Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹21.9 CrAdmitted-Finance | ₹21.9 Cr | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | k.g.gunasekaran L1 |
|---|---|---|---|---|
| 1.00 | Removing the black topping of 30cm thickness and forming cable open trench and cable duct at road crossing 60 cm wide and 135 cm deep (clear) including cost of using machinary providing danger lights, indication arrangements wherever necessary labour, lead, lift, tools and plants etc., complete. The removed Tar blacks, RCC/PCC and other debris shall be removed from site before the start of excavaion of trench. | 154 | Rm | 215 ₹33,110 Lowest |
| 2.00 | Earth work excavation in all soils to a depth from 31cm to 135cm including slush and silt under water requiring the aid of basket and vessels and forming cable trench and cable duct including cost of signal boards, danger lights, indication arrangements wherever necessary and providing shoring and strutting arrangements wherever necessary all labour, lead, lift, tools and plants etc., complete.The excavated earth should be placed in one side of trench preferably on foot path side , not to obstruct free flow of traffic. | 106 | Cum | 785 ₹83,210 Lowest |
| 3.00Dismantling the brickwork, PCC , RCC inside the cable trench and cable duct wherever occur of any thickness and clearing the trench/duct free from debris and without hinderence to thefree from debris and without hinderence to thecable laying work including lead, lift, labour,tools & plants etc., complete as per direction of Engineer-in-charge. | ||||
| 3.01 | Dismantling BW in CM - 1cum | 10 | Cum | 500 ₹5,000 Lowest |
| 3.02 | Dismantling PCC - 1cum | 13 | Cum | 2,000 ₹26,000 Lowest |
| 3.03 | Dismantling RCC - 1cum | 13 | Cum | 6,750 ₹87,750 Lowest |
| 4.00 | Drilling, Reaming & Laying of 33 KV Cable (3Nos). Using Trenchless Technology Method at a depth of about 1.50meters or more by using directional drilling unit equipped with automated pipe handling system (Horizontal Directional Drilling Machine), Using bentonite mud mixing system and all necessary accessories using pulling the cable carefully without damaging other service like telephone, Internet cables, Water pipes, etc., installation including cost of pipe, hire charges for all the accessories and equipment etc. Taking the necessary drive pit for drilling & laying the cable, remove the excavated earth. The rate quoted for including the charge of GPR (Ground Penetrating radar ) Survey for identify the existing utility in the proposed bore path and including cost of making entry pit and exit pit for every 250 meters minimum intervals (Along the Road) | 13,151 | RM | 4,025 ₹5,29,32,775 Lowest |
| 5.00 | Providing barricading works for laying cables using steel barricades with green barricade construction safety nets continously without gap inclusive material cost, labour charges and removal charges after completing the work etc complete and warning tape as directed by the engineer at site. | 322 | RM | 300 ₹96,600 Lowest |
| 6.00 | Labour charges for Laying of 140 mm dia PVC pipes, cutting and jointing the pipe,tying with 7/20SWG G.I.wire inside the pipe and closing the ends with end cap including cost of PVC specials, labour, lead, lift, T&P etc., complete 140 mm dia PVC pipe | 696 | RM | 1,275 ₹8,87,400 Lowest |
| 7.00 | Laying plain cement concrete 1:3:6, using 20mm BG metal for bottom portion of trench for fixing PVC pipe in the cable duct in proper alignment and level as per std.specification including cost of all materials, labour, lead, lift etc., complete. | 97 | Cum | 9,100 ₹8,82,700 Lowest |
Tender Value
Refer Docs
EMD Value
₹9.4 L
Closing Date
11 Feb 2026, 3:00 pmClosed
SE/CDC/SCHEMES
A10 TVK Est Guindy
Supply Laying jointing teriminating testing and commissioning of 33 KV 1X630 sqmm Aluminium XLPE Cable from Mepz 110 KV SSfrom Pallikaranai 110KV SS to the proposed 33 11 kV indoor SS at Hasthinapuram and 11 KV 3X300 sqmm XLPE UGCable under Turnkey
2026_EB_651528_1
OT.NO.16 of 2025-26
Open Tender
Electrical Works
Turn-key
A10 TVK Est Guindy
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹9.4 L
Yes
18 Feb 2026
5 Feb 2026
12 Feb 2026
5 Feb 2026
11 Feb 2026
7 Feb 2026
5 Feb 2026 - 10 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Removing the black topping of 30cm thickness and forming cable open trench and cable duct at road crossing 60 cm wide and 135 cm deep (clear) including cost of using machinary providing danger lights, indication arrangements wherever necessary labour, lead, lift, tools and plants etc., complete. The removed Tar blacks, RCC/PCC and other debris shall be removed from site before the start of excavaion of trench. | 154 | Rm | - | - |
| 2 | Earth work excavation in all soils to a depth from 31cm to 135cm including slush and silt under water requiring the aid of basket and vessels and forming cable trench and cable duct including cost of signal boards, danger lights, indication arrangements wherever necessary and providing shoring and strutting arrangements wherever necessary all labour, lead, lift, tools and plants etc., complete.The excavated earth should be placed in one side of trench preferably on foot path side , not to obstruct free flow of traffic. | 106 | Cum | - | - |
| 3Dismantling the brickwork, PCC , RCC inside the cable trench and cable duct wherever occur of any thickness and clearing the trench/duct free from debris and without hinderence to thefree from debris and without hinderence to thecable laying work including lead, lift, labour,tools & plants etc., complete as per direction of Engineer-in-charge. | |||||
| 3.01 | Dismantling BW in CM - 1cum | 10 | Cum | - | - |
| 3.02 | Dismantling PCC - 1cum | 13 | Cum | - | - |
| 3.03 | Dismantling RCC - 1cum | 13 | Cum | - | - |
| 4 | Drilling, Reaming & Laying of 33 KV Cable (3Nos). Using Trenchless Technology Method at a depth of about 1.50meters or more by using directional drilling unit equipped with automated pipe handling system (Horizontal Directional Drilling Machine), Using bentonite mud mixing system and all necessary accessories using pulling the cable carefully without damaging other service like telephone, Internet cables, Water pipes, etc., installation including cost of pipe, hire charges for all the accessories and equipment etc. Taking the necessary drive pit for drilling & laying the cable, remove the excavated earth. The rate quoted for including the charge of GPR (Ground Penetrating radar ) Survey for identify the existing utility in the proposed bore path and including cost of making entry pit and exit pit for every 250 meters minimum intervals (Along the Road) | 13,151 | RM | - | - |
| 5 | Providing barricading works for laying cables using steel barricades with green barricade construction safety nets continously without gap inclusive material cost, labour charges and removal charges after completing the work etc complete and warning tape as directed by the engineer at site. | 322 | RM | - | - |
| 6 | Labour charges for Laying of 140 mm dia PVC pipes, cutting and jointing the pipe,tying with 7/20SWG G.I.wire inside the pipe and closing the ends with end cap including cost of PVC specials, labour, lead, lift, T&P etc., complete 140 mm dia PVC pipe | 696 | RM | - | - |
| 7 | Laying plain cement concrete 1:3:6, using 20mm BG metal for bottom portion of trench for fixing PVC pipe in the cable duct in proper alignment and level as per std.specification including cost of all materials, labour, lead, lift etc., complete. | 97 | Cum | - | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.77 MB
BOQ_781301.xls
BOQ • 0.44 MB
otno16sp.pdf
Tender Documents • 2.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .