion = 16 Hrs.)
Servicing of oil coolers of mill lub. oil system by taking out the cooler from the lube oil system. (One cooler of one mill make one Job).(Time of completion = 48 Hrs.)
Servicing of lube oil pump of Bowl mills.(Time of completion = 08 Hrs.)
Replacement of lube oil pump of bowl mill with new /overhauled/serviced pump.(Time of completion = 04 Hrs.)
Metalizing & hard facing of clamping rings of bull ring segment (All 4 rings make one job). Metalizing welding electrode is in firm scope. Hard facing to be done with L&T 670/700 welding electrode which shall be provided by Nigam.(Time of completion = 24 Hrs.)
Repairing / Welding work in Cold air Duct/ Hot air duct. (Time of completion = 06 Hrs.)
Changing worn out coal pipe (full length or piece) / bend with new one (One pipe/bend make one Job).(Time of completion = 24 Hrs.)
Changing of worn out /damaged centre feed pipe of milling system.(Time of completion = 24 Hrs.)
Cleaning, Greasing, Servicing of electrically operated hoist (One job of one unit for fifteen days).(Time of completion = 16 Hrs.)
Servicing of all electrically operated hoist of mill site. (one unit make one job of 7+ 1 under hung crane + hoist ).(Time of completion = 40 Hrs.)
Taking out one no. complete RJ assembly from any bowl mill while taking-out journal opening cover.(Time of completion = 08 Hrs.)
Fixing of one no RJ assembly in any bowl mill when Journal opening cover is already opened.(Time of completion = 08 Hrs.)
Checking and inspection/Replacement of (If found damaged) bearings with new one of input shaft of planetary Gearbox of Bowl Mill.(Time of completion = 48 Hrs.)
Replacement of broken bolt of mill body to separator top and bottom liner.(Time of completion = 24 Hrs.)
Shifting of healthy RJ assembly from mill floor (3.5 mtr.) of unit no:- 8 to unit no:- 9 mill floor ( 3.5 mtr.) and vice versa.(Time of completion = 04 Hrs.)
Repairing and reconditioning of eroded portion of bowl (erosion due to worn-out of bull ring segment) in installed condition by metalizing, hard facing of bowl surface with bull ring segments erosion size up-to or less than 4" X 4" of 1 Segment.(Time of completion = 48 Hrs.)
Repairing and reconditioning of eroded portion of bowl (erosion due to worn-out of bull ring segment) in installed condition by metalizing, hard facing of bowl surface with bull ring segments erosion size more than 4" X 4" of 1 Segment erosion size more than 4"X4" and up-to 6"X5" of 1 Segment.(Time of completion = 72 Hrs.)
Repairing and reconditioning of eroded portion of bowl (erosion due to worn-out of bull ring segment) in installed condition by metalizing, hard facing of bowl surface with bull ring segments erosion size more than 4" x 4" of 1 Segment erosion size more than 6" X 5" of 1 Segment.(Time of completion = 96 Hrs.)
Breakdown & Maintenance / Overhauling work of Gravimetric Coal Feeders
Replacement of COC Gear Box with new/serviced gear box.(Time of completion = 08 Hrs.)
Servicing / Rectification of defects of clean out conveyor of GCF.(Time of completion = 08 Hrs.)
Servicing/repairing of span/ weigh span roller.(Time of completion = 04 Hrs.)
Repairing of end door.(Time of completion = 04 Hrs.)
Servicing/repairing of air operated feeder outlet gate. (Time of completion = 08 Hrs.)
Servicing /repairing of manual Feeder inlet gate/bunker outlet gate.(Time of completion = 08 Hrs.)
Servicing of seal air valve of GCF. (Time of completion = 08 Hrs.)
Servicing of defective COC Drive (Quadruple Helix-worm unit).(Time of completion = 15 Hrs.)
Replacement /Repairing of belt scrapper. (Time of completion = 04 Hrs.)
Attending dust leakage from GCF body by welding/patching etc.(Time of completion = 04 Hrs.)
Servicing/Overhauling of Gravimetric Coal Feeder Main gear box.(Time of completion = 12 Hrs.)
Replacement / Servicing of Gravimetric Coal Feeder Head Pulley/power pulley/take-up pulley.(Time of completion = 08 Hrs.)
Servicing of Gravimetric Coal Feeder.(Time of completion = 16 Hrs.)
Servicing of clutch assembly.(Time of completion = 08 Hrs.)
Replacement of damaged feeder belt with new one of Gravimetric Coal Feeder.(Time of completion = 24 Hrs.)
Replacement of Main Gear Box of GC Feeder with new/serviced gear box.(Time of completion = 08 Hrs.)
Replacement of clutch assembly of GC Feeder with new/serviced.(Time of completion = 08 Hrs.)
Repairing/Replacement of grating of various sizes.(Time of completion = Hrs./m².)
Break-down maintenance of ID fans:-
Servicing of ID Fan.(Job completion time:- 96 Hrs.)
Replacement of thrust pads and DE side bearing. (Job completion time:-16 Hrs.)
Replacement of NDE side bearing. (Job completion time:-08 Hrs.)
Replacement of ID fan impeller/shaft.(Job completion time:-48 Hrs.)
Servicing of IGV. (Job completion time:-08 Hrs.)
Replacement of liner blades. (Job completion time:-48 Hrs.)
Repairing of impeller casing (Job completion time:-08 Hrs.)
Cleaning of impeller casing (Job completion time:-08 Hrs.)
Checking and servicing of NDE bearings. (Job completion time:-16 Hrs.)
Checking and servicing of DE bearings. (Job completion time:-16 Hrs.)
Alignment of ID fan hydraulic coupling with motor. (Job completion time:-16 Hrs.)
Alignment of ID fan with hydraulic coupling. (Job completion time:-16 Hrs.)
Servicing of hydraulic coupling of oil cooler (One cooler makes on Job).
Servicing of lube oil cooler. (Job completion time:-08 Hrs.)
Installation of new/healthy lube oil pump. (Job completion time:-04 Hrs.)
Replacement of mechanical seal/bearing/replacement of cartridge of lube oil pump (Job completion time:- 04 Hrs.)
Checking/servicing of lube oil system. (Job completion time:-08 Hrs.)
Checking/servicing of outlet/inlet gate. (Job completion time:-08 Hrs.)
Servicing of hydraulic coupling. (Job completion time:-24 Hrs.)
Replacement of impeller sealing ring.(Job completion time:-32 Hrs.)
Repairing of impeller sealing ring. (Job completion time:-04 Hrs.)
Servicing of Duct blower (Job completion time:-08 Hrs.)
Break-down maintenance of FD fans:-
Servicing of FD fan.(Job completion time:-48 Hrs.)
Dismantaling and mounting of shaft with bearing assembly. (Job completion time:-32 Hrs.)
Changing/servicing of oil seal of DE/NDE side bearing. (Job completion time:-16 Hrs.)
Arresting leakage from oil pipe hose and cable of the temperature probe from the main bearing assembly. (Job completion time:-08 Hrs.)
Checking/changing of blade shaft bearing. (Job completion time:-48 Hrs.)
Assembly of the blade and the adjusting lever. (Job completion time:-32 Hrs.)
Changing/servicing of impeller servomotor. (Job completion time:-08 Hrs.)
Checking and servicing of damper. (Job completion time:-08 Hrs.)
Servicing of Lube oil system.(Job completion time:-08 Hrs.)
Servicing of Lube oil pump. (Job completion time:-08 Hrs.)
Coupling alignment of fan with motor. (Job completion time:-08 Hrs.)
Checking/changing shim of connecting rod between control head and limit switch of fan. (Job completion time:-04 Hrs.)
Servicing of Lube oil cooler. (Job completion time:-08 Hrs.)
Break-down maintenance of PA fans:-
Servicing of PA fan. (Job completion time:-36 Hrs.)
Dismantaling and mounting of shaft with bearing assembly. (Job completion time:-32 Hrs.)
Changing/servicing of oil seal of DE/NDE side bearing. (Job completion time:-16 Hrs.)
Arresting leakage from oil pipe hose and cable of the temperature probes from the main bearing assembly. (Job completion time:-08 Hrs.)
Checking/changing of blade shaft bearing.(Job completion time:-48 Hrs.)
Assembly of the blade and the adjusting lever. (Job completion time:-08 Hrs.)
Changing/servicing of impeller servomotor.(Job completion time:-08 Hrs.)
Servicing of Lube oil system.(Job completion time:-08 Hrs.)
Servicing of Lube oil pump.(Job completion time:-08 Hrs.)
Checking/servicing of outlet gate.(Job completion time:-08 Hrs.)
Coupling alignment of fan with motor.(Job completion time:-08 Hrs.)
Checking/changing shim of connecting rod between control head and limit switch of fan(Job completion time:-04 Hrs.)
Servicing of lube oil cooler.(Job completion time:-08 Hrs.)
Break-down maintenance of seal air fans:-
Servicing of seal air fan.(Job completion time:-16 Hrs.)
Performing alignment with motor. (Job completion time:-08 Hrs.)
Replacement of NDE bearing.(Job completion time:-08 Hrs.)
Replacement of DE bearing. (Job completion time:-08 Hrs.)
Checking/servicing of DE/NDE side bearing. (Job completion time:-08 Hrs.)
Cleaning of suction filter. (Job completion time:-08 Hrs.)
Replacement/repairing/static balancing of impeller. (Job completion time:-08 Hrs.)
Servicing of suction valve/suction damper. (Job completion time:-04 Hrs.)
Servicing of discharge damper.(Job completion time:-08 Hrs.)
Servicing of Hoist:-
Servicing of PA/FD fan hoist (Capacity- 3.5Ton). (Job completion time:-08 Hrs.)
Servicing of PA/FD fan hoist (Capacity- 12.5 Ton).(Job completion time:-08 Hrs.)(Job completion time:-08 Hrs.)
Servicing of ID fan hoist (Capacity- 12.5 Ton) (Job completion time:-08 Hrs.)
Repairing/replacement of ID/FD/PA/Seal air fan ducts. (Job completion time:-01 M/ Hr.)
F A CONSTRUCTION
Abhishek Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .