Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-Finance | ₹8.4 L | L1 | Accepted-Finance FINANCIALLY ACCEPTED |
| 2 | L2₹8.4 LRejected-Finance | ₹8.4 L | L2 | Rejected-Finance FINANCIALLY REJECTED |
Tender Value
₹8.0 L
EMD Value
₹15,941
Closing Date
30 Jun 2026, 3:00 pmClosed
V P SARPANCH
V P PALIEM PERNEM GOA
Construction of Protection wall from Devanand Gawandi house to Hanumant Gawandi house in Ward No. 6 Bhandarwada in V.P. Paliem
2026_VP_29855_1
VP/Paliem/PER/e-Tender Notice/2026-27/151
Open Tender
Civil Works
Percentage
90 days
V P PALIEM PERNEM GOA
AS PER TENDER NOTICE
2 documents required · 2 mandatory
₹5,000
₹15,941
3 Jul 2026
19 Jun 2026
3 Jul 2026
19 Jun 2026
30 Jun 2026
19 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earthwork in excavation by mechanical means (hydraulic excavator)/manual means in foundation pipeline trenches drain (not exceeding 1.5 m in width or 10 sq.m. on plan) including dressing of sides and ramming of bottoms, lift upto 1.5 m including getting out the excavated soil and disposal of surplus excavated soil as directed within a lead of 50 m.dressed in: | |||||
| 1.01 | All kinds of soil | 136.8 | cu.m | 291 | ₹39,808.8 |
| 2 | Transportation and carriage of excavated earth by tipper truck for a distance of 5 km including loading unloading and staging | 109.44 | cu.m | 252.26 | ₹27,607.33 |
| 2.01 | Rubble packing with hard laterite stone under floors including watering ramming and consolidating etc. in pipeline trenches and other foundations complete. | 11.4 | cu.m | 2,211 | ₹25,205.4 |
| 3Providing & laying cement concrete 1:3:6 (1 cement : 3 coarse sand : 6 graded granitic or basaltic stone aggrt. 40 mm. nominal size) excluding cost of centering, shuttering and finishing in: | |||||
| 3.01 | All works upto plinth level | 86.07 | cu.m | 6,192 | ₹5,32,945.44 |
| 4Centering & shuttering including Strutting, Propping & removal of form for : | |||||
| 4.01 | Foundations, Footings, Base for columns | 319.2 | sq.m | 407 | ₹1,29,914.4 |
| 5Providing and fixing weepholes with rigid PVC make laid in position with a required slope and level while layingpipes of approved the oncrete of retaining wall,wing wall and earth retainig structure complete as directed by the Engineer in charge | |||||
| 5.01 | B) 75 mm dia | 39.2 | rmt | 185 | ₹7,252 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.81 MB
BOQ_30279.xls
BOQ • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].