| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.8 LAccepted-AOC | L1 | Accepted-AOC Accept | |
| 2 | L2₹5.9 L+₹7,057 (1.22%)Rejected-Finance 191 CHERAN THOZHILALAR COLONY 9TH STREET DHARAPURAM ROAD MU CHETTIPALAYAM TIRUPPUR 641 606 TAMIL NADU | TIRUPPUR | TAMIL NADU | 641606 | L2 | Rejected-Finance Highest |
| Sl No | Description | Qty | Unit | SUDHEKSHA CONSTRUCTION L1 | M/s. Hari Constructions L2 |
|---|---|---|---|---|---|
| 1.00 | Earthwork excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales,murram, ordinary earth, earth mixed with 50% fair sized boulders etc., with initial lead and lifts including laying, sprading, levelling sectioning breaking clods etc., incuding all incidential changes complete as per standard specification for foundation SS 20B | 40 | Cum | 184 ₹7,360 Lowest | 190 ₹7,600 |
| 2.00 | Cement concrete of mix 1:4:8 (One cement four sand eight aggregates) using 40mm guage hard broken including cost conveyance of all materials to site and labour charges, transporting and placing in position including shoring, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification | 9 | Cum | 5,039 ₹45,351 Lowest | 5,100 ₹45,900 |
| 3.00 | Cement concrete of mix 1:3:6 (One cement Three sand Six aggregates) using 20mm guage hard broken including cost conveyance of all materials to site and labour charges, transporting and placing in position including shoring, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification | 23 | Cum | 5,769 ₹1,32,687 Lowest | 5,800 ₹1,33,400 |
| 4.00 | Supplying, Fabricating and placing in position TMT bars for all reinforced cement concrete items of work including cost of steel transporting straightening cutting, bending, cranking binding welding etc. Including cost of binding wire MS.chairs laps to fix the reinforcement in all positions, all labour and materials complete complying with standard specifications and drawings and as directed by the departmental Engineers. | 50 | Kg | 89.5 ₹4,475 Lowest | 91 ₹4,550 |
| 5.00 | Reinforced cement concrete 1:1 1/2:3 Mix(One part cement, One and half part sand, and three part of hard broken stone) using 20 mm ISS HBG Metal including cost and conveyance of all materials to the work site including all labour charges for mixing,laying,ramming,consolidation and curing etc., complete as per standard specifications. | 0.5 | Cum | 8,760 ₹4,380 Lowest | 8,800 ₹4,400 |
| 6.00 | Finishing the top of flooring with granothitic flooring with cement concrete 1:2:4 (one cement, two sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete. | 38 | Sqm | 157 ₹5,966 Lowest | 160 ₹6,080 |
| 7.00 | Supplying and errecting of Centering charges for sides and soffits of concrete work including cost and conveyance of all materials and all labor charges etc., Complete as per Standard Specifications | 150 | Sqm | 459 ₹68,850 Lowest | 462 ₹69,300 |
| 8.00 | Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH | 36 | Cum | 2,024 ₹72,864 Lowest | 2,100 ₹75,600 |
| 9.00 | Supplying and laying Precast Designer Paver Block TAMIN Paver Block confirming to IS 1568-2006 specification manufacturing and laying standard of M50 grade 83mm thick (table clauses 5 and 9.14) suitable for bus terminals industrial complexes road on expensive soils etc., including the cost of paver block of size 225mm x 12.50 mm x 80mm and conveyance of materials to work site mentioned in the tender schedule cost of loading and unloading handling during over sand bed of 150mm thick (excluding the cost of sand) conveyance paver block cutter to site and hire charges of vibrators and block cutter operator and labour for leveling the sand to paver block etc., complete ISI 15658-2006. | 240 | Sqm | 991 ₹2,37,840 Lowest | 1,000 ₹2,40,000 |
Tender Value
Refer Docs
EMD Value
₹7,100
Closing Date
13 Dec 2024, 3:00 pmClosed
Executive Officer
Town Panchayat Office Keeranur
Providing Paver Block Road with Drain at 2nd ward Selva vinayagar kovil west side Devar House to 2nd Lane street in Keeranur Town Panchayat
2024_DTP_508374_1
230/2024
Open Tender
Civil Works - Roads
Works
90 days
Keeranur
Class II
2 documents required · 2 mandatory
₹0
₹7,100
12 Sept 2025
6 Dec 2024
13 Dec 2024
6 Dec 2024
13 Dec 2024
6 Dec 2024
Amount
Earthwork excavation in all classes of soils such as hard stiff clay, stiff black cotton, hard red earth, shales,murram, ordinary earth, earth mixed with 50% fair sized boulders etc., with initial lead and lifts including laying, sprading, levelling sectioning breaking clods etc., incuding all incidential changes complete as per standard specification for foundation SS 20B
Cement concrete of mix 1:4:8 (One cement four sand eight aggregates) using 40mm guage hard broken including cost conveyance of all materials to site and labour charges, transporting and placing in position including shoring, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification
Cement concrete of mix 1:3:6 (One cement Three sand Six aggregates) using 20mm guage hard broken including cost conveyance of all materials to site and labour charges, transporting and placing in position including shoring, forming protective bunds, cofferdams bailing out of water labour for mixing compacting, finishing and curing, working at depths, tools and plants and incidental charges such as sheeting, shoring and bracing and their subsequent removal etc., complete as per standard specification
Supplying, Fabricating and placing in position TMT bars for all reinforced cement concrete items of work including cost of steel transporting straightening cutting, bending, cranking binding welding etc. Including cost of binding wire MS.chairs laps to fix the reinforcement in all positions, all labour and materials complete complying with standard specifications and drawings and as directed by the departmental Engineers.
Reinforced cement concrete 1:1 1/2:3 Mix(One part cement, One and half part sand, and three part of hard broken stone) using 20 mm ISS HBG Metal including cost and conveyance of all materials to the work site including all labour charges for mixing,laying,ramming,consolidation and curing etc., complete as per standard specifications.
Finishing the top of flooring with granothitic flooring with cement concrete 1:2:4 (one cement, two sand and four aggrigate) using 10 to 12mm stone chips – 25mm tk etc., Complete.
Supplying and errecting of Centering charges for sides and soffits of concrete work including cost and conveyance of all materials and all labor charges etc., Complete as per Standard Specifications
Providing and laying, spreading and compacting graded stone aggregates to Wet Mix Macadam 250mm thick specification including premixing the materials with water at OMC in mechnanical mix plant carriage of mixed material by tipper to site laying in uniform layers with pavers in Sub Base/ Base course on well prepared surface and compacting with vibratory roller to acheive the desired density including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., complete as per clause 406 of MORTH
Supplying and laying Precast Designer Paver Block TAMIN Paver Block confirming to IS 1568-2006 specification manufacturing and laying standard of M50 grade 83mm thick (table clauses 5 and 9.14) suitable for bus terminals industrial complexes road on expensive soils etc., including the cost of paver block of size 225mm x 12.50 mm x 80mm and conveyance of materials to work site mentioned in the tender schedule cost of loading and unloading handling during over sand bed of 150mm thick (excluding the cost of sand) conveyance paver block cutter to site and hire charges of vibrators and block cutter operator and labour for leveling the sand to paver block etc., complete ISI 15658-2006.
M/s. Hari Constructions (BID ID -1207952)
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .