| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.7 LAccepted-AOC TUTICORIN | TUTICORIN | TAMIL NADU | 626202 | ₹4.7 L Quoted ₹5.9 L | L1 | Accepted-AOC L1 |
| 2 | L2₹6.1 LRejected-AOC | ₹6.1 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | RAMESH ENGIEERING CONTRACTOR | DURAIMANI ENGINEERING CONTRACTOR |
|---|---|---|---|---|---|
| 1.00 | Charges for dismantling the worn out 90° bend providing temporary supports wherever required to arrest the coal pipe cutting lifting removing and lowering the bend to ring header platform renewing the 90° bend or patch welding of bends by providing 12mm thick plate to the required profile and welding with good quality welding rod, lifting, positioning aligning and assembling the bends removal of temporary supports devolution of released material to stores. This includes hire charges for T & Ps and cost of consumables. | 5 | Nos | 2,30,500 ₹2.7 L | 2,32,000 ₹2.7 L |
| 2.00 | Charges for arresting the coal pipe firmly, dismantling the eroded ceralin (Less than 90°) or MS bend by gas cutting, lowering the bends to the respective floor, assembling the new bend by welding after setting alignment and removing all coal pipe supports including charges for scaffolding. | 6 | Nos | 1,19,400 ₹1.4 L | 1,21,200 ₹1.4 L |
| 3.00 | Charges for making scaffolding arrangements and landing platform at the bottom of the coal pipe at 14 mtr height at boiler corner 1 & 4 for easy dismantling and assembling the coal pipe. The dismantling of scaffolding arrangements supports and landing platform. | 1 | No | 25,000 ₹29,500 | 25,500 ₹30,090 |
| 4.00 | Charges for arresting the coal pipe firmly, dismantling the Victaulic coupling and removing the fuel inlet elbow and placing it in the nearest elevation. | 12 | Nos | 58,200 ₹68,676 | 60,000 ₹70,800 |
| 5.00 | Charges for lifting the reconditioned or new elbows after inspecting / renewing the kicker block and assembling of the same with victualic coupling and removing all coal pipe supports including transporting of new bends from the stores and devolution of old bends to the stores. | 12 | Nos | 70,200 ₹82,836 | 72,000 ₹84,960 |
| 6.00 | Dismantling of coal pipes of varied lengths before fuel inlet elbows and assembling back with old / new coal pipes. | 12 | Nos | 88,800 ₹1.0 L | 94,800 ₹1.1 L |
Tender Value
Refer Docs
EMD Value
₹5,200
Closing Date
30 Dec 2025, 2:00 pmClosed
CE/TTPS
O/o CE/TTPS
TTPS Operation Circle MPM I Unit II Overhauling of worn out fuel inlet elbows special bends coal pipes and Orifices in boiler corner 3 and 4 during the forthcoming overhaul
2025_EB_632288_1
CE/SE/O/TTPS/Spec.No.254/25-26
Open Tender
Miscellaneous Works
25 days
TTPS
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹5,200
Yes
25 Mar 2026
15 Dec 2025
31 Dec 2025
15 Dec 2025
30 Dec 2025
15 Dec 2025
Charges for dismantling the worn out 90° bend providing temporary supports wherever required to arrest the coal pipe cutting lifting removing and lowering the bend to ring header platform renewing the 90° bend or patch welding of bends by providing 12mm thick plate to the required profile and welding with good quality welding rod, lifting, positioning aligning and assembling the bends removal of temporary supports devolution of released material to stores. This includes hire charges for T & Ps and cost of consumables.
Charges for arresting the coal pipe firmly, dismantling the eroded ceralin (Less than 90°) or MS bend by gas cutting, lowering the bends to the respective floor, assembling the new bend by welding after setting alignment and removing all coal pipe supports including charges for scaffolding.
Charges for making scaffolding arrangements and landing platform at the bottom of the coal pipe at 14 mtr height at boiler corner 1 & 4 for easy dismantling and assembling the coal pipe. The dismantling of scaffolding arrangements supports and landing platform.
Charges for arresting the coal pipe firmly, dismantling the Victaulic coupling and removing the fuel inlet elbow and placing it in the nearest elevation.
Charges for lifting the reconditioned or new elbows after inspecting / renewing the kicker block and assembling of the same with victualic coupling and removing all coal pipe supports including transporting of new bends from the stores and devolution of old bends to the stores.
Dismantling of coal pipes of varied lengths before fuel inlet elbows and assembling back with old / new coal pipes.
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.25 MB
BOQ_756472.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid