Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹2.0 LAccepted-AOC 268 KARGALI BAZAR BERMO BOKARO 829104 JHARKHAND | BOKARO | JHARKHAND | 829104 | L-1 | Accepted-AOC Deposited performance security money | |
| 2 | L-2₹2.0 L+₹1,628.40 (0.81%)Rejected-Finance 01 PURANA DAKKHANA CIVIL LINE GANDHI NAGAR BASTI UTTAR PRADESH 272001 | BASTI | UTTAR PRADESH | 272001 | L-2 | Rejected-Finance Not Evaluated | |
| 3 | Rejected-Technical 108 BIBIZAI CHOURAHA NEAR GANDHAK FACTORY SHAHJAHANPUR UTTAR PRADESH 242001 | SHAHJAHANPUR | UTTAR PRADESH | 242001 | - | Rejected-Technical Technically disqualified |
Tender Value
₹2.0 L
EMD Value
₹2,600
Closing Date
4 Mar 2025, 11:00 amClosed
SO(EnM), BnK
GM Office, BnK Area, Bermo, Bokaro, Jharkhand
Disconnection and re-handling of cable and its stacking , dismantling, pulling and shifting of 1no 500 kva 3.3kv/440v and 2no 100 kva 3.3kv/440v transformer from different location at Kargali washery premises/room under BnK Area.
2025_CCL_329795_10
SO(EnM)/e-tender/24-25/29
Open Tender
Electrical and Maintenance Works
Item Rate
10 days
Kargali washery
As per NIT
2 documents required · 2 mandatory
₹2,600
1 Apr 2025
22 Feb 2025
5 Mar 2025
22 Feb 2025
4 Mar 2025
24 Feb 2025
22 Feb 2025 - 1 Mar 2025
Amount
Cleaning the way and removal of sludge for recovery of the transformers and safety disposal within 50m as per instruction of engineer in charge.
Disconnection, re-organization, handling of HT /LT busbar and control cables of different sizes to a safe place to avoid any hindrance in the workplace as per instruction of Engineer In-Charge (both substaions)
Dismantling of auxiliary parts draining of oil, pulling shifting of transformer to a safe and assessable place for easy loading and transportation of transformer
Loading of 500 KVA transformer on truck /mechanical means (crane/hydra/pulley system to be arranged by the agency)
Loading of two nos 100 KVA transformer on truck /mechanical means (crane/hydra/pulley system to be arranged by the agency)
Unloading of transformer at the site as per instruction of engineer in charge on truck /mechanical means(crane/hydra/pulley system to be arranged by the agency) 500 KVA
Un-Loading of two nos 100 KVA transformer on truck /mechanical means (crane/hydra/pulley system to be arranged by the agency)
Dismantalling and rehandling and stacking of 3.3 KV HT 3 core PVC armoured cable as per instruction of engg inch.
Cutting of iron structure for recovery of all the three transformers
Supervision & incidental overhead expenses cost @ 15 % of sl no 1 to 9
Total impact of GST for the purpose of CTC
M/s Geeta Enterprises (BID ID -1134281)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .