Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.9 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹37.6 L+₹2.7 L (7.61%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | Rejected-Technical | - | Rejected-Technical Contractor has not sumit the original EMD and DD at the time of opening of techical bid Hence his bid is declared non responsive by the committee members |
Tender Value
₹27.7 L
EMD Value
₹49,100
Closing Date
29 Feb 2020, 10:30 amClosed
EE B and R Division HPPWD Soaln
Near New Bus Stand Solan
SH providing and laying renewal coat by providing Bitumenous concrete including road marking C/o side drain
2020_PWD_35100_1
16203-10 dated 04.022020 AMP kandaghat Hathon road
Open Tender
Civil Works
Item Rate
60 days
Solan
Please refer Tender documents.
10 documents required · 10 mandatory
₹1,500
EE B and R Division HPPWD Solan
₹49,100
27 Jul 2020
15 Feb 2020
29 Feb 2020
15 Feb 2020
29 Feb 2020
15 Feb 2020
Amount
Earthwork in excavation for all type of road structures such as retaining wall, breast wall, culvert, drain and parapets etc. in all type of classification of soil comprising of ordinary soil, ordinary rock, hard rock chiesling / wedging out rocks (where blasting is prohibeted) true to lines and grades. Dimesions and other particulars as per drawing and Technical Specification Clause 305.1(Three hundred Five point One) including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto all lead and lifts including dressing of sides and bottom and backfilling in trenches with excavated suitable material. All work of excavation by blasting shall be carried out by taking all necessary precautions against soil erosions, damage to hill side, water pollutions etc., and to protect stability of hill side rock. Stacking of materials useful for construction at suitable sites and safe disposal of unserviceable excavated materials in specified manners to dumping site (to be arranged by the contractor), trimming, filling of unevenness blindages and finishing of the road to specified dimensions or as directed by the Engineer-in-Charge. Any loss to the public or private property during the course of execution shall be the sole responsibility of the contractor, which shall have to be duly compensated by him at his own cost of all cases.
Providing and laying plain cement concrete Grade M- 10 (Ten) nominal mix 1:3:6 (one cement isto three sand isto six graded crushed hard stone aggregate 20mm ( twenty millimetre) nominal size) mechanically mixed, vibrated and curing complete in open foundations including form work as per drawings and MORDTechnical Specifications Clause 802, 803, 1202 and 1203 (Eight hundred two, eight hundred three, one thousand two hundred two and one thousand two hundred three) and as per the direction of the Engineer-in-Charge including carriage of material through all modes of transportation within all leads and lifts and other incidentals.
Construction of penetration macadam 50 (fifty) milimetres thick over prepared base by providing a layer of compacted crushed coarse aggregate 40 (forty) milimetres size hand broken @ 0.06 cum (zero point zero six cubic metres) per square metre and 12 mm (twelve milimetres) size stone chips @ 0.018 cum (zero pint zero one eight) per square metre using chips spreader with alternate applications of bituminous binder and key aggregates and rolling with a three wheel 80-100 (eighty to one hundred) kN static roller to achieve the desired degree of compaction as per Technical Specification Clause 506 (five zero six) including carriage of all labour, equipments and materials to various location through all modes of transportation in all leads lifts and all incidental charges.
Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.275 kg (zero point two seven five kilogramme) per square metre on the prepared dry and hungry bituminous surface cleaned with Hydraulic broom as per Technical Specification Clause 503 (five zero three) and as per direction of Engineer in charge including carriage of all labour, equipments and materials to various locations through all modes of transportation in all lead & lifts and all incidental charges.
Providing and laying bituminous concrete 30mm ( Thirty milimetres) thick with 100-120 (one hundred to one hundred twenty) TPH batch type hot mix plant producing an average output of 75 (seventy five) tonnes per hour using crushed aggregates of specified grading, premixed with bituminous binder @ 5.5 (five point five ) per cent of total weight of mix, agreegate Grading II (thirteen milimetres nominal size) i.e. 13.2 - 10 mm thirty per cent, 10 - 5 mm twenty five per cent, 5 mm and below forty three per cent of volume of agreegate and filler @ 2 per cent of weight of aggregates, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 509 (five zero nine) complete in all respects and as per direction of Engineer in charge including carriage of all labour, equipments and materials to various locations through all modes of transportation in all lead & lifts and all incidental charges.
Providing and laying of hot applied thermoplastic compound 2.5 mm (two point five milimeters) thick and 0.10 (point one zero) meter wide strip in Center line/ Edge line including reflectorising glass beads @ 250 gms ( two fifty grammes) per square meter area, thickness of 2.5 mm (two point five milimeters) is exclusive of surface applied glass beads as per IRC:35 (thirty five) in accordance with Ministory of Road Transport Specification (Latest revision) and IRC Code. The finished surface to be level, uniform and free from streaks and holes including carriage of all labour, equipments and materials to various location through all modes of transportation in all leads lifts and all incidental charges
PAWAN SHARMA
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .