Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L12₹38.6 L+₹7.1 L (22.5%)Accepted-AOC | L12 | Accepted-AOC Accepted being lowest bonafide tenderer | |
| 2 | L1₹31.5 LRejected-AOC 59 NEW MARKET CLOCK TOWER DEHRADUN UK PIN 248001 | DEHRADUN | UTTARAKHAND | 248001 | L1 | Rejected-AOC Non bonafide being quoted less than min fare wage | |
| 3 | L2₹35.4 L+₹3.9 L (12.3%)Rejected-AOC | L2 | Rejected-AOC Non bonafide being quoted less than min fare wage | |
| 4 | L3₹36.0 L+₹4.5 L (14.3%)Rejected-AOC | L3 | Rejected-AOC Non bonafide being quoted less than min fare wage | |
| 5 | L4₹36.0 L+₹4.5 L (14.3%)Rejected-AOC 303 GHS 888 SECTOR 20 PANCHKULA 134116 HARYANA | PANCHKULA | PANCHKULA | HARYANA | 134116 | L4 | Rejected-AOC Non bonafide being quoted less than min fare wage |
Tender Value
₹42.4 L
EMD Value
₹84,000
Closing Date
5 Aug 2020, 6:00 pmClosed
GE (AF) Chandigarh
GE (AF) Chandigarh PIN-160003
MANNING AND OPERATION OF WATER SUPPLY, SEWAGE AND DG SET AT AF STN HIGH GROUND, BARWALA AND MULLANPUR UNDER GE (AF) CHANDIGARH
2020_MES_359348_1
GE (AF)/CHD/T-07/2020-2021
Open Tender
Civil Works
Item Rate
330 days
GE (AF) Chandigarh
All as per NIT and Tender Documents
9 documents required · 9 mandatory
₹500
GE (AF) Chandigarh
₹84,000
Yes
24 Sept 2020
8 Jul 2020
7 Aug 2020
8 Jul 2020
5 Aug 2020
29 Jul 2020
Amount
Manning and Operation of Water supply installation (Checking machine) with Engine, Alternator, AMF Panel, LT Panels etc, water cooled, electrical control panel complete for three shifts of 8 hrs each per day by deploying 01 Operator FGM (Semi Skilled) per shift including Sundays and Holidays all as specified and as directed for the followings:- (a) PUMP HOUSE NO - 5 (High Grounds) :- Installation comprising of the following :- (i) Submersible pump set driven by 3 Phase 415 volts elect motor of 30/38 HP -01 No (ii) DG Set of 40 KVA capacity 3 Phase 415 volts - 01 No(for operation of water supply installation at stand by elect supply) (iii) DG Set of 35 KVA capacity 3 Phase 415 volts - 01 No (for operation of perimeter/security lights in case of power supply failure) (iv) Chemical dozing equipments, control valves etc. (v) Operation of all valves of Rising /supply lines from pump house to OH tank and distribution line to the entire complex at OH Tank area. (b) PUMP HOUSE NO-6 (High Grounds) :- Installation comprising of the following :- (i) Submersible pump set driven by 3 Phase 415 volts elect motor of 30/38 HP -01 No (ii) DG Set of 40 KVA capacity 3 Phase 415 volts - 01 No (for operation of water supply installation at stand by elect supply) (iii) Chemical dozing equipments, control valves etc. (iv) Operation of all valves of Rising /supply lines from pump house to OH tank and distribution line to the entire complex at OH Tank area.
Manning and Operation of sewage treatment installation (Checking machine) with pump , motor, Engine, Alternator, LT Panels etc, aerator ,oxidation , Sewage pump , electrical control panel complete for one shift of 8 hrs each per day by deploying 01 Operator FGM (Semi Skilled) including Sundays and Holidays all as specified and as directed for the followings:- (a) Sewage Treatment Plant (High grounds) Installation comprising of the following :- (i) Submersible type non clog sewage pump set driven with 3 phase 415 volts 5 HP elect motor -02 Nos (ii). Oxidization ditch mechanism – 01 No (iii). Peripheral central drive mechanism clarifier/Secondary clarifier - 01 No (iv) Return Sludge tank – 01No (iv) Active carbon filter – 01No (v) Monoblock type horizontal sewage pump set driven with 3 phase 415 volts 3HP elect motor -02 Nos (vi) Monoblock type horizontal sludge pump set driven with 3 phase 415 volts 2 HP elect motor -02 Nos (b) Old Sewage pump house (High grounds) Installation comprising of the following :- (i) Submersible pump with 3 phase electrical motor 5 HP - 01 No (ii) Monobloc non clog Sewage pump with 3 phase electrical motor 7.5 HP - 01 No (c) DG set 30KVA (High Grounds)
Manning and Operation of DG set (high Grounds) complete installation (Checking machine) with Engine, Alternator, AMF Panel, LT Panels etc, water cooled, electrical control panel complete for three shifts of 8 hrs each per day by deploying 01 Operator FGM (Semi Skilled) per shift including Sundays and Holidays all as specified and as directed for the followings:- (i) DG set of 75 KVA at Signal Section.-02 Nos ii). DG set of 63 KVA at TOP.-01 No
Manning and Operation of DG set (High Grounds) complete installation (Checking machine) with Engine, Alternator, AMF Panel, LT Panels etc, water cooled, electrical control panel complete for three shifts of 8 hrs each per day by deploying 01 Operator FGM (Semi Skilled) per shift including Sundays and Holidays all as specified and as directed for the followings:- (a). DG set of 400KVA at Avionics Lab/MIG 27.-01 No. (b). DG set of 82.5KVA at MIG 29.-01 No. (c). DG set of 10KVA at IMMOLS.-01 No
Manning and Operation of Water supply installation (Checking machine) with Engine, Alternator, AMF Panel, LT Panels etc, water cooled, electrical control panel complete for three shifts of 8 hrs each per day by deploying 01 Operator FGM (Semi Skilled) per shift including Sundays and Holidays all as specified and as directed for the followings:- (a) PUMP HOUSE NO- 1 (Barwala) :- Installation comprising of the following :- (i) Submersible pump set head driven by 3 Phase 415 volts elect motor of 30 HP -01 No (ii) DG Set of 30 KVA capacity 3 Phase 415 volts-01 No (for operation of water supply installation at stand by elect supply( Installed at Power House No 2) (iii) Chemical dozing equipments, control valves etc. (iv) Operation of all valves of Rising /supply lines from pump house to OH tank and distribution line to the entire complex at OH Tank area. (b) PUMP HOUSE (New) Barwala:- Installation comprising of the following :- i) Submersible pump set by 3 Phase 415 volts elect meter of 30 HP -01 Nos ii) DG Set of 40KVA capacity 3 Phase 415 volts-01 Nos(for operation of water supply installation at stand by elect supply) iii) Chemical dozing equipments, control valves etc. (iv) Operation of all valves of Rising /supply lines from pump house to OH tank and distribution line to the entire complex at OH Tank area.
Manning and Operation of Water supply installation (Checking machine) LT Panels etc, water cooled, electrical control panel complete for three shifts of 8 hrs each per day by deploying 01 Operator FGM (Semi Skilled) per shift including Sundays and Holidays all as specified and as directed for the followings:- (a) PUMP HOUSE (Mullanpur) :- Installation comprising of the following :- (i) Submersible pump set head driven by 3 Phase 415 volts elect motor of 30 HP -01 No (ii) DG Set of 30 KVA capacity 3 Phase 415 volts-01 No (for operation of water supply installation at stand by elect supply( Installed at Power House No 2) (iii) Chemical dozing equipments, control valves etc. (iv) Operation of all valves of Rising /supply lines from pump house to OH tank and distribution line to the entire complex at OH Tank area. (b) PUMP HOUSE (Mullanpur) - Installation comprising of the following :- i) Submersible pump set by 3 Phase 415 volts elect meter of 30 HP -01 Nos ii) DG Set of 40KVA capacity 3 Phase 415 volts-01 Nos(for operation of water supply installation at stand by elect supply) iii) Chemical dozing equipments, control valves etc. (iv) Operation of all valves of Rising /supply lines from pump house to OH tank and distribution line to the entire complex at OH Tank area.
Notes applicable for Serial item No. 1.00 to 06.00 :- Rate quoted by the contractor shall deemed to be inclusive of following :-for (a) Operators will operate the DG Sets and AMF Panels at the installation complete as directed by Engineer-In-Charge. (b) The operator shall record the reading of plant, voltage, Amps in proper log sheet/register in a format as approved by GE. (c) Spares parts such as fan belt, oil grease, cotton waste etc shall be provided by contractor for replacement/maintenance for the cost of the same is deemed to be included in the quoted rates and nothing extra shall be paid. (d) Contractor will provide stationery , Uniform to employees and area cleaning around the DG Set installations and cost of the same shall be deemed included in the quoted rate and nothing shall be paid extra. (e) Contractor shall be responsible for uninterrupted operation of complete installation. (f) Cost of petty /minor repair to LT panel / Plant deemed to be included in the rate quoted except spare / parts if any required.
Notes applicable for Serial item No. 1.00 to 6.00 :- Rate quoted by the contractor shall deemed to be inclusive of following :- (1) Proper uniform, label containing name plate of the operator and safety shoes as approved by Engineer-in-Charge shall be worn by operator on duty. If any operator found in improper uniform and or found without proper name plates contractor shall be liable to pay penalty at the rate of Rs 200.00 per shift of 8 hours per person. (2) Proper facilities for sitting/ rest area shall be the responsibility of contractor. (3) Operator on duty shall not be allowed to leave the installation without reliever. Any operator found absent from duty a recovery of Rs. 200/- per hour per installation for the period of absent will be made from the contractor (4) Fuel engine /lubricating oil shall be issued by department (MES) as "free for filling" as and when required by the contractor. Transportation for collection of fuel and engine oil shall be arranged by the contractor. Delay in operation of DG Set will invite recovery @500/- per hour. (5) Contractor shall employ ITI qualified personnel with two year experience in revelent trade .Contractor shall submit documents of deployed manpower along with qualification / Experience certificate within 15 days from the date of commencement of work to GE duly verified by Engineer-in-Charge . Contractor shall be liable to pay penalty at the rate of Rs 100.00 per person per day if required qualification/Experience certificates of deployed manpower not submitted after 15 days from the date of commencement of work. (6) Duty roaster for deployment of manpower installation wise will be prepared by the contractor and submitted to Engineer-in-Charge for verification. Compliance of payment of minimum fair wages register duly verified by Engineer-in-Charge shall be submitted before claiming any RAR. Non compliance of above said requirement will lead to non payments and the contractor shall be solely responsible for the same.
Notes applicable for Serial item No. 1.00 to 6.00 :- Rate quoted by the contractor shall deemed to be inclusive of following :- (1) Workers wage per person (a) Semi Skilled - 492.00 (2) Employees state insurance @ 4.00% (employer contribution 3.25% & employee contribution 0.75%) on wages as per existing rules. (3)EPF, EPS, EDLIS and administrative charges @ 13% on wages as per existing rules. (4) Bonus if applicable as per existing rules. (5) Contractor's over head and profit (6) LWC @ 1% on 1 to 5 above as per existing rules (7) GST @ 18% on 1 to 5 above as per existing rules.
Notes applicable for Serial item No. 1.00 to 06.00 :- Rate quoted by the contractor shall deemed to be inclusive of following :- (1) The Rate quoted shall not be less than minimum wages as notified by Government of India/State Government / Local body whichever is higher incl all statutory provisions such as EPF, ESIC, Bonus, taxes etc as applicable. (2) The Firms 's claims in bills regarding ESI, EPF, Services Tax should be accompanied by documentary proof pertaining to the previous months bill. Arequisite portion of the bill i.e RAR/Final Bill amount shall be held up till such proof is furnished at the discretion of the GE. (3) The firm shall submit proof of payment given to workers and endorse a copy to Engineer-in-Charge, showing the details of payments, deductions (incl all statutory deductions) and net amount with requisite challans in each case/person indicating PF number, ESI card detail etc. (4) Engineer-in Charge will maintain the record of attendance in respect ofthe persons deployed by the firm on the basis of which wages / remuneration will be decided in repect of the persons at the approved and agreed rates. The firm shall be responsibele to keep all records of payment, attendance, leaves etc. duly signed by the Engineer in Charge and endorse a copy of all the documents with RAR/Final Bill as applicable. (5) In compliance of Govt of India Gazette Notification dated 15 Feb 2017 & MoD EPFO even letter No. CA10/011 (33) 2015/HQ/Vol-II dated 02 Feb 207, It is an express condition of the contract that:- (i) The contractor has to make the payment of minimum wages of employees of labours directly into AADHAR LINKED BANK ACCOUNT of individual only and proof of payment of wages through Aadhar linked bank account of contractor has to be submitted alongwith payments viz RARs & or Final Bill. (6) Also refer Sch A Notes given in tender documents.
P.K.MALL ENTERIPRSES
M/S Trilok chand sharma
R D Bansal
ALPHA ENGINEERS AND BUILDERS
M/s Super Trading Corporation
Raman Electric Trading Co
POWER ELECTRONICS ENGINEERS
M/S BALWINDER SINGH
Ashish Sehgal and Co.
M/S MAISUR CONSTRUCTION COMPANY PRIVATE LIMITED
DIAMOND ELECTRICALS
Bal Singh and Sons
ELECTROMAX OF INDIA
PARTAP ENGINEERING WORKS
Choice india
G M CONSTRUCTION COMPANY
stage.html
html • 0.09 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .