Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.9 LAdmitted-Fee/PreQual/Technical/Finance | L1 | Admitted-Fee/PreQual/Technical/Finance | |
| 2 | L2₹7.1 L+₹20,513.14 (2.97%)Admitted-Fee/PreQual/Technical/Finance | L2 | Admitted-Fee/PreQual/Technical/Finance | |
| 3 | L3₹7.5 L+₹63,172.26 (9.14%)Admitted-Fee/PreQual/Technical/Finance | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | LION BUILDERS L2 | YAHWEH CONSTRUCTIONS L1 | S SENTHAMILSELVAN L3 |
|---|---|---|---|---|---|---|
| 1.00 | Dismantling RCC as per the instruction of Departmental officers. | 14 | m3 | 4,310.39 ₹60,356.17 | 4,000 ₹56,010 | 900 ₹12,602.25 Lowest |
| 2.00 | Desilting the existing drain as per the instruction of Departmental officers. Including all initial lead and other labour charges. | 2,120.99 | m3 | 108.92 ₹2,31,021.09 Lowest | 110 ₹2,33,309.45 | 115 ₹2,43,914.42 |
| 3.00 | Supplying and fabricating and placing in postion MS or RTS Bar reinforcement to all RCC Works as per the
design given including cost of steel and bending wire also all floors. | 10 | Qtl | 8,109.35 ₹81,093.5 | 8,000 ₹80,000 | 7,500 ₹75,000 Lowest |
| 4.00 | Supply of RCC precast slab 150mm thick in C.C. 1:1.5:3mix using 20m baby jelly including water curing, moulding charges etc., complete. Size of slab andvolume of concrete | 94 | m2 | 1,299.53 ₹1,22,155.92 | 1,100 ₹1,03,400 Lowest | 1,800 ₹1,69,200 |
| 5.00 | RemovalofExcavatedExcessEarthawayfromthesiteto5K.Mincluding loading and transportation charges etc, complete as per standard specification. For 1M3 | 2,135 | m3 | 88.39 ₹1,88,722.68 | 100 ₹2,13,499.75 | 85 ₹1,81,474.79 Lowest |
| 6.00 | Removing the Rcc Precast slab and labour for Conveying the Excvated Silt Including all initial lead and other labour charges. | 48 | Day | 587.15 ₹28,182.98 | 100 ₹4,800 Lowest | 1,500 ₹72,000 |
Tender Value
₹10 L
EMD Value
₹10,000
Closing Date
12 Oct 2026, 3:00 pmClosed
The Assistant Commissioner, Central zone
Central zone, Coimbatore Corporation
Desilting of Drain and providing of Covering Slab at GandhiNagar in ward no . 65 at Central Zone
2026_MAWS_709944_16
E4/2026 Central zone
Open Tender
Civil Works
Works
90 days
Coimbatore corporation-
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹10,000
13 Oct 2026
1 Oct 2026
13 Oct 2026
1 Oct 2026
12 Oct 2026
1 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Dismantling RCC as per the instruction of Departmental officers. | 14 | m3 | - | - |
| 2 | Desilting the existing drain as per the instruction of Departmental officers. Including all initial lead and other labour charges. | 2,121 | m3 | - | - |
| 3 | Supplying and fabricating and placing in postion MS or RTS Bar reinforcement to all RCC Works as per the
design given including cost of steel and bending wire also all floors. | 10 | Qtl | - | - |
| 4 | Supply of RCC precast slab 150mm thick in C.C. 1:1.5:3mix using 20m baby jelly including water curing, moulding charges etc., complete. Size of slab andvolume of concrete | 94 | m2 | - | - |
| 5 | RemovalofExcavatedExcessEarthawayfromthesiteto5K.Mincluding loading and transportation charges etc, complete as per standard specification. For 1M3 | 2,135 | m3 | - | - |
| 6 | Removing the Rcc Precast slab and labour for Conveying the Excvated Silt Including all initial lead and other labour charges. | 48 | Day | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.11 MB
BOQ_853229.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .