Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.1 CrAccepted-AOC A 18 FIRST FLOOR FIEE COMPLEX OKHLA INDUSTRIAL AREA PHASE II NEW DELHI | ₹1.1 Cr | L1 | Accepted-AOC L1 |
Tender Value
Refer Docs
Closing Date
25 Aug 2022, 12:00 pmClosed
DCE, C and M Department
3rd floor, C and M Deptt.,DVC TOWERS, KOLKATA-700054
Integration of SAS and Bus bar protection scheme on OEM OES basis for 220KV and 33KV bay extension work at Kalyaneswari Sub-station
2022_DVC_124749_1
DVC/Ten/HQ/SPE/CMM/WS/00047
Single
Miscellaneous Works
Item Rate
120 days
Kalyaneswari Sub-station
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
Exempted
30 Dec 2022
4 Aug 2022
26 Aug 2022
4 Aug 2022
25 Aug 2022
4 Aug 2022
Amount
SUPPLY
PART-A : SAS Integration of 220KV & 33KV bays to existing GE system (SAS) complete in all respect including supply of necessary items/hardware for successful commissioning of the scheme and all necessary modifications in Database as per scope requirement :
Supply of Hardware :
Supply of EFS (minm. 16 FO port switch)
Supply of Patch Cord (for IED-EFS connectivity and EFS-EFS connectivity) 10 Meter ST-ST Patchcord
FO cable ( 6 core unarmored) with accessories, conduit,etc. for extension of LAN, LIU, etc.
FO Splicing and termination items
Part- B: Busbar scheme Augmentation for 2 Nos. 220KV PTR bays into existing GE system, complete in all respect with necessary modifications including supply of necessary hardware/ items for successful commissioning of the scheme.
Supply of Hardware :
Supply of Communication Card for Existing MICOM P741
Supply of MICOM P743
Communication cable from P741 to new P743 as per requirement
ERECTION & COMMISSIONING WORKS
PART-A : SAS Integration of 220KV & 33KV bays to existing GE system (SAS) complete in all respect including supply of necessary items/hardware for successful commissioning of the scheme and all necessary modifications in Database as per scope requirement :
SAS Integration of 220KV & 33KV bays to existing system complete in all respect including supply of necessary items/hardware and all necessary modifications in Database as per scope requirement for successful commissioning of the scheme
Part- B: Busbar scheme Augmentation for 2 Nos. 220KV PTR bays into existing GE system, complete in all respect with necessary modifications including supply of necessary hardware/ items for successful commissioning of the scheme.
Busbar scheme Augmentation/ Integration for 2 Nos. 220KV PTR bays into existing GE system, complete in all respect including supply of necessary hardware/ items for successful commissioning of the scheme.
stage.html
html • 0.04 MB
tech_eval.pdf
PDF • 0.31 MB
fin_eval.pdf
PDF • 0.31 MB
aoc.pdf
PDF • 2.99 MB
finance_136100.pdf
boq_comp_chart.xlsx
xlsx • 0.01 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .