| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹14.7 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹14.8 L+₹7,670 (0.52%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹15.3 L+₹64,340 (4.38%)Rejected-Finance BAZARPATTY WARD NO 09 NORTH LAKHIMPUR DIST LAKHIMPUR ASSAM | LAKHIMPUR | ASSAM | 787001 | L3 | Rejected-Finance L3 | |
| 4 | L4₹16.0 L+₹1.3 L (8.64%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹19.1 L+₹4.4 L (30.1%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
₹22.4 L
Closing Date
1 Nov 2021, 6:00 pmClosed
SM(E-C) RHQ, NER
1st Floor New RHQ building AAI Guwahati Airport
Construction of interim link taxi track connecting existing Apron to proposed FTO Apron at Lilabari Airport
2021_AAI_92096_1
AAI/LBR/SM(E-C)/FTO Apron/21-22
Open Tender
Civil Works
Item Rate
120 days
Lilabari Airport
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
Exempted
20 Dec 2021
21 Oct 2021
3 Nov 2021
22 Oct 2021
1 Nov 2021
22 Oct 2021
22 Oct 2021 - 27 Oct 2021
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge. All kinds of soil
Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift upto 1.5 m as directed by Engineer-in-charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:5:10 (1 cement : 5 coarse sand (zone-III): 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses,plinth and string courses etc.
Providing, hoisting and fixing above plinth level up to floor five level precast reinforced cement concrete work in string courses, bands, copings, bed plates, anchor blocks, plain window sills , cover slabs and the like, including the cost of required centering, shuttering but , excluding cost of reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. Thermo-Mechanically Treated bars of grade Fe-500D or more.
Construction of Subgrade embankment with Moorum brought out from approved quarry outside the airport premises. The complete operation will include spreading the Moorum with dozer, dressing, levelling, providing camber, grading with motor grader and consolidating with vibratory roller 8-10 tonne capacity including making good the undulation etc. as per technical specifications and drawings complete and directions of Engineer-in-Charge. (Cost includes all leads, taxes, royalty and operations)
Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in for all leads & lifts, laying in uniform layers with mechanical paverfinisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achievethe desired density, complete as per specifications and directions of Engineer-in-Charge
Providing and laying design mix cement concrete of M-30 grade/PQC, in roads/ taxi tracks/ runways, using cement content as per design mix, using coarse sand and graded stone aggregate of 40 mm nominal size in appropriate proportions as per approved & specified design criteria, providing dowel bars with sleeve/ tie bars wherever required, laying at site, spreading and compacting mechanically by using needle and surface vibrators, levelling to required slope/ camber, finishing with required texture, including steel form work with sturdy M.S. channel sections, curing, making provision for contraction/ expansion, construction & longitudinal joints (10 mm wide x 50 mm deep) by groove cutting machine, providing and filling joints with approved joint filler and sealants, complete all as per direction of Engineer-in-charge (Item of joint fillers, sealants, dowel bars with sleeve/ tie bars to be paid separately) Note:- Cement content considered in M-30 is @ 340 kg/cum. Excess/less cement used as per design mix is payable/ recoverable separately Cement concrete prepared with batch mixing machine
Providing and laying in position bitumen hot sealing compound for expansion joints etc Using grade ‘A’ sealing compound.
Painting runway/taxi track/apron marking with adequate nos of coats to give uniform finish with road marking paint of superior make as approved by the Engineer-in-charge, i/c cleaning the surface of ail dirt, scales, oil, grease and other foreign material etc. and lining out complete New work (Two or more coats)
Dismantling manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge : bituminous road
Providing and laying Non Pressure NP-3 class (Medium duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete 450 mm dia RCC pipes
Construction of dry lean cement concrete sub base over a prepared sub-grade with coarse and fine aggregate conforming to IS:383, the size of coarse aggregate not exceeding 25 mm, aggregate cement ratio not to exceed 15:1, aggregate gradation after blending to be as per specifications, cement content not to be less than 150 Kg/cum, optimum moisture content to be determined during trial length construction, concrete strength not to be less than 10 Mpa at 7 days, mixed in a batching plant, transported to site, for all leads & lifts, laid with a mechanical paver, compacting with 8-10 tonne vibratory roller, finishing and curing etc. complete as per direction of Engineerin-charge.
Providing and laying polythene sheet of thickness 400 micron conforming to IS:2508, on the base course with overlaps of not less than 300 mm longitudinally and 300 mm transversely over and including a base layer of 6mm thick fine sand complete as per specifications and as directed by Engineer-in-charge (Note- Only plan area shall be measured for payments)
Carriage of materials by Mechanical Transport including loading, unloading and stacking as per the direcitions of Engineer in charge . Earth-1 km
M/s Basu Dev Das
BINOD KUMAR PRASAD
Mussadik Iqbal Hazarika
DHIRAJ GOGOI
Rynaa Constructionz India
JC Construction Pvt Ltd
M/s Gollo Group of Industries
Pancham Kumar Baruah
stage.html
html • 0.06 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .