Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
6 Jan 2022, 2:30 pmClosed
SR MANAGER
VALLUR THERMAL POWER PROJECT NTECL CHENNAI
RESTORATION OF SAGGED GALLERY OF BCN 8AB CONVEYOR BETWEEN TR17 AND TR18
2021_NTECL_99937_1
CS-4958
Limited
Miscellaneous Works
Works
30 days
NTECL CHP ARAEA
AS PER TENDER DOCUMENTS
2 documents required · 2 mandatory
₹0
Exempted
6 Jan 2022
29 Dec 2021
6 Jan 2022
29 Dec 2021
6 Jan 2022
31 Dec 2021
29 Dec 2021 - 30 Dec 2021
Amount
Mobilization Charges
Gallery Structure Strengthening
Dismantling of existing Side Truss and Fabrication, Painting & Erection of New Side Truss Structures including crane charges
Drawing Detailing and Structure Stability Certification Charges
Repair / Restoration of roof rafter in required areas
De-Mobilization Charges
Crane Deployment ,Mobilization, demobilization and service Cost
M/S.KUTTY BROTHERS
SONALI CONSTRUCTIONS
AKASH ENGINEERING SERVICES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .