Loading…
Loading…
Tender Value
₹3.3 Cr
EMD Value
₹1.7 L
Closing Date
30 Sept 2026, 5:00 pm7d left
Superintending Engineer, (P.M.G.S.Y.) Pune Region,
Superintending Engineer, (P.M.G.S.Y.) Pune Region, Pune, New Administrative Building, 3rd Floor, Near Council Hall, Pune
Construction and Maintenance of Bridge on Road Ch 2/410 across Local River on MRL 23 Dahiwadi to Ranpingali Kh Road Tal Man Dist.Satara
2026_CEMAH_149562_2
E-Tender NO.05/2026-27
Open Tender
Civil Works - Bridge Construction
Percentage
365 days
Satara
AS Per NIT and SBD
8 documents required · 8 mandatory
₹11,800
₹1.7 L
Superintending Engineer, (P.M.G.S.Y.) Pune
21 Sept 2026
21 Sept 2026
1 Oct 2026
21 Sept 2026
30 Sept 2026
21 Sept 2026
23 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Clearing and Grubbing Road Land
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. In area of non-thorny jungle. By Mechanical Means.as directed by Engineer in Charge. | 0.1 | Hectare | 31,293.3 | ₹3,129.33 |
| 2 | Dismantling Stone Masonry
Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. Rubble Stone Masonry in Cement Mortar.as directed by Engineer in Charge. | 33.4 | Cubic Meter | 635.75 | ₹21,234.05 |
| 3 | Removing all types of Hume pipes
Removing all types of Hume pipes and stacking within a lead of 1000 m including Earthwork and Dismantling of Masonry Works as per Technical Specification Clause 202. Above 600 mm to 900 mm dia Hume pipe.as directed by Engineer in Charge. | 8.4 | Running Meter | 620.5 | ₹5,212.2 |
| 4 | Dismantling of Cement Concrete Pavements
Dismantling of cement concrete pavements by mechanical means using pneumatic tools breaking to pieces not exceeding 0.02 cum in volume and stock piling at designated locations and disposal of dismantled materials upto a lead of 1000 m, stacking serviceable and unserviceable materials separately.as directed by Engineer in Charge. | 12.6 | Cubic Meter | 2,462 | ₹31,021.2 |
| 5 | Construction of Embankment with Material Obtained from Borrow Pits
Construction of embankment with approved material obtained from borrow pits with a lift upto 1.5 m, transporting to site, spreading, grading to required slope and compacting to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5.as directed by Engineer in Charge. | 3,265.8 | Cubic Meter | 710.05 | ₹23,18,881.29 |
| 6 | Excavation in Soil using Hydraulic Excavator and Tippers with disposal upto 1000 m
Excavation for roadwork in soil with hydraulic excavator of 0.9 cum bucket capacity including cutting and loading in tippers, trimming bottom and side slopes, in accordance with requirements of lines, grades and cross-sections, and transporting to the embankment location with a lift upto 1.5 m and lead upto 1000 m as per Technical Specification Clause 302.3.as directed by Engineer in Charge. | 487.44 | Cubic Meter | 80.25 | ₹39,117.06 |
| 7 | Construction of Subgrade and Earthen Shoulders
Construction of subgrade and earthen shoulders with approved material obtained from borrow pits with all lifts and leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of Table 300.2 with lead upto 1000 m as per Technical Specification Clause 303.1.as directed by Engineer in Charge. | 88.46 | Cubic Meter | 818.25 | ₹72,382.39 |
| 8 | Granular Sub-base
Construction of granular sub-base by providing well graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with smooth wheel roller to achieve the desired density, complete as per Technical Specification Clause 401. For Grading II Material.as directed by Engineer in Charge. | 183.88 | Cubic Meter | 2,293.4 | ₹4,21,710.39 |
| 9 | WBM Grading 2
Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing, rolling with smooth wheel roller 80-100 kN in stages to proper grade and camber, applying and brooming, stone screening/binding materials to fill-up the interstices of coarse aggregate, watering and compacting to the required density grading 2 as per Technical Specification Clause 405. By Mechanical Means.as directed by Engineer in Charge. | 105 | Cubic Meter | 2,578.6 | ₹2,70,753 |
| 10 | DLC
Construction of dry lean cement concrete Sub- base over a prepared sub-grade with coarse and fine aggregate ( natural sand/ VSI grade finely washed crushed sand) conforming to IS: 383, the size of coarse aggregate not exceeding 25 mm, , cement content not to be less than 150 kg/ cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant/ Weigh batch mixer, transported to site with all leads and lifts, laid with a paver with electronic sensor /by suitable means as approved by Engineer-in-charge , compacting with vibratory roller, finishing, curing and including preparation of subgrade surface if required etc. complete. as directed by Engineer in Charge. | 146.28 | Cubic Meter | 4,031.1 | ₹5,89,669.31 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.55 MB
BOQ_235808.xls
BOQ • 0.36 MB
01_STR_GAD_Ranpingali.pdf
Tender Documents • 2.09 MB
3.Maintenance MH- Ranpingali.pdf
Tender Documents • 0.22 MB
4_Specification_Maint_MH- Ranpingali.pdf
Tender Documents • 0.09 MB
4_Specification_Work Portion_MH- Ranpingali.pdf
Tender Documents • 0.24 MB
5. Main BOQ_MH- Ranpingali.pdf
Tender Documents • 0.10 MB
6.MH- Ranpingali_Royalty Statement.pdf
Tender Documents • 0.15 MB
SBDMH27402.pdf
Tender Documents • 2.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .