Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹1.1 CrAccepted-AOC FLAT NO 02 KAPIL VIHAR NEAR BANAVEDI DHANA ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | ₹1.1 Cr Quoted ₹70.4 L | 1 | Accepted-AOC Accept |
Tender Value
₹78 L
EMD Value
₹1.6 L
Closing Date
8 Oct 2022, 1:00 pmClosed
Superintending Engineer
I.W.C. Mathura
Construction of V.R.B.
2022_UPIDC_729042_6
02/S.E./2022-23
Open Tender
Civil Works
Item Rate
180 days
I.W.C. Mathura
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,134
₹1.6 L
10 Nov 2022
1 Oct 2022
8 Oct 2022
1 Oct 2022
8 Oct 2022
1 Oct 2022
Amount
Earth/ work in excavation in foundation in all type of soil with all cost of labour and T&P etc.complete.
P/Laying c.c 1:3:6(M-10grade) in foundation with all cost of labour and T&P etc.complete.
P/Laying c.c 1:2:4(M-15grade) in foundation with all cost of labour and T&P etc.complete.
First class Brick work in 1:4 cement mortor with cement and coarse sand i/c all cost of labour and T&P etc.complete.
P/Laying R.C.C.1:1:2 (M-25grade) with stone grite(crushed aggregate) i/c all cost of labour and T&P etc.complete.
Centering and shuttering for V.R.B. C.C & R.C.C. work including cost of material, labour T&P etc.complete
Struck deep cement pointing in 1:2 cement mortar i/c with all cost of material, labour and T&P etc complete
P/L300 mm thick Boulder pitching on U/S&D/S of bridge in side slope boulder lining including with all cost of material, labour T&P etc complete
S/L Local sand filling in bed& in side slop including all cost of material, labour T&P etc complete
Making&filling construction joint filled with sealing compound including all cost of material, labour T&P etc complete
S/F 75 mm dia p.v.c.pipe for weep holes including all cost of material, labour T&P etc complete
5.00 H.P.Diesel pump set dewatering for construction of VRB. Foundation assume 16 hrs average per day for 15 days for work .
S/Laying steel reinforcement in R.C.C work including cutting bending binding & placing with cost of material, labour T&P etc.complete.
Earth Work in Filling in cutting including lead upto 600 M & lift upto 1.5M with compaction including dressing by Manual Labour including all cost of labour & T&P etc
Colour Washing Two coat including Cost of all material & T&P etc required for proper completion of work
Providing and fixing steel sign board at VRB i/c earth work ,excavation ,carriage, painting, letter writing and errect with c. c. i/c cost of material, labour and T&P etc.
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .