Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹18.9 LAccepted-AOC | ₹18.9 L | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹20.7 L+₹1.8 L (9.51%)Rejected-Finance VILL DANGWAR PO DANGWAR P S HUSSAINABAD JAPLA PALAMU JHARKHAND 822116 | JAPLA | PALAMU | JHARKHAND | 822116 | ₹20.7 L+₹1.8 L (9.51%) | L2 | Rejected-Finance Non L1 Bidder |
| 3 | L3₹21.6 L+₹2.7 L (14.5%)Rejected-Finance | ₹21.6 L+₹2.7 L (14.5%) | L3 | Rejected-Finance Non L1 Bidder |
| 4 | L4₹25.7 L+₹6.8 L (36.2%)Rejected-Finance VILL MARANG LOIYA AT BALUMATH BLOCK COLONY PO BALUMATH PS BALUMATH DIST LATEHAR JHARKHAND 829202 | BALUMATH | LATEHAR | JHARKHAND | 829202 | ₹25.7 L+₹6.8 L (36.2%) | L4 | Rejected-Finance Non L1 Bidder |
| 5 | L5₹27.2 L+₹8.3 L (44.0%)Rejected-Finance AT PO DAKRA KHALARI DIST RANCHI JHARKHAND PIN 829210 | RANCHI | JHARKHAND | 829210 | ₹27.2 L+₹8.3 L (44.0%) | L5 | Rejected-Finance Non L1 Bidder |
Tender Value
₹32.8 L
EMD Value
₹41,000
Closing Date
10 Mar 2026, 6:00 pmClosed
SO(C) Rajhara Area
GENERAL MANAGER RAJHARA AREA, CHANDWA
Renovation of B-03 and B-04 quarters at ROCP, Rajhara Area
2026_CCL_354821_1
SO(C)/RA/e-tender/42/25-26/587 dt-27.02.2026
Open Tender
Civil Works - Others
Percentage
100 days
Rajhara OCP
As per NIT
7 documents required · 7 mandatory
₹41,000
2 Jul 2026
27 Feb 2026
12 Mar 2026
28 Feb 2026
10 Mar 2026
28 Feb 2026
28 Feb 2026 - 7 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Dismantlingoldplasterorskirtingrakingout jointsandcleaningthesurfaceforplaster includingdisposalofrubbishtothedumpingground within 50 metres lead. | 1 | sqm | 33.2 | ₹33.17 |
| 1.02 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. | 1 | cum | 1,238.3 | ₹1,237.06 |
| 1.03 | Demolishing cement concretemanually/bymechanicalmeans includingdisposal ofmaterial within50metres leadasper directionof Engineer - in - charge. | - | cum | 903.85 | - |
| 1.04 | DemolishingR.C.C.workmanually/bymechanicalmeans includingstackingof steelbarsanddisposalofunserviceablematerialwithin50 metres lead as per direction of Engineer - in- charge. | - | cum | 2,136.7 | - |
| 1.05 | Earthworkinexcavationbymechanicalmeans(Hydraulicexcavator)/manualmeansinfoundationtrenchesordrains(notexceeding1.5m inwidthor10sqmonplan), includingdressingof sidesandrammingof bottoms, forall lift, includinggettingout theexcavatedsoil and disposal of surplus excavated soil as directed, within a lead of 50 m. 2.8.1 All kinds of soil. | 1 | cum | 205.8 | ₹205.59 |
| 1.06 | Providing and laying in position cement concrete ofspecifiedgradeexcludingthecostofcenteringandshuttering-Allworkuptoplinth level : 1:4:8(1 Cement :4coarsesand(zone-Ill)derivedfromnaturalsources:8gradedstoneaggregate40mmnominal sizederivedfromnatural
sources) | 1 | cum | 6,072.4 | ₹6,066.33 |
| 1.07 | Providingandlayinginpositionspecifiedgradeof reinforcedcementconcrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3(1cement:1.5coarsesand(zone-Ill)derivedfromnaturalsources:3gradedstoneaggregate20mmnominalsizederivedfromnatural
sources) | - | cum | 8,343.45 | - |
| 1.08 | Reinforcedcementconcreteworkinwalls(anythickness), includingattachedpilasters,buttresses,plinthandstringcourses, fillets,columns, pillars,piers,abutments,postsandstrutsetc.aboveplinthleveluptofloorfive level, excluding costofcentering, shuttering, finishing and reinforcement: 5.2.2 1:1.5:3(1cement:1.5coarsesand(zone-III)derivedfromnaturalsources:3gradedstoneaggregate20mmnominalsizederivedfromnatural sources) | - | cum | 9,466 | - |
| 1.09 | Reinforcedcementconcreteworkinbeams,suspendedfloors, roofshavingslopeupto15degreelandings,balconies,shelves,chajjas, lintels, bands,plainwindowsills,staircasesandspiralstaircasesaboveplinthleveluptofloor fivelevel,excludingthecostofcentering,shuttering, finishingandreinforcementwith1:1.5:3(1cement:1.5coarsesand(zone-III)derivedfromnaturalsources:3gradedstoneaggregate20mm nominal size derived from natural sources). | 1 | cum | 9,829.55 | ₹9,819.72 |
| 1.1 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inpositionandbindingall completeuptoplinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more. | - | kg | 105.6 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_367655.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.57 MB
BOQ_367655.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .